ML20206E836
| ML20206E836 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 04/30/1999 |
| From: | Clifford J NRC (Affiliation Not Assigned) |
| To: | |
| Shared Package | |
| ML20206E840 | List: |
| References | |
| NUDOCS 9905050259 | |
| Download: ML20206E836 (8) | |
Text
F'l pam ye UNITED STATES NUCLEAR REGULATORY COMMISSION
'f WASHINGTON, D.C. 2006H001
\\...../
PUBLIC SERVICE ELECTRIC & GAS COMPANY PHILADELPHIA ELECTRIC COMPANY DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY I
DOCKET NO. 50-272 SALEM NUCLEAR GENERATING STATION. UNIT NO.1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 721 License No. DPR-70 1.
The Nuclear Regulatory Commission (the Commission or the NRC) has found that:
A.
The application for amendment filed by the Public Service Electric & Gas Company, Philadelphia Electric Company, Delmarva Power and Light Company and Atlantic
[
City Electric Company (the licensees) dated March 26,1998, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
i 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-70 is hereby amended to read as follows:
J 9905050259 990430 PDR ADOCK 05000272 P
{
2-(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 221, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of its date of issuance, to be implemented within 60 days.
FOR THE NUCLEAR REGULATORY COMMISSION
- V/
mes W. Clifford, hief, Section 2 roject Directorate l Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of issuance: April 30,1999 l
)
i ATTACHMENT TO LICENSE AMENDMENT NO. P21 i
FACILITY OPERATING LICENSE NO. DPR-70 DOCKET NO. 50-272 Revise Appendix A as follows:
Remove Paoes insert Paoes 3/4 8-6 3/4 8-6 t
\\
l i
i
ELECTRICAL POWER SYSTEMS 3/4.8.2 ONSITE POWER DISTRIBUTION SYSTEMS A.C. DISTRIBUTION - OPERATING LIMITING CONDITION FOR OPERATION I
3.8.2.1 The'following A. C. electrical busses shall be OPERABLE and energized from sources of power other than the diesel generators:
i 4 kvolt Vital Bus # 1A 4 kvolt Vital Bus # 1B 4 kvolt Vital Bus # 1C 460 volt Vital Bus # 1A and associated control centers 460 volt Vital Bus # 1B and associated control centers 460 volt Vital Bus # 1C and associated control centers 230 volt vital Bus # 1A and associated control centers 230 volt Vital Bus # 1B and associated control centers 230 volt Vital Bus # 1C and associated control centers 115 volt Vital Instrument Bus # 1A and Inverter
- 115 volt Vital Instrument Bus # 1B and Invert er
- 115 volt Vital Instrument Bus # 1C and Invertsr
- 115 volt Vital Instrument Bus # 1D and inverter
- APPLICABILITY:
MODES 1, 2, 3 and 4.
ACTION:
a.
With less than the above complement of A.C busses OPERABLE or energized, restore the inoperable bus to OPERABLE and energized status within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
b.
With one inverter inoperable, energize the associated A. C. Vital Bus within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />; restore the inoperable 1A, 1B, or 1C inverter to OPERABLE and energized status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />; restore the inoperable 1D inverter to OPERABLE and energized status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
SURVEILLANCE REQUIREMENTS 4.8.2.1 The specified A.C. busses shall be determined OPERABLE and energized from A.C.
sources other than the diesel generators at least once per 7 days by verifying correct breaker alignment and indicated power availability.
(*) An inverter may be disconnected from its DC source for up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for the purpose of performing an equalizing charge on its associated battery bank provided (1) its vital bus is OPERABLE and energized, and (2) the vital busses associated with the other battery banks are OPERABLE and energized.
SALEM - UNIT 1 3/4 8-6 Amandaant No.221
m
[pann q
UNITED STATES l
,j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2066M001 i
PUBLIC SERVICE ELECTRIC & GAS COMPANY PHILADELPHIA ELECTRIC COMPANY DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-311 SALEM NUCLEAR GENERATING STATION. UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 203 License No. DPR-75 1.
The Nuclear Regulatory Commission (the Commission or the NRC) has found that:
A.
The application for amendment filed by the Public Service Electric & Gas Company, Philadelphia Electric Company, Delmarva Power and Light Company and Atlantic City Electric Company (the licensees) dated March 26,1998, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this amendment will not be inimical to the common defense ar.d security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as j
indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-75 is hereby amended to read as follows:
e
. (2) Technical Specificetions and Environmental Protection Plan The Technical Specifications contained in Appendices A and B, as revised through Amendment No.
, are hereby incorporated in the license. The licensee shall operate the facil in accordance with the Technical Specircations.
3.
This license amendment is effective as of its date of issuance, to be implemented within 60 days.
FOR THE NUCLEAR REGULATORY COMMISSION setr Ja es W. Clifford, ief, Section 2 Project Directorate i Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: April 30,1999 i--
I ATTACHMENT TO LICENSE AMENDMENT NO. xn FACILITY OPERATING LICENSE NO. DPR-75 DOCKET NO. 50-311 1
Revise Appendix A as follows:
)
Remove Paoes insert Paoes l
3/4 8-8 3/4 8-8 I
i
C ELECTRICAL POWER SYSTEMS 3/4.8.2 ONSITE POWER DISTRIBUTION SYSTEMS A.C. DISTRIBUTION - OPERATING LIMITING CONDITION FOR OPERATION 3.8.2.1 The following A. C. electrical busses shall be OPERABLE and energized from sources of power other than the diesel generators:
4 kvolt vital Bus # 2A 4 kvolt vital Bus # 2B 4 kvolt Vital Bus # 2C 460 volt Vital Bus # 2A and associated control centers 460 volt vital Bus # 28 and associated control centers 460 volt Vital Bus # 2C and associated control centers 230 volt vital Bus # 2A and associated control centers 230 volt vital Bus # 2B and associated control centers 230 volt vital Bus # 2C and associated control centers 115 volt Vital Instrument Bus # 2A and Inverter
- f 115 volt Vital Instrument Bus # 2B and Inverter
- 115 volt Vital Instrument Bus # 2C and Inverter
- I 115 volt Vital Instrument Bus # 2D.and Inverter
- APPLICABILITY:
MODES 1, 2, 3 and 4.
j
{
ACTION:
)
a.
With less than the above complement of A.C. busses OPERABLE or energized, restore the inoperable busses to OPERABLE and energized status within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />, b.
With one inverter inoperable, energize the associated A.C. Vital Bus l
within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />; restore the inoperable 2A, 2B, or 2C inverter to OPERABLE and energized status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />; restore the inoperable'2D inverter to OPERABLE and energized status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
SURVEILLANCE REQUIREMENTS 1
4.8.2.1 The specified A.C. busses and inverters shall be determined OPERABLE and energized from A.C. sources other than the diesel generators at least once per 7 days by verifying correct breaker alignment and indicated voltage on the busses.
- An inverter may be disconnected from its D.C. source for up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for the purpose of performing an equalizing charge on its associated battery bank provided (1) its vital bus is OPERABLE and energized, and (2) the vital busses associated with the other battery banks are OPERABLE and energized.
SALEM - UNIT 2 3/4 8-8 Amendment No. 203
.)