Provides Documentation of Noted Exceptions Re , Titled Statement of Completion & Request for Low Power Ol
ML20206E484
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 04/01/1987
From: Gucwa L
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
SL-2266, NUDOCS 8704130623
Download: ML20206E484 (3)


Text

,

Georgiz Fower Company 333 Piedmont Avenua.

Atlanta, Georgia 30308 Telephone 404 5264526 Mailing Address:

Pbst Office Box 4545 Atlanta Georgia 30302 h

Georgia Power L T. Gucwa Its southem electrc system -

Manager Nuclear Saferf

_I and Licensing SL-2266 0200m April 1, 1987 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.

20555 1

NRC DOCKET 50-424 OPERATING LICENSE.NPF-68 V0GTLE ELECTRIC GENERATING PLANT UNIT 1 NOTIFICATION REGARDING PLANT COMPLETION Gentlemen.

In a telephone conversation on March 6,1987, W. E. Burns, of Georgia Power Company (GPC), informed M. V. Sinkule, of the Nuclear Regulatory Commission Region II Administrator's staff, of minor exceptions to schedules cited in our January 2,

1987 letter titled " Statement of Completion and Request for Low Power Operating License".

GPC hereby provides documentation of those noted exceptions pursuant to the request of Mr. Sinkule.

Specifically:

The " Watch" program software for the " Proteus" plant computer o

was not, and is not expected to be, tested.

GPC does not. intend to employ this non-safety related computer program.

The program had been intended for use merely as an operator aid for boron and xenon assessment.

Baron and xenon assessment are to be accomplished through other methods, The Fuel Handling ESF filter package testing was not completed o

prior to entry _into Mode 2.

This filter package serves the Fuel Handling Post Accident Ventilation System (see__ Technical Specification

3. 9.12. ).

The specification initially. requires the ventilation system to Le operable for the off-loading any irradiated fuel into the storage pool.

The filter package will be fully tested under surveillance procedures prior to any such of :'-loading of irradiated fuel.

O\\

C r.

87041 h [5 24 g I PDR PDR l

P

~

GeorgiaPower A U. S. Nuclear Regulatory Commission April 1, 1987 Page Two Testing of the following non-safety related filter packages was o

not completed prior to entry into Mode 2:

Technical Support Center HVAC Post-LOCA Purge Steam Packing Exhaust Fuel llandling Building Normal HVAC Auxiliary Building Nonnal Exhaust The testing of' Fuel Handling Building radiation monitor RE-2533A o

was not completed prior to entry into Mode 2 because this monitor was under repair and spare parts were unavailable.

This monitor is only required to be operable when irradiated fuel is in the spent fuel pool.

The above described deferrals have been reviewed under the requirements of 10CFR50.59 and by the Plant Review Board and do not involve an unreviewed safety question.

If you should have questions regarding this information, please contact Mr. Burns.

Sincerely, f4 s=

L. T. Gucwa WEB /lm 0200m 700775

s GeorgiaPower1 U. S. Nuclear Regulatory Commission April 1,1987 Page Two xc: Georgia Power Company Mr. R. E. Conway Mr. J. P. O'Reilly Mr. G. Bockhold, Jr.

Mr. J. F. D' Anico GO-NORMS Southern Company Services Mr. J. A. Bailey -

Shaw, Pittman, Potts & Trowbridge f

Mr. B. W. Churchill, Attorney-at-Law Troutman, Sanders, Lockerman & Ashmore Mr. J. E. Joiner, Attorney-at-Law l

U. S. Iluclear Regulatory Commission Dr. J. N. Grace, Regional Administrator Ms.11. A. Miller, Licensing Project Manager, NRR (2 copies)

Mr. J. F. Rogge, Senior Resident Inspector-0perations, Yogtle Georgians Against Huclear Energy Mr. D. Feig Ms. C. Stangler 1