ML20206E177

From kanterella
Jump to navigation Jump to search
Amends 99 & 73 to Licenses DPR-51 & NPF-6,respectively, Revising Tech Specs to Reflect Reorganization of Nuclear Operations Dept
ML20206E177
Person / Time
Site: Arkansas Nuclear  
Issue date: 06/10/1986
From: Knighton G, Stolz J
Office of Nuclear Reactor Regulation
To:
Arkansas Power & Light Co
Shared Package
ML20206E183 List:
References
DPR-51-A-099, NPF-6-A-073 NUDOCS 8606230191
Download: ML20206E177 (31)


Text

pa a%q f

jo UNITED STATES f

g NUCLEAR REGULATORY COMMISSION 3

o L

j WASHINGTON. D. C. 20555

\\,... *#,a ARKANSAS POWER & LIGHT COMPANY DOCKET NO. 50-313 ARKANSAS NUCLEAR ONE, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 99 License No. DPR-51 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Arkansas Power & Light Company (the licensee) dated December 20, 1985, as supplemented February 7, 1986 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's i

rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

8606230191 860610 PDR ADOCK 05000313 p

PDR

. 2.

Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the attachment to this license amendment, and paragraph 2.c.(2) of Facility Operating License No. DPR-51 is hereby amended to read as follows:

Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 99, are hereby ' incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION O

..f,

/3

\\

/

Il

. Stolz,(Directo P

Project Directorate No. 6 vision of PWR Licensing-B Attachnment:

Changes to the Technical Specifications Date of Issuance: June 10, 1986

~.

June 10,~1986 ATTACHMENT TO LICENSE AMENDMENT NO. 99 FACILITY OPERATING LICENSE NO. OPR-51 DOCKET N0. 50-313 i

Replace the following pages of the Appendix "A" Technical Specifications with the attached pages.

The revised pages are identified by Amendment number and contain vertical lines indicating the area of change.

Remove Insert 117 117 117a 117a 119 119 120 120 121 121 121a 122 122 123 123 124 124 125 125 126 126 127 127 c.

6.0 ADMINISTRATIVE CONTROLS 6.1 RESPONSIBILITY 6.1.1 The Director, Site Nuclear Operations shall be responsible for overall facility operation and shall delegate in writing the succession to this responsibility during his absence.

6.2 ORGANIZATION OFFSITE 6.2.1 The offsite organization for facility management and technical support shall be as shown on Figure 6.2-1.

FACILITY STAFF 6.2.2 The Facility organization shall be as shown on Figure 6.2-2.

Each on duty shift shall be composed of at least the minimum shift crew composition shown in Table 6.2-1.

6.2.2.1 Administrative controls shall be established to limit the amount of overtime worked by plant ttaff performing safety related functions.

These administrative controls shall be in accordance with the guidance provided by the NRC Policy Statement on working hours (Generic Letter No. 82-12).

6.3 FACILITY STAFF QUALIFICATIONS 6.3.1 Each member of the facility staff shall meet or exceed the minimum qualifications of ANSI N18.1-1971 for comparable position, except for (1) the Health Physics Superintendent who shall meet or exceed the qualifications of Regulatory Guide 1.8, September 1975 and (2) the Shift Technical Advisor who shall have a bachelor's degree or equivalent in a scientific or engineering discipline with specific training in plant design, and response and analysis of the plant for transients and accidents.

6.4 TRAINING 6.4.1 A retraining and replacement training program for the unit staff shall be maintained under the direction of the Director, Site Nuclear Operations and shall meet or exceed the requirements and recommendations of Section 5.5 of ANSI N18.1-1971 and Appendix "A" l

of 10 CFR Part 55.

1 6.4.2 A training program for the Fire Brigade shall be maintained under the direction of the Director, Site Nuclear Operations and shall meet or exceed the requirements of Section 27 of the NFPA Code-1975 except for Fire Brigade training sessions which shall be held at least quarterly.

Amendment No. 26, 30, 34, 37, 117 47, 50, 59, 64, 82, 85, 99 l

i 1

6.5 REVIEW AND AUDIT 6.5.1 Plant Safety Committee (PSC) Function 4

6.5.1.1 The Plant Safety Committee shall function to advise the Director, Site Nuclear Operations on all matters related to nuclear safety.

COMPOSTION 6.5.1.2 The Plant Safety Committee shall be composed of the:

(See Page 121) i f

Y I

Amendment No. 85, 99 117a

s.

ARKANSAS POWER & LIGHT COMPANY

o N

==

h (1)

SENIOR g------------

VICE PRESIDENT ENERGY SUPPLY g

H l

l l

I VICE PRESIDEN1 ENERGY SUPPLY g

NUCLEAR SERVICES I

OPER ATIONS DIRECTOR I

l I

I I

I l

ADMINISTR ATIVE ENGlHEERING TECHNICAL SERVICES SERVICES SERVICES g

GENERAL GENERAL GENERAL l

MANAGER MANAGER MANAGER I

C e

~

DIRECTOR SITE (1) THE NUCLEAR QUALITY GENERAL MANAGER NUCLEAR REPORTS TO THE VICE PRESIDENT OF OPERATIONS NUCLEAR OPERATIONS. HE HAS INTERFACE NUCLEAR WITH THE DIRECTOR SITE NUCLEAR SERVICES OPER ATIONS IN D AILY COMMUNICATIONS, NUCLEAR AND HAS DIRECT ACCESS TO THE SENIOR QUALITY (1)

GENERAL GENERAL

- - ~ ~ ~ - -

MANAGER VICE PRESIDENT ENERGY SUPPLY ON ANY

^

MANAGER

s f

PSC SRC g

5 i

i NUCLEAR m

O NUCLEAR PROGRAMS MANAGER HAS NUCLEAR NUCLEAR ENGINEERING

    • ww

,N,ts RESPONSIBILITY FOR THE CORPOR ATE Jil P R OGR A M SERVICES AND HEALTH PHYSICIST FUNCTION (OFF-SITE)

MANAGER MANAGER LICENSING g

AND THE CORPORATE FIRE PROTECTION PROGRAM MANAGER 1

h,N m

l FIGURE G.2-1 MANAGEMENT ORGANIZATION CHART e

ARKANSAS POWER & LIGHT COMPANY ARKANSAS NUCLEAR ONE OeRECTOR SITE seUCLEAR OPERATIOces leUCLEAR QUALf?V OEssERsL MANAGER ""*""""""]

I i

__________________________q l

I tsi l

t I

O.C.

