MONTHYEARL-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-058, Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with ML20203D4811999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Bvps,Units 1 & 2, in Accordance with NRC GL 97-02.With ML20199C9971998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Bvps,Units 1 & 2. with L-98-229, Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with L-98-210, Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with L-98-197, Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With L-98-178, Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with L-98-168, Monthly Operating Repts for July 1998 for Bvps,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Bvps,Units 1 & 2 L-98-139, Monthly Operating Repts for June 1998 for Bvps,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Bvps,Units 1 & 2 L-98-119, Monthly Operating Repts for Bvps,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for Bvps,Units 1 & 2 L-98-096, Monthly Operating Repts for Apr 1998 for Bvps,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Bvps,Units 1 & 2 L-98-068, Monthly Operating Repts for Mar 1998 for Bvps,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Bvps,Units 1 & 2 L-98-036, Monthly Operating Repts for Feb 1998 for Beaver Valley Power Station1998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Beaver Valley Power Station ML20202F8191998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Beaver Valley Power Station,Units 1 & 2 ML20198L3981997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Beaver Valley Power Station,Units 1 & 2 L-97-072, Monthly Operating Repts for Nov 1997 for Bvps,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Bvps,Units 1 & 2 L-97-057, Monthly Operating Repts for Oct 1997 for Beaver Valley Power Station,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Beaver Valley Power Station,Units 1 & 2 L-97-040, Monthly Operating Repts for Sept 1997 for Bvps,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Bvps,Units 1 & 2 ML20216H6031997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Beaver Valley Power Station ML20210K5821997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Bvps,Units 1 & 2 ML20140D7261997-05-31031 May 1997 Monthly Operating Repts for May 1997 for BVPS ML20141B3501997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Beaver Valley Power Station,Units 1 & 2 ML20137T1441997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Beaver Valley Power Station Units 1 & 2 ML20136G4651997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Beaver Valley Power Station,Unit 1 & 2 ML20134K1521997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Beaver Valley Power Station,Units 1 & 2 ML20133F4831996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Beaver Valley Power Station Unit 1 & 2 ML20132B1001996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Beaver Valley Power Station Unit 1 & 2 ML20134H4921996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Beaver Valley Power Station,Units 1 & 2 ML20128N1911996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Beaver Valley Power Station Unit 1 & 2 ML20117M2091996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Beaver Valley Power Station Units 1 & 2 ML20117B2481996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Beaver Valley Power Station ML20115D4061996-06-30030 June 1996 Monthly Operating Repts for June 1996 for BVPS ML20117M1791996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Beaver Valley Power Station,Units 1 & 2 ML20111B2441996-04-30030 April 1996 Monthly Operating Repts for Apr 1995 for Beaver Valley Power Station ML20101R0621996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Beaver Valley Power Station ML20100R2841996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Beaver Valley Power Station ML20097D4541996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Beaver Valley Power Station ML20096B2531995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Beaver Valley Power Station ML20095D8651995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Beaver Valley Power Station ML20094H3631995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Beaver Valley Power Station ML20092F4251995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Beaver