Public Version of Revised Emergency Plan Implementing Procedures,Including Index,Rev 5 to EP-210, Dose Assessment Team & Rev 9 to EP-277, Personnel Safety Team Phone List
ML20206E133
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 05/12/1986
From:
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20206E131 List:
References
PROC-860512-01, NUDOCS 8606230127
Download: ML20206E133 (40)


Text

.

i..

i Paga 1 of 5 s

I,'

55 l7 3865047560

"*"s")if

(-

LIMERICK GENERATING STATION EMERGENCY PLAN PROCEDURE INDEX PROCEDURE REV.

DATE SIGNED DATE OF LAST NUMBER NO.

TITLE BY SUPER.

PERIODIC REVIEW EP-101 4

Classification of,

03/25/85 10/26/84 s Emergencies I

j EP-102 10 Unusual Event Response 03/31/86 10/26/84 EP-103 13 Alert Response 03/31/86 10/26/84 EP-104 12 Site Emergency Response 03/31/86 10/26/84 EP-105 12 General Emergency Response 03/31/86 10/26/84 EP-106 4

Written Summary 04/01/85 10/26/84 Notification EP-110 6

Personnel Assembly and 03/14/85 10/26/84 Accountability EP-120 3

Site Emergency Coordinator 04/01/85 10/26/84 EP-201 5

Technical Support Center 02/10/86 03/29/85 (TSC) Activation s EP-202 5

Operations Support Center 04/01/86 04/01/86 (OSC) Activation EP-203 5

Emergency Operations 04/01/85 04/01/85 Facility (EOF) Activation EP-208 4

Security Team 12/12/84 10/26/84 l EP-210 5

Dose Assessment Team 05/12/86 10/26/84 EP-211 2

Field Survey Group 03/25/85 10/26/84 EP-220 CANCELLED EP-221 CANCELLED EP-222 CANCELLED EP-230 5

em y

mpling and 16 8 EP-231 11 Operation of Post-Accident I

86; gh 30(g) y Sampling Systems (PASS) p..~:, c ;.s y y; EP-232 CANCELLED L! di

'l Cf EP-233 7

Retrieving and Changing 04/01g'g.}0/g6/84 Sample Filters and Cartridges from the grl n qg ; y4{M K Containment Leak Detector (j,y g hgMj dj During Emergencies

,s 8606230127 860605 PDR ADOCK 05000352 F

PDR_,

'n s

Page 2 of 5

,l Revi'sion 55 05/12/86 LIMERICK GENERATING STATION EMERGENCY PLAN PROCEDURE INDEX PROCEDURE REV.

DATE SIGNED DATE OF LAST NUMBER NO.

TITLE BY SUPER.

PERIODIC REVIEW EP-234 7

Obtaining Containment 04/01/86 10/26/84 Gas Samples from the Containment Leak Detector During Emergencies EP-235 6

Obtaining Reactor Water 04/01/86 10/26/84 Samples from Sample Sinks Following Accident Conditions EP-236 5

Obtaining Cooling Tower 03/14/85 10/26/84 Blowdown Line Water Samples Following Radioactive Liquid Release after Accident Conditions EP-237 8

Obtaining the Iodine /

04/01/86 10/26/84 Particulate and/or Gas Samples from the North Vent Wide Range Gas Monitor (WRGM)

EP-238 5

Obtaining Liquid Radwaste 04/01/86 10/26/84 Samples from Radwaste Sample Sink Following Accident Conditions EP-240 CANCELLED EP-241 9

Sample Preparation and 04/01/86 10/26/84 Handling of Highly Radioactive Liquid Samples EP-242 5

Sample Preparation and 03/28/85 10/2,6/84 Handling of Highly Radioactive Particulate Filters and Iodine Cartridges l

EP-243 6

Sample Preparation and 04/01/86 10/26/84 Handling of Highly Radioactive Gas Samples EP-244 3

Offsite Analysis of

.03/12/85 10/26/84 High Activity Samples EP-250 2

Personnel Safety Team 12/12/84 10/26/84 IP-251 3

Plant Survey Group 04/01/86 04/01/86 i

A a

a_.

i Page 3 of 5 1

  • l Revi'sio'n 55 05/12/86 i

~

t j

LIMERICK GENERATING STATION EMERGENCY PLAN PROCEDURE INDEX PROCEDURE REV.

DATE SIGNED DATE OF LAST NUMBER NO.

TITLE BY SUPER.