O.A SPECIAL PROJECTS NUCLF.AR I

SUPERfMTENDENT SUPE RINiE40ENT MANAGER P,R00R g(1) l I

I i

I (2)\\

l I

I MOCHF C TIONS OENERAL MANAGER MANAGER PLANT OPERATIONS GENERAL MANAGER

(.. _ _

PLANT SUPPORT g

l l

I i

4 i

OPtetATIONS WORE CONTROL MAINTENANCE ADMINISTR A TIVE ENGINE E RING TR AINING MANAGER S P RT I

MANAGER CENTER MANAGER MANAGER MANAGER MANAGER MANAGER

[

l i

i i

1-1 1

MA EN E

SUPEIMNTENDENT E e EnteeG MEALTH PHYSeCS,,)

EleOE et 110Esef SUPERVISOR SUPEReNTEMOENT I

l CPERATIONS OPERATIONS ELECTRICAL PLANT TECHNsCAL TE CHNIC AL MAINTENANCE ENQlNEERING EMERGENCY PL A NNieeG SUPERV R

SUPERY R

INSTRUMENT

-BMIFT SUPERVISOR BNIFT SUPERVISOR-ggNNOL SfRV CES A

ANALY 13 1

W W

SUPERINTENDENT SUPERVISOR SUPERINTENDENT

)

3MIFT SMlFT AOMINIS TR A TIVE A D MINIS TR A fivt SMIFT OPER A TIONS ASSISTANTS A S SIS T A NT S E X PE RIE NCE MAINTENANCE SUPERINTENOENT ASSESSMENT GR OL'P SUPERiesTENf)ENT PLAlt? OPERATOR PLANT OPERATOR NM NM SENIOR M AINTE NANCE 1

i

=

COOROsN A TOR R SENIOR OPER ATOR LICENSE REOUIRED W lu OPER ATOR LICENSE REOulREO ASSISTANT PLANT ASSIST ANT PL ANT gPERATOR OPERATOR RR WE (t) THE HE ALTH PMYSICS SUPERINTENDENT REPORTS TO THE TECHNeCAL SUPPORT MANAG AseO ROUTINE HEALTH PHYSICS CONCERNS ANO ME REPORTS TO THE DIRECTOR SITE N RAOeOLOGICAL MEALTM SAFETY ANO POLICY.

(3) THE HEALTM PHYSICS SUPERINTENDENT MAS OeRECT INTERFACE WITH THE seUCLEAR PROGRA W A S TE WASTE OP RAOIOLOeeCAL MEALTH Also SAFETY. ees WeLL MELP FOeseeULATE CORPORATE HEALTH PMVS CONTROL COesTROL THAT IT IS PROPERLY eesptsasENTEO.

C4 ER ATOR OPERATOR IseTEstF ACE WITM THE OtRECTOst SITE seUCLEAR OPERATIOoot les OAILY COestsUNeCAftoset, ANO MAS DeRECT ACCESS TO Te SEspeOR VICE PRESeOENT EseERGY SUPPLY Oss ANY MATTERS CONCEReelsee NUCLEAR OUAL87Y.

  1. fMILfARY AUEtLIARY OPERA 70st OPERA TOct FIGURE 6.2-2 FUNCTIONAL ORGANIZATION FOR PLANT OPERATIONS

{

ARKANSAS-UNIT 1 120 Amendment No. 37,47,64,82, 99 l

Chairman: Manager of Special Projects Member:

Operations Manager Member:

Maintenance Manager Member:

Training Manager Member:

Technical Analysis Superintendent Member:

Engineering Manager Member:

Quality Assurance Superintendent Member:

Reactor Engineering Supervisor Member:

Health Physics Superintendent The Director, Site Nuclear Operations should designate in writing the Alternate Chairman in the absence' of the Chairman.

ALTERNATES 6.5.1.3 All alternate members shall be appointed in writing by the PSC Chairman to serve on a temporary basis; however, no more than two alternates shall participate as voting members in PSC activities at any one time.

MEETING FREQUENCY

~

6. 5.1. 4

' The PSC shall meet at least once per calendar month and as convened by the PSC Chairman or his designated alternate.

QUORUM 6.5.1.5 The minimum quorum of the PSC necessary for the performance of the PSC responsibility and authority provisions of these technical specifications shall consist of the Chairman or his designated alternate and four members including alternate.s.

RESPONSIBILITIES 6.5.1.6 The Plant Safety Committee shall be responsible for:

Review of 1) all procedures required by Specification a.

6.8 and revisions thereto, 2) any other proposed procedures or revisions thereto as determined by the Director, Site Nuclear Operations to affect nuclear safety.

b.

Review of all proposed tests and experiments that affect nuclear safety.

c.

Review of all proposed changes to the Appendix "A" Technical Specifications.

d.

Review of all proposed changes or modifications to plant systems or equipment that affect nuclear safety.

Amendment No. 26,34,37,#7,54,82, 121 99

- e.

Investigation of all violations of the Technical Specifications, including the preparation and forwarding of reports covering evaluation and recommendations to prevent recurrence to the Director, Site Nuclear Operations and to the Chairman of the Safety Review Committee.

f.