Valley Power Station ML20087F1331995-07-31031 July 1995 Monthly Operating Repts for Jul 1995 for Beaver Valley Power Station ML20086G1601995-06-30030 June 1995 Monthly Operating Repts for June 1995 for Beaver Valley Power Station Unit 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARL-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with L-99-139, LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With1999-09-0202 September 1999 LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with ML20209D9531999-06-27027 June 1999 Inservice Insp Ninety-Day Rept Bvps,Unit 2 Outage 7,Year 1999 L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with L-99-078, Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable1999-05-0303 May 1999 Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With ML20205L0401999-04-0909 April 1999 SER Accepting Util Relief Requests for Inservice Insp Second 10-year Interval for Beaver Valley Power Station, Unit 2 L-99-054, Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite1999-04-0505 April 1999 Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite L-99-058, Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with ML20196K7981999-03-25025 March 1999 Rev 4 to COLR, for Cycle 8 L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with ML20203E1181999-02-10010 February 1999 SER Accepting Proposed Revs to Plant,Units 1 & 2 Quality Assurance Program Description L-99-019, Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced1999-02-0505 February 1999 Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced ML20196F7011999-01-31031 January 1999 BVPS Unit 2 Heatup & Cooldown Limit Curves During Normal Operation at 15 EFPY Using Code Case N-626 ML20203D4811999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Bvps,Units 1 & 2, in Accordance with NRC GL 97-02.With ML20207E6631999-01-28028 January 1999 Rev 0 to EMECH-0713-1, Operational Assessment of SG Tubing at Beaver Valley Unit 1,Cycle 13 ML20210G7041999-01-22022 January 1999 BVPS Unit 1 Facility Changes,Tests & Experiments for 980123-990122 ML20207E5861998-12-31031 December 1998 Annual Rept 1998 for Toledo Edison ML20207E5601998-12-31031 December 1998 Annual Rept 1998 for Pennpower ML20198B9021998-12-31031 December 1998 BVPS Unit 1 Simulator Four Yr Certification Rept for 1995-1998 ML20207E5901998-12-31031 December 1998 Dqe 1998 Annual Rept to Shareholders ML20199C9971998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Bvps,Units 1 & 2. with ML20207E5521998-12-31031 December 1998 Annual Rept 1998 for Ohio Edison ML20207E5761998-12-31031 December 1998 Annual Rept 1998 for Illuminating Co ML20204J6751998-12-31031 December 1998 1998 Annual Rept for Dbnps,Unit 1,PNPP,Unit 1 & BVPS Units 1 & 2 ML20199F5341998-12-29029 December 1998 Safety Evaluation Granting Relief Requests 1-TYP-3-B3.140-1, 1-TYP-3-B5.70-1,1-TYP-3-RH-E-1-1,1-TYP-3-B-G-1, 1-TYP-3-APP-I-1,1-TYP-3-UT-1,1-TYP-3-N-509,1-TYP-3-N-521, 1-TYP-3-N-524,1-TYP-3-B3.120-1 & 1-TYP-3-C6.10-1 ML20198K8551998-12-21021 December 1998 SER Granting Relief Request PRR-5 for Third 10-year Inservice Testing for Beaver Valley Power Station,Unit 1 ML20198A1631998-12-0909 December 1998 SER Approving Implementation Program to Resolve USI A-46 at Facility That Has Adequately Addressed Purpose of 10CFR50.54(f) Request L-98-229, Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with ML20195J3131998-11-12012 November 1998 Safety Evaluation Granting First & Second 10-yr Interval Inservice Insp Request for Relief L-98-210, Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with ML20206G0291998-10-31031 October 1998 BVPS Unit 2 Facility Changes,Tests & Experiments for Period 971101-981031 ML20154R9121998-10-20020 October 1998 Safety Evaluation Accepting Proposed Changes to QA Program Description in Chapter 17.2 of BVPS-2 Ufsar.Proposed Changes Would Modify QA Organization to Allow Warehouse QC Inspectors to Report to Manager of Nuclear Procurement Dept ML20154P7491998-10-19019 October 1998 SE Accepting Second ten-year Interval Inservice Insp Request for Relief RR-1-TYP-2-B5.40-1,Rev 0,for Plant, Unit 1 ML20198F7611998-10-0606 October 1998 Duquesne Light Co,Beaver Valley Power Station 1998 Emergency Preparedness Ingestion Zone Exercise, Conducted on 981006 ML20154C6711998-10-0101 October 1998 Safety Evaluation