PERIODIC REVIEW l

EP-252 6

Search and Rescue /First 04/22/85 04/01/85 Aid Group EP-253 0

Personnel Dosimetry, 12/12/84 12/12/84 Bioassay, and.

Respiratory Protection Group EP-254 3

Vehicle and Evacuee 02/04/85 10/26/84 Control Group EP-255 2

Vehicle Decontamination 12/12/84 10/26/84

~

EP-260 2

Fire and Damage 12/12/84 10/26/84 Control Team EP-261 2

Damage Repair Group 12/12/84 10/26/84 EP-272 5

Philadelphia Electric 02/10/86 10/26/84 Company Officials Phone List EP-273 6

Limerick Station 01/02/86 01/02/86 4

Supervision Call List i

EP-275 CANCELLED EP-276 7

Fire and Damage 02/10/86 02/10/86 i

Team Phone List l EP-277 9

Personnel Safety 05/12/86 01/09/86 Team Phone List EP-278 7

Security Team Phone List 05/12/86 02/10/86 EP-279 8

Emergency Operations 05/12/86 10/26/84 Facility (EOF) Group Phone List l EP-280 9

Technical Support 05/12/86 02/10/86 Center Phone List EP-282 6

Government and 02/10/86 04/22/85 l

Emergency Management Agencies Phone List l EP-284 6

Company Consultants 05/12/86 02/10/86 and Contractors Phone List i

EP-287 3

Nearby Public and 02/11/85 10/26/84 Industrial Users of Downstream Water I EP-291 7

Staffing Augmentation 05/12/86 10/26/84 j

.~.. _,

4

', l Revi'sion 55 Paga 4 of 5 1

05/12/86 I

LIMERICK GENERATING STATION EMERGENCY PLAN PROCEDURE INDEX i

l

}

PROCEDURE REV.

DATE SIGNED DATE OF LAST NUMBER NO.

TITLE BY SUPER.

PERIODIC REVIEW j

l EP-292 9

Chemistry Sampling and 12/18/85 04/22/85 Analysis Team Phone List j

l EP-294 0

Dose Assessment Team 05/12/86 01/09/86 Phone List EP-301 1

Operating the Evacuation 12/12/84 10/26/84 Alarm and River Warning System EP-303 3

Local Evacuation 12/12/84 12/12/84 EP-304 3

Partial Plant Evacuation 12/12/84 10/26/84 EP-305 5

Site Evacuation 03/25/85 10/26/84 EP-306 3

Evacuation of the.

02/10/86 10/26/84 Information Center EP-307 2

Reception-and Orientation 12/12/84 10/26/84 of Support Personnel

--EP-312 5

Radioactive Liquid 01/09/86 01/09/86 Release EP-313 2

Distribution of Thyroid 12/12/84 10/26/84 Blocking Tablets EP-314 1

Emergency Radiation 03/29/85 12/06/84 Exposure Guidelines and Controls

~

EP-315 7

Calculation of Offsite 03/25/86 01/09/86 i

Doses During a Radiological Emergency Using RMMS in the Manual Mode j

EP-316 4

Cumulative Population 02/10/86 02/10/86 and Near Real-Time i

Emergency Dose i

Calculations for l

Airborne Releases Manual Method EP-317 3

Determination of 03/25/85 10/26/84 Protective Action Recommendations EP-318 2

Liquid Release Dose 04/01/85 04/01/85 Calculations Method for I

l Drinking Water l

EP-319 2

Fish Ingestion Pathway 03/29/85 03/29/85 i

Doce Calculation

(/

}

i Page 5 of 5 l

Revision 55 05/12/86 u

LIMERICK GENERATING STATION EMERGENCY PLAN PROCEDURE INDEX j

PROCEDURE REV.

DATE SIGNED DATE OF LAST NUMBER NO.

TIT,d BY SUPER.

PERIODIC REVIEW EP-325 3

Use of Containment 02/27/85 10/26/84 t

Dose Rates to Estimate j

Release Source Term EP-330 4

Emergency Response 03/14/85 10/26/84 Facility Habitability EP-333 1

Adjustment of Wide 05/08/85 05/08/85 Range Gas Monitor Conversion Factors EP-401 3

Entry for Emergency 04/01/86 04/01/86 Repair and Operations EP-410 3

Recovery Phase 03/29/85 10/26/84 Implementation EP-500 2

Review and Revision 12/12/84 10/26/84 j

of Emergency Plan

)

\\M e

-~-y.