Review of those Reportable Occurrences requiring 24-hour notification of the Commission.

e i

1 Amendment No. 26,34,37, 121a

  1. 7,64,82, 99 i

g.

Review of facility operations to detect potential nuclear safety hazards.

h.

Performance of special reviews, investigations, or analyses and reports thereon as requested by the Director, Site Nuclear Operations or the Safety Review Committee.

i.

Review of the Plant Security Plan and implementing procedures and submittal of recommended changes to the Director, Site Nuclear Operations and the Safety Review Committee.

j.

Review of the Emergency Plan and implementing procedures and submittal of recommended changes to the Director, Site Nuclear Operations and the Safety Review Committee.

k.

Review of changes to the Offsite Dose Calculation Manual and the Process Control Program.

AUTHORITY 6.5.1.7.1 The Plant Safety Committee shall:

a.

Recommend in writing their approval or disapproval of items considered under 6.5.1.6(a) through (d) above.

b.

Render determinations in writing with regard to whether or not each item considered under 6.5.1.6(a) through (e) above constitutes an unreviewed safety question, c.

Provide written notification within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the the Vice-President, Nuclear Operations and the Safety Review Committee of disagreement between the PSC and the Director, Site Nuclear Operations; however, the Director, Site Nuclear Operations shal.1 have responsibility for resolution of such disagreements pursuant to 6.1.1 above.

RECORDS T

6.5.1.8 The Plant Safety Committee shall maintain written minutes of each PSC meeting that, at a minimum, document the results of all PSC activities performed under the responsibility and authority provisions of these technical specifications.

Copies shall be provided to the Director, Site Nuclear Operations and Chairman of the Safety Review Committee.

6.5.2 Safety Review Committee (SRC)

FUNCTION 6.5.2.1 The Safety Review Committee shall function to provide independent review and audit of designated activities in the areas of:

1 a.

nuclear power plant operations b.

nuclear engineering c.

chemistry and radiochemistry Amendment No. 18, 34, 37, #7, 122 58, 82, 88, 99

d.

metallurgy e.

instrumentation and control f.

radiological safety g.

mechanical and electrical engineering h.

quality assurance practices l

COMPOSITION 6.5.2.2 The Safety Review Committee shall be composed of a Chairman and eight members which collectively have the experience and competence required by ANSI /ANS-3.1-1981 to review. problems in the areas specified in Section 6.5.2.1, a-h.

[

The Vice President of Nuclear Operations shall designate, in j

writing, the Chairman and all SRC members.

1 The Chairman shall designate, in writing, the alternate Chairman j

in the absence of the SRC Chairman.

ALTERNATES 6.5.2.3 All alternate members shall be appointed in writing by the SRC Chairman to serve on a temporary basis; however, no more than two alternates shall participate as voting members in SRC activities i

at any one time.

CONSULTANTS 6.5.2.4 Consultants shall be utilized as determined by the SRC Chairman to provide expert advice to the SRC.

MEETING FREQUENCY 6.5.2.5 The SRC shall meet at least once per calendar quarter during the initial year of facility operation following fuel loading and at least once per six months thereafter.

QUORUM 6.5.2.6 The minimum quorum of the SRC necessary for the performance of the SRC review and audit functions of these technical specifications shall consist of the Chairman or his designated alternate and at least 4 SRC members including alternates.

No more than a minority of the quorum shall have line responsibility for operation of the unit.

Amendment No. 16,3#,37,47,58,82, 99 123

REVIEW 6.5.2.7 Tha SRC shall rsview:

4 a.

.The safety evaluations for 1) changes to procedures, equipment or systems and 2) tests or experiments completed under the provision of Section 50.59, 10 CFR, to verify that 1

such actions did not constitute an unreviewed safety question.

b.

Proposed changes to procedures, equipment or systems which involve an unreviewed safety question as defined in Section 50.59, 10 CFR.

c.

Proposed tests or experiments which involve an unreviewed safety questions as defined in Section 50.59, 10 CFR.

d.

Proposed changes in Technical Specifications or licenses.

Violations of applicable, statutes, codes, regulations, e.

orders, Technical Specifications, license requirements, or of f

internal procedures or instructions having nuclear safety l

significance.

1 i

f.

Significant operating abnormalities or deviation from normal j

and expected performance of unit equipment that affect nuclear safety.

[

i g.

Events requiring 24-hour notification to the Commission.

i h.

All recognized indications of an unanticipated deficiency in

~some aspects of design or operation of structures, systems, or components that could affect nuclear safety.

i.

Reports and meeting minutes of the Plant Safety Committee.

4 j.

Changes to Offsite Dose Calculation Manual and Process Control Program.

AUDITS 6.5.2.8 Audits of facility activities shall be performed under the cognizance of the SRC.

These audits shall encompass:

a.

The conformance of unit operation to provisions contained within the Technical Specifications and applicable license 4

conditions at least once per 12 months.

b.

The performance, training, and qualifications of the entire unit staff at least once per 12 months.

r c.

The results of actions taken to correct deficiencies occurring in unit equipment, structures, systems or methods of operation that affect nuclear safety at least once per G months.

Amendment No. 26, 30, 3#, #7,88, 99 124 J

____.,m,.__,_,

, _. _. ~

_.___,_~r

.rm m.,

~

d.

Th2 p2rfcrmance of tctivities r;quir;d by th] Op2 rational Quality Assuranca Program to meet tha critsria of 10 CFR 50 Appendix "B", at least once per 24 months.

The Facility Emergency Plan and implementing procedures at e.

least once per 12 months.

f.

The Facility Security Plan and implementing procedures at least once per 12 months.

g.

Any other area of unit operation considered appropriate by the SRC or the Vice President, Nuclear Operations.

h.