Concluding That Revised Model Identified in Dl Submittal Was Appropriate for Analysis of Installed Conduit Ampacity Limits.Determined That There Are No Outstanding Safety Concerns with Respect to Ampacity ML20154D5001998-09-30030 September 1998 Special Rept on Overview of BVPS-1 & BVPS-2 TS Compliance Issues & Corrective Action Taken L-98-197, Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With ML20154E2171998-09-28028 September 1998 Follow-up Part 21 Rept Re Defect with 1200AC & 1200BC Recorders Built Under Westronics 10CFR50 App B Program. Westronics Has Notified Bvps,Ano & RBS & Is Currently Making Arrangements to Implement Design Mods L-98-188, Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure1998-09-21021 September 1998 Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure L-98-178, Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with ML20155B5871998-08-28028 August 1998 Non-proprietary Rev 1 to 51-5001925-01, Risk Assessment for Installation of Electrosleeves at BVPS & Callaway Plant ML20236X2351998-08-0505 August 1998 Part 21 Rept Re Defect Associated W/Westronics 1200AC & 1200BC Recorders Built Under Westronics 10CFR50,App B Program.Beaver Valley,Arkansas Nuclear One & River Bend Station Notified.Design Mod Is Being Developed L-98-168, Monthly Operating Repts for July 1998 for Bvps,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Bvps,Units 1 & 2 L-98-157, Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product1998-07-29029 July 1998 Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product L-98-139, Monthly Operating Repts for June 1998 for Bvps,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Bvps,Units 1 & 2 L-98-119, Monthly Operating Repts for Bvps,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for Bvps,Units 1 & 2 1999-09-30
[Table view] |
Text
. - _ _ _ _ _ _ _ _ _ _ _ - _ - - - _ _ _ _ _ .
NARRATIVE sui 4%RY OF
. lONIHLY OPEPATING EXPERID43 UNIT I OCIOBER 1988 October 1 At 0001 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, the Unit's output was rwhad frtan 100%
output to 40% output to permit rupairs to a heater drain tank level control valve. At 1540 hours0.0178 days <br />0.428 hours <br />0.00255 weeks <br />5.8597e-4 months <br />, the heater drain tank level control valve was repaired and the Unit's output was increa: sed to 50% output to load follow. l October 2 'Ibe Unit operated in a load following node at 50% output. [
Octehar 3 At 0430 hours0.00498 days <br />0.119 hours <br />7.109788e-4 weeks <br />1.63615e-4 months <br />, the Unit's output was escalated to a ncaninal ,
value of 100% output. [
Octehar 4 'Ihe Unit operated at a ncaninal value of 100% output.
] through r October 7 l t
October 8 At 0430 hours0.00498 days <br />0.119 hours <br />7.109788e-4 weeks <br />1.63615e-4 months <br />, the Unit's output was zwkv=4 to 45% to permit repairs to a heater drain tank level control valve. ;
At 2131 hours0.0247 days <br />0.592 hours <br />0.00352 weeks <br />8.108455e-4 months <br />, repairs to the heater d min tank level control valve were cor@lete and the Unit' output was ,
walated to a ncninal value of 50% output to it.,sa follow.
Octrear 9 At 0820 hours0.00949 days <br />0.228 hours <br />0.00136 weeks <br />3.1201e-4 months <br />, the Unitis output was twhrmi to 45% to permit repairs to a heater drain tank level control valve.
At 0855 hours0.0099 days <br />0.238 hours <br />0.00141 weeks <br />3.253275e-4 months <br />, the repairs to the heater drain tank level control valve was complete and power was escalated to a naninal value of 50% output to load follow. j October 10 At 0430 hours0.00498 days <br />0.119 hours <br />7.109788e-4 weeks <br />1.63615e-4 months <br />, the Unit's output was mealated to a ncninal I j value of 100% output. L
- [
Octehar 11 'Ihe Unit operated at a naminal value of 100% output. [
W Octrher 14 i
, l t
Ocrehar 15 At 0003 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />, the Unit's output was reduced to 50% output l to load follow. [
Octehar 16 'Ihe Unit cperated at 50% output. ,
f October 17 At 0406 hours0.0047 days <br />0.113 hours <br />6.712963e-4 weeks <br />1.54483e-4 months <br />, the Unit's output was escalated to 90% output f to load follow. l 1
Octehar 18 'Ihe Unit operated at 90% output to load follow.