- = - -,, -,

-y g

,ms

-. --+-- -

-e-.

.w--- -, r m--.-w.-.--

y w

esy.

'l i

EP-210 Rev. 5 336504757L Page 1 oe 5 l

MJR/,MAC/ nip

idi.-

PHILADELPHIA ELECTRIC COMPANY

' l ' /

LIMERICK GENERATING STATION 4'

EMERGENCY PLAN IMPLEMENTING PROCEDURE EP-210 DOSE ASSESSMENT TEAM 1.0 PARTICIPANTS 1.1 Shift Technical Advisor (STA) performs dose assessment activities as necessary or until relieved by the Dose Assessment Team Leader.

1.2 Dose Assessment Team Leader (DATL) directs the activities of the Dose Assessment and Field Survey Groups and advises the Emergency Director or Site Emergency Coordinator on Protective Action Recommendations consistent with EP-317.

1.3 The Dose Assessment Team shall include the Dose Assessment Team Members and the Field Survey Group.

2.0 ACTIONS-IMMEDIATE 2.1 Shift Technical Advisor shall:

2,1.1 Perform necessary dose calculations tsing the Emergency Plan procedures (*) listed in Reference Section 5.4.

2.1.2 Advise the Emergency Director on prot'ective a

.on recommendations in accordag 5

75 Determination of Prote 95 m

s.

2.2 TheDoseAssessmentTeagjbh 2.2.1 Upon notification that the TSC is to be activated implement EP-294, Do List.

g, s

n. Team Phone 2.2.2 A turnover of dose asse h

I si es (between any of the fol 3;

led:'$iA, DATL/TSC, DATL/ EOF) shall include the transmirtal of any available information from Appendix EP-210-1.

l 2.2.3 Assemble and brief Dose Assessment Team Members.

\\/

Direct Dose Assessment Team members to perform dose 2.2.4

~

calculations using the Emergency Plan procedures (*)

listed in Reference Section 5.4.

-..-..--.:.- z.: u: ^- -

~

~

-^

^

.-l EP-210 Rev. 5 Page 2.of 5 4

l MJR/MAC/nlp

\\_/

2.2.5 Request the Field Survey Group Leader to assemble the appropriate number of personnel to form Field Survey Squads.

A Squad is comprised of a Health Physics technician and a drive'r.

2.2.6 Contact the Emergency Director in the TSC or Site Emergency Coordinator in the EOF when the Dose 1

Assessment Team is ready to assume responsibility for j

dose assessment activities.

2.2.7 Assign dose assessment calculation r*esponsibilities to each Dose Assessment Team Member.

2.2.8 Implement EP-317, Determination of Protective Action 2

Recommendations, when dose calculations become available, l

2.2.9 Advise the Emergency Director or Site Emergency l-Coordinator on protective action recommendations in I'

accordance with EP-317, Determination of Protective j.

l Action Recommendations.

2.3 Dose Assessment Team Members shall:

(i 2.3.1 Contir.aously trend applicable plant process radiation monitor levels.

2.3.2 Continuously trend meteorological-parameters.

2.3.3 Update the DATL of any significant change in radiation L

or meteorological parameters, especially changes in L

stability class and plume direction.

2.3.4 Perform any dose assessment procedures as directed by l

the DATL.

[!

2.3.5 Update status board (or status board keepers).

3.0 ACTIONS-FOLLOW-UP 1'

3.1 The Dose Assessment Team Leader shall perform the f

following as required:

[

3.1.1 Review dose calculation parameters.

3.1.2 Coordinate the placement of Field Survey groups, through the Field Survey Group Leader, prompting him to periodically brief the Field Survey squads on plant and release staus.

u-3.1.3 Coordinate with Technical Support personnel 1

periodically to ascertain plant status and release t

pathway and impact of operator actions on releases.

I

-~

.. ~.

.l EP-210 Rev. 5 Page 3 of 5 l

MJR/MAC/ nip

(_-

3.1.4 Request from the Chemistry Sampling and Analysis Team Leader inplant and effluent samples as necessary, and SGTS filter efficiency.

3.1.5 Contact the Load Dispatcher or the National Weather Service for an extended weather forecast.

3.1.6 Transmit (potential) plume direction status to Security Team Leader.

Update with changes.

3.1.7 Report dose projection and field survey results to offsite organizations, as requested bf the Emergency Director, or Site Emergency Coordinator.