The Facility Fire Protection Program and implementing procedures at least once per 24 months.

i.

An independent fire protection and loss prevention program inspection and audit shall be performed at least once per 12 months utilizing either qualified off-site licensee personnel or an outside fire protection firm.

j.

The Offsite Dose Calculation Manual and Process Control Program and implementing procedures at least once per 24 months.

k.

The radiological environmental monitoring program and the results thereof at least once per 12 months.

AUTHORITY 6.5.2.9 The SRC shall report to and advise the Vice President, Nuclear Operations on those areas of responsibility specified in Sections 6.5.2.7 and 6.5.2.8.

RECORDS 6.5.2.10 Records of SRC activities shall be prepared, approved and distributed as indicated below:

Minutes of each SRC meeting shall be prepared, approved and a.

forwarded to the Vice President, Nuclear Operations, within 14 days following each meeting, b.

Reports of reviews encompassed by Section 6.5.2.7 above, shall be prepared, approved and forwarded to the Vice President, Nuclear Operations, within 14 days following completion.of the review.

~

c.

Audit reports encompassed by Section 6.5.2.8 above shall be forwarded to the Vice President, Nuclear Operations, and to the management positions responsible for the areas audited within 30 days after completion of the audit.

Amendment No. 18,38,34,37,42,

  1. 7, 58, 78, 82, 88, 99 125

)

6.6 REPORTABLE OCCURRENCE ACTION 6.6.1 The following actions shall be taken for Reportable Occurrences:

a.

The Commission shall be notified and/or a report submitted pursuant to the requirements of Specification 6.12.

b.

Each Reportable Occurrence requiring 24-hour notification to the Commission shall be reviewed by the PSC and submitted to the SRC and the Vice President, Nuclear Operations by the Director, Site Nuclear Operations.

6.7 SAFETY LIMIT VIOLATION 6.7.1 The following actions shall be taken in the event a Safety Limit is violated:

a.

The facility shall be placed in at least hot shutdown within one hour, b.

The Nuclear Regulatory Commission shall be notified and a report submitted pursuant to the requirements of 10 CFR 50.36 and Specification 6.12.3.1.

6.8 PROCEDURES 6.8.1 Written procedures shall be established, implemented, and maintained covering the activities referenced below:

a.

The applicable procedures recommended in Appendix "A" of Regulatory Guide 1.33, November,1972.

b.

Refueling operations.

c.

Surveillance and test activities of safety related equipment.

d.

Security Plan implementation.

e.

Emergency Plan implementation.

f.

Fire Protection Program implementction.

g.

New and snant fuel storage.

h.

Offsite Dose Calculation Manual and Process Control Program implementation at the site.

i.

Post accident sampling (includes sampling of reactor coolant, radioactive iodines and particulates in plant gaseous effluents, and the containment atmosphere).

Amendment No. 16,30,34,37,42, 126

  1. 7,58,82, 99

_ ~ -. _

t 6.8.2 Each procedure of 6.8.1 above, and changes thereto, shall be reviewed by the PSC and approved by the Director, Site Nuclear Operations or the responsible General Manager prior to implementation and reviewed periodically as set forth in administrative procedures.

6.8.3 Temporary ' changes to procedures of 6.8.1 above may be made provided:

a.

The intent of the original procedure is not altered.

b.

The change is approved by two members of the plant staff, at least one of whom holds a Senior Reactor Operator's License on the unit affected.

The change is documented, reviewed by the PSC and approved by c.

the Director, Site Nuclear Operations or the responsible General Manager within 14 days of implementation.

4 t

Amendment No. 16, 30, 34, 37, 127 76, 82, 88,94, 99 l

9

3[. -pa "Pg,jo, UNITED STATES o

NUCLEAR REGULATORY COMMISSION O

E WASHINGTON. D. C. 20555

/

ARKANSAS POWER & LIGHT COMPANY DOCKET NO. 50-368 ARKANSAS NUCLEAR ONE, UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 73 License No. NPF-6 1.

The Nuclear Regulatory Commission (the Commission) has found that:

1 A.

The application for amendment by Arkansas Power & Light Company (the licensee) dated December 20, 1985 as supplemented February 7, 1986 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's 1

rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized l

by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the' common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

I 4

,m.

. 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of the Facility Operating License No. NPF-6 is hereby amended to read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 73, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifica-tions, except where otherwise stated in specific license conditions.

3.

This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

~llQ "Gebrge (W.'jg&'on, kWf !vDS.

' g gg b

Knight Oirdctor PWR Project Directorate No. 7 Division of PWR Licensing-B

Attachment:

Changes to the Technical Specifications Date of Issuance: June 10, 1986

.~

Juno 10, 1986 4

) :

ATTACHMENT TO LICENSE AMEN 0 MENT NO. 73 FACILITY OPERATING LICENSE NO. NPF-6 1

DOCKET NO. 50-368 i

i Replace the following pages of the Appendix "A" Technical Specifications with j

the enclosed pages.

The revised pages are identified by amendment number ar.d contain vertical lines indicating the areas of change.

The corresponding j

overleaf pages are also provided to maintain document completeness.

Remove Pages Insert Pages 6-1 6-1 6-2 6-2 6-3 6-3 l

6-5 6-5 i

6-6 6-6 4

6-7 6-7 6-8 6-8 6-11 6-11 6-12 6-12 1

6-13 6-13 1

6-14 6-14 i

I e

1 I

i i

1 I

l 6.0 ADMINISTRATIVE CONTROLS 6.1 RESPONSIBILITY 6.1.1 The Director, Site Nuclear Operations shall be responsible for overall facility operation and shall delegate in writing the succession to this responsibility during his absence.