- through ;
October 21 .
t i
j g.11100000 081031 .N.1Y R ADocK 05000334
///
NARRATIVE SLM9Rf OF POfDILY OPERATING EXPERIDICE UNIT I (continued)
OCICBER 1988 October 22 At 0005 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />, the Unit's output was M v=1 to 50% output to load follw. t October 23 'Ihe Unit operatau st 50% output. I October 24 At 0400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br />, the Unit's out{ut was increased to 90% output to load follow. [
October 25 'Ihe Unit operated at 90% output. ;
through ,
October 28 >
Oc+r+*r 29 At 0010 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br />, the Unit's output was reduced to 50% to load '
follow.
Oce r+*r 30 'Ihe Unit operated at 50% output. '
October 31 At 0400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br />, the Unit's output was escalated to 90% output to load follow.
4 1
,)
i u
i I
t f
i l t
? :
{
l 1 !
t l
l l
AVERACE O AILi UNIT POWER LEVEL i DOCK 2T No.30-334 r tfNgt 37? 5 r.* n:.: Q ,
4 DATg 11/10/88 .
COMPT.ETED BY M.A. Winger _
j TELEPHONE (412) 393-7621 l I
i l
yo g OCTOBER 1988 !
DAY. AVERAGE DAILY POWER LIVEL DAY AYIRAGE DAILY POWER LIVEL i t MWe,Neti IMWe NetI g 346 g7 633 l 2
350 gg 733 i 3 692 g, 738 4 813 3 741 l g 804 3g 742 6 813 g 396 ,
7 808 392
- i 3 t
, g 363 ;4 646 ,
j 9 375 gg 750 :
- 7 i le 683 ;g 733 j i -
l g 821 g 754 821 733 12 3 }
13 813 408 ;
3 816 383 14 3g [
t3 40A 3g 654 le 379 ,
t i
-i !
j INSTRUCT 10NS l 1
- Osi this format.hst the ourne dadv unit ;i vce
- 'esci :n uwe Net far each day in the recosting nwath. ikmnute 'o !
) Ih6 ft03 fell efHMS fMg3W48 L.
f ;
4 i
(4t77) i 4
I j I
OPERATING DATA REPORT DOCKET NO.: 50 334 REPORT DATE: 11/09/88 COMPLETED BY: M.A.WINGER TELEPHONE: (412) 393 7621 1 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWEk STATION, UNIT 1 Notes
- 2. REPORTING PERIOD: OCTOBER 1988
- 3. LICENSED THERMAL POWER (MWt): 2660
- 4. NAMEP! ATE RATING (Gross MWe): 923 3
- 5. DESIGN ELECTRICAL RATING (Not MWe): 835
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe): 860
- 7. MAX. DEPENDABLE CAPACITY (Net MWe): 810 ;
- 8. IF CHANCES OCCUR IN CAPACITY RATINGS SINCE IAST REPORT, CIVE REASONS: ;
l
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Not MWe): Nona !
- 10. REASONS FOR RESTRICTIONS, IF ANY: N/A I I
THIS MONTH YEAR TO DATE CUMULATIVE i 11, HOURS IN REPORTING PERIOD: 745.0 7320.0 109608.0 l
- 12. NO. OF HRS. REACTOR WAS CRITICAL: 745.0 5798.1 64982.3 t
- 13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 4482.8 ,
- 14. HOURS GENERATOR WAS ON LINE: 745.0 5727.3 63381.5 L
- 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0 [
- 16. GROSS THERMAL ENERGY GEN. (MWH): 1541992.0 13983736.0 150901055.5 :
- 17. GROSS ELECT. ENERGY GEN. (MWH): 501670,0 4526439.0 48392159.0 j
- 18. NET ELECTRICAL ENERGY GEN. (MWH): 469480.0 4240157.0 45165850.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 78.2 60.1 [
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 78.2 60,1
[
- 21. UNIT CAPACITY FACTOR (MDC): PCT 77.8 71.5 54.1 t
- 22. UNIT CAPACITY FACTOR (DER): PCT 75.5 69.4 52.5 :
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 2.1 18.4
(
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH): l I
I
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
[
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)
- i FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A :
COMMERCIAL OPERATION N/A N/A f
[
l
UNil SHUIDOWNS AND POWER rem I'MKKE T NO . 5W#'
UNIT MAME AVf'S Unit iI BDAIE 11/10/88 REPORT MONIH OCTOBER l#88 c m Eynggy M.A. W er IELE PHONE (412) 393-7621 "a.