3.2 Turnover of Dose Assessment Responsibilities 3.2.1 All turnovers of Dose Assessment responsibilities should include the transmittal of the information listed in Appendix EP 210-1, as available.

3.2.2 The transfer of Dose Assessment responsibility from the TSC to the EOF shall occur upon agreement by the Emergency Director, the Site Emergency Coordinator and the Dose Assessment Team Leaders at the TSC and EOF.

L 4.0 APPENDICES 4.1 Turnover of Dose Assessment Responsibilities i

l' 5.0 SUPPORTING INFORMATION 5.1 Purpose The purpose of this procedure is to provide guidelines for the activation of the Dose Assessment Team in the Technical Support Center (TSC) and the transfer of Dose Assessment functions to the Emergency Operations Facility (EOF).

5.2 Criteria for Use 5.2.1 The Dose Assessment Team should be activated and this procedure implemented at the discretion of the Emergency Director or when the Technical Support 4

i Center (TSC) is activated.

i j

5.3 Special Equipment i

ss i

None

.y_.-

--m-. - - -, -

-_.,v-

~,,=-ey--.-e--,

wr,--- -- -

'e----

--w-e

=

w--

v -

T-*----

---1-"'-

--~-' " ' - " - * - - * - - - ~ - - ~

y

~ ~-

~~

l*

l EP-210 Rev. 5 Page 4 of 5 l

MJR/MAC/nlp C

5.4 References 5.4.1 *EP-315, Calculation of Offsite Doses During a Radiological Emergency Using RMMS in the Manual Mode 5.4.2 *EP 315-1, Airborne Release Caclulations with RMMS in the Automatic Mode 5.4.3 *EP-316, Cumulative Population and Near Real-Time Emergency Dose Calculations for Airborne Releases Manual Method 5.4.4 *EP-317, Determination of Protective Action Recommendations 5.4.4 *EP-318, Liquid Release Dose Calculations Method for Drinking Water 5.4.6 *EP-319, Fish Ingestion Pathway Dose Calculation 5.4.7 *EP-325, Use of Containment Radiation Monitor to Estimate Release Source Team 5.4.8 EP-222, Field Survey Group 5.4.9 EP-294, Dose Assessment Team Phone List w/

-[

  • l l,.

EP-210 Rev. 5 Page 5 of 5 l

MJR/MAC/ nip APPENDIX EP 210-1 TURNOVER OF DOSE ASSESSMENT RESPONSIBILITIES Turnover of dose assessment responsibility from one Dose Assessment team / location to another Dose Assessment team / location shall include the transmittal of any available information listed below:

1.. Time of reactor trip / scram 2.

Release point 3.

Effluent type (gas or liquid) 4.

Start time of release 5.

Estimated duration of release 6.

Containment information: primary containment leakage, D/W purge status, # fans in operation 7.

Post LOCA radiation monitor readings 8.

Meteorology:

Wind speed, wind direction, sigma theta, delta temperature, ambient temperature 9.

Stability class

10. (Potential) release type (ground, elevated, mixed mode)
11. Results of dose calculations, if performed:

A.

Location, value - peak X/Q, depleted X/Q, undepleted X/Q, peak Whole Body gamma dose rate, peak thyroid dose l

B.

Time to reach Protective Action Guides C.

Whole body gamma dose rate - site boundary, 2 mi, 5 mi, 10 mi D.

Phone # where " relieved" DATL can be reached E.

Protective Action recommendations, if any were made

12. Field Survey Squad (s) status, # teams available, dispatched, time dispatched, location and results, team exposures.
13. Plant status
14. Source term basis a

_,. - ~ _, _.,. - _, __

~

1 o

/3 Page 1 oe s MJR/.jek p

PHILADELPHIA ELECTRIC COMPANY

/

LIMERICK GENERATING STATION i! 5,'[$

EMERGENCY PLAN IMPLEMENTING PROCEDURE EP-277 PERSONNEL SAFETY TEAM PHONE LIST 1.0 PARTICIPANTS 1.1 Personnel Safety Team Leader calls i roup Leaders.

1.2 Plant Survey Grouc Leady 1

lth Physics (HP) Un t Tfg a gg f:

'1d the HP Senior Technic' g

Health._PATki bhnicians calls the F 'Pl ! N$r S 1.3 l

HP t

1 s

Ig4! t lI their shift.