6.2 ORGANIZATION i

0FFSITE 6.2.1 The offsite organization for facility management and technical support shall be as shown on Figure 6.2-1.

i FACILITY STAFF 6.2.2 The Facility organization shall be as shown on Figure 6.2-2 and:

)

a.

Each on duty shift shall be composed of at least the minimum i

shift crew composition shown in Table 6.2-1.

4 b.

At least one licensed Operator shall be in the control room j

when fuel is in the reactor.

c.

At least two licensed Operators shall be present in the control room during reactor start-up, scheduled reactor shutdown and during recovery from reactor trips.

d.

An individual qualified in radiation protection procedures shall be on site when fuel is in the reactor.

t i

e.

All CORE ALTERATIONS shall be directly supervised by either a

]

licensed Senior Reactor Operator or Senior Reactor Operator Limited to Fuel Handling who has no other concurrent responsibilities during this operation.

f.

A site Fire Brigade of at least 5 members shall be maintained onsite at all times. The Fire Brigade shall not include 3 i

members of the minimum shift crew necessary for safe shutdown of the unit and any personnel required for other essential

]

functions during a fire emergency, g.

Administrative controls shall be established to limit the l

amount of overtime worked by plant staff performing safety i

related functions.

These administrative controls shall be in accordance with the guidance provided by the NRC Policy i

Statement on working hours (Generic Letter No. 82-12).

ARKANSAS-UNIT 2 6-1 Amendment No. 5,52,5/,73 i

i

4

~

! R ARKANSAS POWER & LIGHT COMPANY z

umN (1)

SENIOR c-g------------

VICE PRESIDENT g

ENERGY SUPPLY

[

-t i

m I

1 I

I VICE PRESIDENT ENERGY SUPPLY NUCLEAR l

SERVICES i

OPERATIONS DIRECTOR I

g i

I I

l ADMINISTRATIVE ENGINEERING TECHNICAL

[

g SERVICES SERVICES SERVICES i

I GENERAL GENERAL GENERAL i

MANAGER MANAGER MANAGER I

T N

DIRECTOR SITE (1) THE NUCLEAR QUALITY GENERAL MANAG NUCLEAR REPORTS TO THE VICE PRESIDENT OF OPERATIONS NUCLEAR OPERATIONS. HE HAS INTERFAC.

NUCLEAR WITH THE DIRECTOR SITE NUCLEAR NUCLEAR SERVICEg OPERATIONS IN DAILY COMMUNICATIONS,l QUALITY (1)

GENERAL AND HAS DIRECT ACCESS TO THE SENIOR.

- - - - - - - - - - - ~

3 GENERAL MANAGER VICE PRESIDENT ENERGY SUPPLY ON ANY.

MANAGER MATTERS CONCERNING NUCLEAR QUALITY s

PSC SRC N

{

D i

M we NUCLEAR

,M G NUCLEAR PROGRAMS MANAGER HAS NUCLEAR NUCLEAR ENGINEERING L

RESPONSIBILITY FOR THE CORPORATE SPROGRAM SERVICES AND l

,E HEALTH PHYSICIST FUNCTION (OFF-SITE)

~

MANAGER MANAGER LICENSING g

ANO THE CORPORATE FIRE PROTECTION PROGRAM MANAGER i

FIGURE 6.2-1 MANAGEMENT ORGANIZATION CHART i

l

ARKANSAS POWER & LIGHT COMPANY ARKANSAS NUCLEAR ONE J

(HRECTOR 44T8 seuCLsAR f

OPeRAT#0000

.seUC.LS AR.OUA.L.ITY N RAL Ass R - - - - - -,

i i

__________________________q i

I L____e_____

ll 0 C.

O A.

SPECIAL PROJECTS NUCLEAR I

SUPensesTEssessef SUPERNeTEse0ENT esAseAGER D

gI I

I I

I l

It)I I

i 1

5 Cafe 004 ottetRAL MAseAotn Of tetRAL WaseAGER i

esANAGER PLAsef OPERATE 0eet PLANT SUPPORT g

l 1

1 1

I I

I OPE R A ff 0NS wCRa CONTROL WAiseTE N AseCf AQWIN4S TR Af tVE ENotNitRING TR AININO WANAGER UPPORT I

WANAQtR CENTER WANAQtR MAseAGER MANAGER MANA(eta ggggggg I

i I

6 l

l I

1 i

l q

Usel? 9 OPERAtloseS uselt 3 OptRAficest

,",I g',NoC, AL g

g A

R,,g MGALTM PeeYSeCS..)

, g SUPEReNTimotNT SUPEReNTtfootN T R

R SUPERylSOR SUPtmMTEMAGNT GUPERINTINotNT t

I i

C PE R a tt0NS Opt R A f f08e8 ftCM%tCAL TECHNICAL ELt CTRICAL PLANT tutRGENCY SU,UPPO,RT SUPER.OR T uAssettNANc3 i

S SUPP ENosNetRtNO

=

PL A NNINO SUPimise t E Not NT SUPERINTENDENT COORDIN A TORS tm. 80R SOR INSTRuWENT

'"a',",;,g'S tl,,A=A'

...,T.UP E R. 8 0 R IM,,7 SUPER,,00R_

gNo,

'a e~

o S

W W

SUPERINTENotNT SUPERvlSOR SUptRiNTEte0ENT SMIPT OM#i 4

ADWsNIS TR A flWg ACM NIS TR A tlV 8

=

gNePT optRAff0NS A S SIS T A NT S A S $1ST ANT S EIPERit NCE WAese ttN AseCE AS$tStutNT SUPtmosof tNCENT OROUP SUPE RINTE NCE NT TLA0T OPSRATOR PLANT OPSRATOR NM NM Stoelom 4