ca w me o **
3* "c 05% Licensee ,,
Cause & Corrective No. Date ". %3 3U Event !. S Action to H
R a
$3 $ f$" Report # =E a Prevent Recurrence u
gm9 yU y 8
21 881001 F 0 5 5 N/A VALVEI lill Reduced power to 40% to repair heater drain tank level control valve LCV-SD-106B.
22 881001 S 0 5 N/A ZZ ZZZZZZ 11 Power increased from 40% to 507. to load follow.
23 881008 F 0 B 5 N/A lill VALVEX Reduced power to 457. to repair heater drain tank level control valve LCV-SD-106B.
2to 881008 S 0 5 N/A ZZ 11 ZZZZZZ Power increased to 507. to load follow.
25 881009 F 0 B 5 N/A IIII VALVES Unit's output reduced to 457. to permit
, maintenance on LCV-SD-106B heater drain tank level control valve.
I 2 I I a.eJ 3 4 Reawee se,,si g: I =lissues G. In.sen.sk.ns
% LlieddeJ A f gesigmersee g~,es.ee gI opt,het g _,,,,,, g 3.g recy.m see. sspass 3 Mhnessac eg Tess y_,g ,,.ai seram I seen Sh< css i== l a.cawc 0 RefM 3-Autemette Scram I '<*' R*l' 8 3 3 M 8 I '8' 8 N8 'NI G ll Mrgalasew) Mesesks#'" 4-Caset tamed Free Previe=* peontle (188 89 l 83 teressew Teseneng A 1 ea rnw I sassessackin $_g ,f,,cgg. ,
1 AJeunessesee,c g,y, $ ,
t tagaresensnalI se. ll erlames I slutus I Samm %=e.c t*8/ F FI 11(8elicsiI sgIsai9 e
UNII SHUIDOWNS AP4D POWER REtsgCilONS EMKKET780. 50- 3 M ,
UNIT NAME OVIS Uselt Il DAIE _11/10/88 004rtElfstay Pt. A. winger REFORT MONIH OCTOBER 1988 IER.EfetopeE (412) 393-7b71 s.
cn ene te o .
o, * ** 0 CU Licensee "$*
No. Date c ,, Cause, & Corrective
% "$ . 3 i's e* Event Ie S* Action to R $** 3 $ f$" Report # *E s Prevent Recurrence H m ymg yU 0 2
26 881009 S 0 H 5 N/A ZZ ZZZZZZ Power increased to 50% to load follow.
27 881015 S 0 H 5 N/A ZZ ZZZZZZ IJnit 's output reduced to 501 to load follow.
28 881017 S 0 H 5 N/A ZZ ZZZZZZ IJnit's output increased to 901 to load follow.
29 881C22 S 0 H 5 N/A ZZ ZZZZZZ IJnit's output decreased to 507. to load follow.
30 881024 S 0 H 5 N/A ZZ ZZZZZZ Jnit's output increased to 901 to load tollow.
31 881029 5 0 H 5 N/A ZZ ZZZZZZ fnit's output reduced tr. 50% to load I follow.
32 881031 S 0 H 5 N/A ZZ ZZZZ?.2 rn it's output increased to 90% to load l !ollow.