  • 5';

REA DDE IS 215 UNLESS OTHERWISE

, rn J

i V 2.0 ACTIONS V.,E'hI TE 2.1 Personnel Safety Team Leader:

Name Home Workm L

l l

2.1.1 ersonnel Safety Team er aKien people from the following list until

  1. 1 e group leader positions are filled.

,5 g { {

2.1.2 Plant Sitrvey Group teader 7

Name H

Work l

o' EP-277, Rev.,9 Page 2 cf 5 MJR/jek

~

2.1.3 Personnel Dosimetry, Bioassay, and Respiratory Protection Group Leader Name Home Work 2.1.4 Vehicle and Evacuee Control Group Leader Name Hofne Work 2.2 Plant Survey Grouc Leader shall call the Health Physics Unit Technical Assistant and the Health Physics Sr. Technicians:

Name 9ome Work

/

l'

'I l

)

2.3 alth Physics Sr. Technicians shall the individuals on their shift and inl em to report to the OSC (unless an a

('

is designated by The Personnel 1

6 :

Leader)as follows:

f L

-_a

l l'

EP-277, Rev. 9 j

Page 3 of 5 MJR/jek NOTE THE FOLLOWING SHIFTS ARE THOSE IN EFFECT ON 11/14/85.

AS CHANGES OCCUR, THE SR. TECHNICIANS SHOULD CALL THOSE PERSONNEL ASSIGNED TO THEIR SHIFT AT THAT TIME.

j

' 3.1 Name Home Work

{

/

)

I l

l 1

f I,

4 1

l 2.3.2 Name Home Work r

O I

i i

I

)

1 l

1 i

i b

1

~

)

EP-277, Rev. 9 Page 4 of'5 MJR/jek 2.3.3 Name Home Work

{

b 1

(

g - y.

~

f j

{

3.0 ACTIONS-FOLLOW-UP 3.1 None required l

4.0 APPENDICES 9

None 5.0 SUPPORT UTa V

5.1 purpose of this procedure is to provide aidelines and information to call in Personnel Safety Team Members.

5.2 Criteria for Use This procedure can be used when the Personnel Safety Team is activated or when additional people are needed.

V

Id'

~

EP-277, R:;v. 9

~*

Page 5 of~5 MJR/jek 5.3 Special Equipment None 5.4 References None O

e V

0

[f, EP-278, Rev. 7 d6504759L

[^IUa[PNgl

(

PHILADELPHIA ELECTRIC COMPANY

-j LIMERICK GENERATING STATION D I, 2,,, c, EMERGENCY PLAN IMPLEMENTING PROCEDURE EP-278 SECURITY TEAM PHONE LIST 1.0 PARTICIPANTS j

SecurityTeamLegdeMgh.l vf o

1.1 pt,e. : s'.'

2.0 a

- 2.1 t/ ')eam Leader shall call people f rom the fy lowing list until one of the following can be contacted to function as the Security Team Leader in the~TSC.

Home Work 2.2 If one of the above cannot be re t one of the following to man th ader desk until relieve

)

Y 2.3 Security Team Members,3 g i

The Security Team lea 1

shall ensure that either the number of Security Force Members on shift is sufficient to support the Security response required or shall call in additional Security Force Members until the numbers are sufficient.

V

e-.

a l.

EP-278, Rsv. ' 7

" ~~

Page 2 of 2 MJR/JLP:rgs

(-

3.0 ACTIONS - FOLLOW-UP

^

None Required 4.0 APPENDICES None S

5. 0-SUPPORTING INFORMATION 5.1 Purpose l

The purpose of this procedure is to provide i

guidelines and information to call in the Security Team.

1 5.2 Criteria for Use 4

l This procedure can be used when the Security Team is to be activated or when people need to be called in.

i

(-

5.3 Special Equipment l

None 5.4 References None 9

e e

f 9

d I

l j

l,-

EP-279,'Rev. 8 l

386504760L.

Page 1 of 3 MJR/rgs L

q I, l!, '

PHILADELPHIA ELECTRIC COMPANY i

LIMERICK GENERATING STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE l

EP-279 EMERGENCY OPERATIONS FACILITY (EOF) GROUP PHONE LIST l

1.0 PARTICIPANTS I

1.1 Communicator calls in group member needed to o

j l

support the EOF.

1 kid 2.0 ACTIONS - IMMEDIATE qq l

EOF staff ar i

2.1 L 11 people from the following list p,.,

ate positions are filled.