M Asse TE N A NCE 1

1 COORo#NATOR R SENeon OPER ATOR LICENSE REQU4Rt0 W W OPGRATOR LICENSt R80Ulmt0 TBS STAsef PLANT ASSIS TANT PLANT (FERATOR OPERATOR ER NN (t) TME petAList PMTSICS SUPennettasotas? REPORTS TO Test TECHNICAL SUPPORT seAceAGER ese A0esseseSTRAfsvg WATTSR Ase0 ROUTiset HEALTH PMT$eCS COseCEnsee A8ec HE REPORTS TO TMS DesetCTOR SITE NUCLE RA010 LOGICAL MEALTH SAFETT A8ec POLeCT, (t) fees MGALTM PMTS8CS SUPemesefteeSGNT seas SeRSCT INTSeeP ACE WeTM Thf seUCLEAR PesceRAest WASig W A Sit OF Race 0LOeeC AL seE ALTH Asso SAPGTT. MS WeLL M8LP P0neeULAft CCAPORATE HEALTH PMTSeC4 InesTROL CoeITROL THAT sf 68 PesOPGALT seePLEteENTES.

OPGRAT0el OPERATOR sesTERFACE WITM THE OeRECTOR SITE seUCLEAR OPERAfeOset ese OAsLV COesteUIRCAfe0see. Ace 0 MAS SteseOR VtCE PeeGSe0gNT tesame? SWPPLY Os0 AseT e84TTERS 00escameHese seUCLEAR OUAuTT.

FOP.E6LIARY AU.tste&RT RATOR OP AATOR I

I l

l FIGURE 6.2-2 FUNCTIONAL ORGANIZATION FOR PLANT OPERATIONS ARKANSAS - UNIT 2 6-3 Amendment No. U,29,52,73

TABLE 6.2-1 MINIMUM SHIFT CREW COMPOSITION #

l APPLICABLE MODES LICEN5E CATEGORY 1, 2, 3 & 4 5&6 I

l*

SOL OL 2

1 Non-Licensed 2

1 i

Shift Technical Advisor 1

None Required

  • Does not include the licensed Senior Reactor Operator or Senior Reactor Operator Limited to Fuel Handling, supervising CORE ALTERATIONS.
  1. Shift crew composition may be less than the minimum requirements for a period of time not to exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> in order to accommodate i

unexpected absence of on duty shift crew members provided immediate action is taken to restore the shift crew composition to within the j

i minimum requirements of Table 6.2-1.

L ARKANSAS - UNIT 2 6-4 Amendment No. 20 a

e' s

_,,. j t,

-,e.,,

.... m.

~

..,.s..

,. n -s

.m

ADMINISTRATIVE CONTROLS 6.3 UNIT 5IAFF QUALIFICATION 5 6.3.1 Each member of the unit staff shall meet or exceed the minimum qualifications of ANSI N18.1-1971 for comparable positions, except for (1) the Health Physics Superintendent who shall meet or exceed the qualifications of Regulatory Guide 1.8, September 1975, and (2) the Shift Technical Advisor who shall have a bachelors degree or equivalent in a scientific or engineering discipline with specific training in plant design and response and analysis of the plant for transients and accidents.

6.4 TRAINING 6.4.1 A retraining and replacement training program for the unit staff shall be maintained under the direction of the Director, Site Nuclear Operations and shall meet or exceed the requirements and recommendations of Section 5.5 of ANSI N18.1-1971 and Appendix "A" of 10 CFR Part 55, 6.4.2 A training program for the Fire Brigade shall be maintained under the direction of the Director, Site Nuclear Operations and shall meet or exceed the requirements of Section 27 of the NFPA Code - 1975, except for Fire Brigade training sessions which shall be held at least quarterly.

6.5 REVIEW AND AUDIT 6.5.1 PLANT SAFETY COMMITTEE (PSC)

FUNCTION 6.5.1.1 The Plant Safety Committee shall function to advise the Director, Site Nuclear Operations on all matters related to nuclear safety.

COMPOSITION 6.5.1.2 The Plant Safety Committee shall be composed of the:

Chairman: Manager of Special Projects Member:

Operations Manager Member:

Maintenance Manager Member:

Training Manager i

Member:

Technical Analysis Superintendent Member:

Engineering Manager Member:

Quality Assurance Superintendent Member:

Reactor Engineering Supervisor Member:

Health Physics Superintendent Member:

Nuclear Software Expert

  • The Director, Site Nuclear Operations shall designate in writing the Alternate Chairman in the absence of the PSC Chairman.
  • 5ee Page 6-5a ARKANSAS - UNIT 2 6-5 Amendment No. 5,12,I7, 29,29,52,73

ADMINISTRATIVE CONTROLS

  • If one of the above members of the Plant Safety Coninittee meets the qualification requirements for this position, the requirement to have this member is satisfied.

This membership may be filled by two appro-priately qualified individuals who shall ballot with a single combined vote.

Generic qualifications for this membership shall be as follows:

One Individual The Nuclear Software Expert shall have as a minimum a Bachelor's degree in Science or Engineering, Nuclear preferred (in accordance with ANSI N18.1).

In addition, he shall have a minimum of four years of technical experience, of which a minimum of two years shall be in Nuclear Engineer-ing and a minimum of two years shall be in Software Engineering. (Soft-ware Engineering is that branch of science and technology which deals with the design and use of software.

Software Engineering is a discipline directed to the production and modification of computer programs that are correct, efficient, flexible, maintainable, and understandable, in reasonable time spans, and at reasonable costs). The two years of technical experience in Software Engineering may be general software experience not necessarily related to the software of the Core Protection Calculator System. One of these two years of experience shall be with certified computer programs.

Two Individuals One of the individuals shall meet the requirements of the Nuclear l

Engineering portion of the above.

The second individual shall have a

(

Bachelor of Science degree (digital computer speciality) and meet the l

Software Engineering requirements of the above.