~
I 2 I I.=.eJ 3 4 Reas..e ,,,, % i glue es G. 8 es. i..ng 5 %licJu'eJ A figuiposerne l'adeself agilawel 3.se ag f e l'ecraesse..se est lissa R Maassacessiae e t Tese 2-es aa krto 8 S 58"d' 8*" I ** '"we f Referleat 3-hos atte Scrto I 's**N* f**8 8 I I N 8 I '8' 8 NI'MI 8 I8 Merealasme) Rcsselise.see 4-Comain e4 Free Fre,to.e teomtIn tile.lI I f 4.rese.w featessag A I oncetr I sassenasiise 5-mes' esc : t em 1 AJanaessesse.c 9.og g,,, 5 ,
t.Ih resensialI ...eiI ag.4 e.e3 I slulwe I L.= %.a .-
1 l'8/ F Ji ilIhiere il igda I f
NARRATIVE SG99JW OF KWDEX OPERATDC EXPERID4CE UNIT II OCIOBER 1988 Octcber 1 'Ihe Unit entered the month at 75% cutput to permit repairs to the tube cleaning systen of the 'B' waterbox of the main
.rdenser.
OctcLar 2 At 1950 hours0.0226 days <br />0.542 hours <br />0.00322 weeks <br />7.41975e-4 months <br />, the Unit's output was escalated to a non.inal value of 100% cutput.
October 3 'Ihe Unit operated at a ncainal value of 100% output.
through Oc+r*wr 6 Octr**r 7 At 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br />, the Unit's cutput was reduced to 75% to pemit tube leak detection and repairs in the 'B' waterbox of the Unit's main condenser.
October 8 'Ihe Unit operated at 75% output.
through October 9 Cctceer 10 At 2350 hours0.0272 days <br />0.653 hours <br />0.00389 weeks <br />8.94175e-4 months <br />, the Unit's output was escalated to a ncninal value of 100% cutput.
Octcber 11 The Unit operated at a ncminal value of 100% output.
through Octe*we 31
AvtRAct 041LY L'Nif.50wgR ggygt 00CK27NO. 50-412 t; nit BVPS Unit 2 DA7g 11/10/88 M.A. Winger COMPWD BY TELEPHONg (412) 393-7621 gg OCTOBER 1988 DAY AVERACE DAILY POWER LIVIL DAY AVIRACI DAILY power LIVEL IMWwNel exw Nm 582 g7 798 g
614 gg 798 802 g, 806 3
4 806 20 798 g 70A gg 793 806 g 802 6
769 y 806 f 7 3 594 4 802 590 3 A06 9
590 806
] 10 3 gg 785 g 802 802 802 gg 3 g3 An6 803 i ;,
l 806 3g 806 14 802 jg 804 -
33 34 798 INSTRL'CT10NS On this format.!sst the ocne d:dv unit ;mer %i:n MWe Net far sua day in the remaeung nsiath.i!..innute eu the nearest envie megawact.
int??)
( , .