The membership (the Nuclear Software Expert or the Digital Computer Specialist) shall be knowledgeable of the Core Protection Calculator System with regard to:

a.

The software modules, their interactions with each other and with the data base.

b.

The relationship between operator's module inputs and the trip variables.

c.

The relationship between sensor input signals and the trip

variable, d.

The design basis of the Core Protection Calculator System.

e.

The approved software change procedure and documentation require-ments of a software change.

f.

The security of the computer memory and access procedures to the memory.

^

ARKANSAS - UNIT 1 6-Sa Amendment No.12 m.

o

ADMINISTRATIVE CONTROLS ALTERNATES 6.5.1.3 All alternate members shall be appointed in writing by the PSC Chairman to serve on a temporary basis; however, no more than two alternates shall part1hipate as voting members in PSC activities at any one time.

MEETING FREQUENCY 6.5.1.4 The PSC shall meet at least once per calendar month and as convened by the PSC Chairman or his designated alternate.

QUORUM 6.5.1.5 The minimum quorum of the PSC necessary for the performance of the PSC responsibility and authority provisions of these technical specifications shall consist of the Chairman or his designated alternate and four members including alternates.

RESPONSIBILITIES 6.5.1.6 The Plant Safety Committee shall be responsible for:

a.

Review of 1) all procedures required by Specification 6.8 and changes thereto, 2) any other proposed procedures or changes thereto as determined by the Directar, Site Nuclear Operations to affect nuclear safety, b.

Review of all proposed tests and experiments that affect nuclear safety.

c.

Review of all proposed changes to Appendix "A" Technical Specifications.

d.

Review of all proposed changes or modifications to unit systems or equipment that affect nuclear safety, e.

Investigation of all violations of the Technical Specifications, including the preparation and forwarding of reports covering evaluation and recommendations to prevent recurrence to the Director, Site Nuclear Operations and to the Chairman of the Safety Review Committee.

s ARKANSAS-UNIT 2 6-6 Amendment No. 6, //, 52,73 f

ADMINISTRATIVE CONTROLS f.

Review of events requiring 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> written notification to the Comission, g.

Review of facility operations to detect potential nuclear safety hazards, h.

Perfomance of special reviews, investigations or analyses, and reports thereon as requested by the Director, Site Nuclear Operations or the Safety Review Committee, i.

Review of the Plant Security Plan and implementing procedures and submittal of recomended changes to the Director, Site Nuclear Operations and the Safety Review Comittee.

J.

Review of the Emergency Plan and implementing procedures and submittal of recommended changes to the Director, Site Nuclear Operations and the Safety Review Committee.

k.

Review of changes to the Offsite Dose Calculation Manual and Process Control Program.

AUTHORITY 6.5.1.7 The Plant Safety Comittee shall:

Recomend in writing their a considered under 6.5.1.6(a) pproval or disapproval of items a.

through (d) above, b.

Render determinations in writing with regard to whether or-not each item considered under 6.5.1.6(a) through (e) above constitutes an unreviewed safety question.

c.

Provide " written notification within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the Vice President, Nuclear Operations and the Safety Review Committee of disagreement between the PSC and the Director, Site Nuclear Operations; however, the Director, Site Nuclear Operations shall have responsibility for resolution of such disagreements pursuant to.6.1.1 above.

RECORDS 6.5.1.8 The rlant Safety Comittee shall maintain written minutes of each PSC meeting that, at a minimum, document the results of all PSC activities performed under the responsibility and authority provisions of these technical specifications.

Copies shall be provided to the Director, Site Nuclear Operations and Chaiman of the Safety Review

. Comi ttee.

ARKANSAS-UNIT 2 6-7 Amendment No. 5, $f, 25, 52, 69, 73 4

[

ADMINISTRATIVE CONTROLS 6.5.2 SAFETY REVIEW COMMITTEE (SRC)

FUNCTION 6.5.2.1 The Safety Review Committee shall function to provide independent review and audit of designated activities in the areas of:

a.

nuclear power plant operations b.

nuclear engineering c.

chemistry and radiochemistry d.

metallurgy e.

instrumentation and control f.

radiological safety g.

mechanical and electrical engineering h.

quality assurance practices COMPOSITION 6.5.2.2 The Safety Review Committee shall be cerrposed of a Chairman and eight members which collectively have the experience and competence required by ANSI /ANS-3.1-1981 to review problems in the areas specified in Section 6.5.2.1, a-h.

The Vice President, Nuclear Operations shall designate, in writing, the Chairman and all SRC members.

The Chairman shall designate, in writing, the alternate Chairman in the absence of the SRC Chairman.

ARKANSAS - UNIT 2 6-8 Amendment No. 5, J7, 25, 52, 73 j

l f

ADMINISTRATIVE CONTROLS l

AUDITS 6.5.2.8 Audits of unit activities shall be performed under the cognizance of the SRC. These audits shall encompass:

a.

The conformance of unit operation to provisions contained within the Technical Specifications and applicable license conditions at least once per 12 months.

b.

The performance, training, and qualifications of the entire unit staff at least once per 12 months.

c.

The results of actions taken to correct deficiencies occurring in unit equipment, structures, systems, or methods of operation that affect nuclear safety at least once per 6 months.

d.

The performance of activities required by the Operational Quality Assurance Program to meet the criteria of 10 CFR 50, Appendix "B",

at least once per 24 months, e.

The Facility Emergency Plan and implementing procedures at least once per 12 months.

f.

The Facility Security Plan and implementing procedures at least once per 12 months.

g.

Any other area of unit operation considered appropriate by the SRC or the Vice President, Nuclear Operations, h.

The Facility Fire Protection Program and implementing procedures at least once per 24 months.

i.