OPERATING DATA REPORT J
DOCKET No.: 50 412 REPORT DATE: 11/09/88 COMPLETED AY: M.A.WINGER TELEPHONE: (412) 393 7621 s
OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
- 2. REPORTING PERIOD: OCTOBER 1988
- 3. LICENSED THERMAL POWER (MWe): 2660 4.1 AMEPIATE RATING (Cross MWe): 923
- 5. DESIGN ELECTRICAL RATING (Not MWe): 836
- 6. MAX, DEPENDABLE CAPACITY (Cross MWe): 885
- 7. MAX. DEPENDABLE CAPACITY (Not NWe): 833
- 8. IF CHANCES OCCUR IN CAPACITY RATINGS SINCE !AST REPORT, GIVE REASONS:
i
- 9. POWER LEVEL TO VHICH RESTRICTED, IF ANY (Net MWe): Mona _
1
- 10. REASONS FOR RESTRICTIONS. IF ANY: N/A i
i i THIS MONTH YEAR TO DATE CUMUIATIVE
- 11. HOURS IN REPORTING PERIOD: 745.0 7320.0 8391.0
, 12. NO. OF HRS. REACTOR WAS CRITICAL: 745.0 6819.8 7785.3
- 13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0 l 14. HOURS GENERATOR WAS ON LINE: 745.0 6765,5 7715.3
- 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 16. CROSS THERMAL ENERCY CEN. (GH): 1881405.0 17481165.0 19866802.4 t
- 17. CROSS ELECT. ENERCY CEN. (MWH): 603700.0 5611000.0 6373200.0 4
- 18. NET ELECTRICAL ENERCY CEN. (EH): 571691.0 5304498.0 6042602.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 92.4 91.9
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 92.4 91.9
- 21. UNIT CAPACITY FACTOR (MDC): PCT 92.1 87.0 86.5 1
- 22. UNIT CAPACITY FACTOR (DER): PCT 91.8 86.7 86.1
- 23. UNIT FORCED OUTAGE RATE
- (PERCENT) 0.0 3.0 4.1
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
l UNIT Ifl SCHEDUTrn FOR FIRST REMELING OUTAGE BEGINNING MARCH 17.1989 TO J
MAY 26.1989
- 25. IF SHUT DOWN AT END OF REPORT PER70D, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A
m _ - _
o -
UNii 5NUygsgesN5 AMED FUteER reg 80CT10NS EMKKEI 700.38-417 UNIT M480E hIr 2 IDAIE /88 REPOR T 300NIN OCTOBER 1988 NE1 Ele gy M.A. Winter IEI.If000NE (412) 393-7621 ,
M Se .
c: n = es o o, ; ", O C, O Licensee 4 $** Cause & Corrective No. Date ",, %$ $ lU Event m o Action to R $3 3 f$" Report # 5 eu Frevent Recurrence e a m gw NU y o
21 881001 S 0 8 4 N/A HF liTEXCH Unit's output reduced to 757,to permit repairs to the condenser tube cleaning system for the 'B' waterbox of the Unit's main condenser.
22 881007 5 0 B 5 N/A IIC HTEICII Unit's output reduced to 757. to permit condenser tube leak Jetection and repairs in the 'B' waterbox of the Unit's main condenser.
I 2 3 4 I I a.cJ Rees.a. pe,sised: I. duties G . Ineaeme sienes
% % SwJ*.4 AI9mpememe TseleneiI epEsent g u .g 8.= Peermosom W Issea 3M* e og irse 2 h l Scron i esses Sierces s.= 1 messe<c f Ref% 3 3,,,,,,,se seram 3 *ca' Ral'**' 8I I N 8 8 e8' 8WRI G 18 9tcyedaems Messeks en g_c.,, g ,,4 y, pg., s . pe tte atte.8 8 8 8Irreseas leseneseg A I e cwte I wasemmase.as S- w eece1em 3 Ad==aeedomem 9_ogie,r 5 ,
te tapressa esE I e .e il spisesel I sledies I %ssem bene.c 89/FF3 IlIhiers Il ag4 ment e
$VL
'Af M Te'epo . (4u) m exo N#:tm oroyp P O. Bc 4 r.hiccropon PA 55:ncoe4 llove: tor 10, 1988 Doaver Valley Power Staticn Unit 1 - [bchet llo. 50-334, Licenso 13o. DIR-56 Unit 2 - [bcket llo. 50-412, Licenso lio. IIPF-73 Monthly Oreratirg. Report U. S. IMclear Regulatory Ommission
[bcu:nont Cbntrol Desk b'ashinJton, D.C. 20555 Cention.n:
In acconlarco with Arpenlix A, Technical Specifications, the Monthly Orcratirn Report is sutnitto:1 for Unit 1 ard Unit 2 for the renth of Octrier, 1988.
Verf truly yours,
. D. Sieler
'ico Pnmident IMclear Grotp Ini Ih:1ccures cc: lac Regiomi Office Kiny of rnissia, PA 0 1 1