An independent fire protection and' loss prevention program inspection and audit shall be performed at least once per 12 months utilizing either qualified off-site licensee personnel or an outside fire protection firm.

j.

The Offsite Dose Calculation' Manual and Process Control Program and implementing procedures at least once per 24 months.

k.

An inspection and audit of the fire protection and loss prevention program shall be performed by a qualified outside fire consultant at least once per 36 months.

AUTHORITY 6.5.2.9 The SRC shall report to and advise the Vice President, Nuclear Operations on those areas of responsibility specified in Sections 6.5.2.7 and 6.5.2.8.

ARKANSAS - UNIT 2 6-11 Amendment No. II,25, (I,52,69,73

ADMINISTRATIVE CONTROLS RECORDS 6.5.2.10 Records of SRC activities shall be prepared, approved and distributed as indicated below:

a.

Minutes of each SRC meeting shall be prepared, approved and forwarded to the Vice President, Nuclear Operations within 14 days following each meeting.

b.

Reports of reviews encompassed by Section 6.5.2.7 above, shall be prepared, approved and forwarded to the Vice President, Nuclear Operations within 14 days following completion of the review, c.

Audit reports encompassed by Section 6.5.2.8 above, shall be forwarded to the Vice President, Nuclear Operations and to the management positions responsible for the areas audited within 30 days after completion of the audit.

6.6 REPORTABLE OCCURRENCE ACTION 6.6.1 The following actions shall be taken for REPORTABLE OCCURRENCES:

a.

The Commission shall be notified and/or a report submitted pursuant to the requirements of Specification 6.9.

b.

Each REPORTABLE OCCURRENCE requiring 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> notification to the Commission shall be reviewed by the PSC and submitted to the SRC and the Vice President, Nuclear Operations by the Director, Site Nuclear Operations.

ARKANSAS - UNIT 2 6-12 Amendment No. JJ,I7,25,52,73

l ADMINISTRATIVE CONTROLS 6.7 5AttIY LIMIT VIOLATION 6.7.1 The following actions shall b2 taken in tha event a Safety Limit is violated:

a.

The unit shall be placed in at least HOT STANDBY within one hour.

b.

The Safety Limit violation shall be reported to the Commission, the Vice President, Nuclear Operations and to the SRC within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

c.

A Safety Limit Violation Report shall be prepared. The report shall be reviewed by the PSC.

This report shall describe (1) applicable circumstances preceding the violation, (2) effects of the violation upon facility components, systems or structures, and (3) corrective action taken to prevent recurrence, d.

The Safety Limit Violation Report shall be submitted to the Comission, the SRC and the Vice-President, Nuclear Operations within 14 days of the violation.

6.8 PROCEDURES 6.8.1 Written procedures shall be established, implemented and maintained covering the activities referenced below:

a.

The applicable procedures reconmended in Appendix "A" of Regulatory Guide 1.33, Revision 2, February 1978.

b.

Refueling operations.

c.

Surveillance and test activities of safety related equipment.

d.

Security Plan implementation.

e.

Emergency Plan implementation.

f.

Fire Protection Program implementation.

~

g.

Modification of Core Protection Calculator (CPC) Addressable Constants NOTE:

Modification to the CPC addressable constants based on informa. tion obtained through the Plant Computer

- CPC data link shall not be made without prior approval of the Plant Safety Committee.

h.

New and spent fuel storage.

i.

Offsite Dose Calculation Manual and Process Control Program implementation.

J.

Post-accident sampling (includes sampling of reactor coolant, radioactive iodines and particulates in plant gaseous effluent, and the containment atmosphere).

6.8.2 Each procedure of 6.8.1 above, the changes thereto, shall be reviewed by the PSC and approved by the Director, Site Nuclear Operations or the responsible General Manager prior to implementation and reviewed periodically as set forth in administrative procedures.

ARKANSAS - UNIT 2 6-13 Amendment No. 24, 28, (3, 52, 59, 53, 73

ADMINISTRATIVE CONTROLS 6.8.3 Temporary changes to procedures of 6.8.1 above may be made provided:

a.

The intent of the original procedure is not altered.

b.

The change is approved by two members of the plant management staff, at least one of whom holds a Senior Reactor Operator's License on the unit affected.

The change is documented, reviewed by the PSC and approved by the c.

Director, Site Nuclear Operations or the responsible General Manager within 14 days of implementation.

6.9 REPORTING REQUIREMENTS ROUTINE REPORTS AND REPORTABLE OCCURRENCES 6.9.1 In addition to the applicable reporting requirements of Title 10, Code of Federal Regulations, the following reports shall be submitted to the Administrator of the Regional Office unless otherwise noted.

STARTUP REPORT 6.9.1.1 A summary report of plant startup and power escalation testing shall be submitted following (1) receipt of an operating license, (2) amendment to the license involving a planned increase in power level, manufactured by a different fuel supplier, and (4)gn or has been (3) installation of fuel that has a different desi modifications that may have significantly altered the nuclear, thermal, or hydraulic performance of the plant.

6.9.1.2 The startup report shall address each of the tests identified in the FSAR and shall include a description of the measured values of the operating conditions or characteristics obtained during the test program and a comparison of these values with design predictions and specifications.

Any corrective actions that were required to obtain satisfactory operation y shall also be described. Any additional specific details required in license conditions based on other commitments shall be included in this report.

6.9.1.3 Startup reports shall be submitted within (1) 90 days following completion of the startup test program, (2) 90 days following resumption or commencement of commercial power operation, or (3) 9 months following initial criticality, whichever is earliest.

If the Startup Report does not cover all three events (i.e., initial criticality, completion of startup test program, and resumption or commencement of commercial power operation),

supplementary reports shall be submitted at least every three months until all three events have been completed.

ARKANSAS - UNIT 2 6-14 Amendment No. 5, 52, 73 9