2.2 tors and Status Board Keecers (5 Minimum, p].?columnAfirst)

A B

3 j

m l

l home j

work i

i home

{

work i

i home work l

home work l

home l

work i

l l

l home work L

i

l l

I*

EP-279, Rev. 8 l

Page'2 of 3 i

l MJR/rgs i

l A

B i

home j

work

{

l home work j

l home work i

j home work i

home work i

2.3 Data Display Operators L

3.0 ACTIONS - FOLLOW-UP 3.1 None Required.

j 4.0 APPENDICES I

None l

j 5.0 SUPPORTING INFORMA%IQt j

t 5.1 Purn The rocedure is to provide guidelines i

and i n to call in the EOF Staff.

5.2 Criteria for Use This procedure can be used when the EOF is activiated or additional personnel are needed.

]

i

!.. ~

EP-279, RGv.' 8 i

Page'3 of 3 MJR/rgs 5.3 Special Equipment None 5.4 References None t

t 0

l EP-280 Rev.'9 386504761L Page 1 of 6 MJR/rgs D.

' :;f:f~.

f k-PHILADELPHIA ELECTRIC COMPANY

/. i, f f LIMERICK GENERATING STATION

$ ^ ' U2 EMERGENCY PLAN IMPLEMENTING PROCEDURE i

j EP-280 TECHNICAL SUPPORT CENTER PHONE LIST 1.0

' PARTICIPANTS I'

l.1 The Emergency Director shall be resp ible to have group members notified.

j 1.2 The Communicator shall call in el.

l r

4 j

2.0 ACTIONS - IMMEDIATE 2.1 The Communicator sh from the following i,

list until appro ns are filled.

]

2.1.1 EMERGENCY DIR 1

Home Work V

1 i

i i

l 2.1.2 l

l 1

l

[

d lu k

f

n

~

v-

', j.-

\\

\\

' EP-280 Rev.'9 Page 2 of 6 s -

MJR/rgs s-(

/

Group Members

s h

home work h0me vork o

home-l work home Work nome work home work k

hone work I

home l

work home wor home work home work j

v.

l

~

/

  • Licensed

. e 4

e I

I g

C

P i

I i

l I

EP-280 Rev.'9 l

Page 3 of 6 MJR/rgs I

l I

2.1.3 i

. PERSONNEL SAFETY TEM 1 LEADER (ONE) i l

i me Work

\\

4

\\

\\

\\

i

\\

i 1

i 1

T

\\

\\

I 1

4 l

t I

i i

i

+

i t

i

\\

V l

1 1

,%m--<

7.___,r.

-.-.-,,-._,n-_._c_. _,., __ ____. _ _ _.. _ _ _ - - -____-, _,_,

r.

..m.--,_m

,_-w,w,-w-yg.,w-..

EP-280 Rev.'9

~

Page 4 of 6 MJR/rgs

(

2.1.7 CHEMISTRY SAMPLING AND ANALYSIS TEAM LEADER (ONE)

Home Work 2.1.8 COMMUNICATORS AND STATUS BOAR $ KEEPERS ( r'I.VE MINIMUM, CALL COLUMN A FIRST)

Lead Communicators ome work home work home work y

home work home work home work home work G

______m________

    • l-EP-280 Rev.-9 Page 5 of 6 MJR/rgs C

A.

B 1

I O

I I

I 2.1.9 LJ l

i 2.1.10 I

i i

3.0 ACTIO1

-FOLLOW UP None L

a

',,.. l *.

EP-280 Rsv. 9 Page 6 of 6 MJR/rgs 4.0 APPENDICES None i

5.0 SUPPORTING INFORMATION 5.1 Purpose The purpose of this procedure is to provide guidelines and information to call in Technical Support Center (TSC) personnel.

l*

5.2 Criteria for Use 5.2.1 The Technical Support Center is to be activated.

5.2.2 Additional Technical Support Group people must be called in.

5.3 Special Equipment None 5.4 References None s

r

p., n,_.. -

7

- - ~

l'.

336504762C EP-284 Rev. 6 Page 1 of 3 MJR/mc

... ?$1,,

PHILADELPHIA ELECTRIC COMPANY

' 9 f. -! K

LIMERICK GENERATING STATION

^C EMERGENCY PLAN IMPLEMENTING PROCEDURE EP-284 COMPANY CONSULTANTS AND CONTRACTORS PHONE LIST 1.0 PARTICIPANTS 1.1 Communicator shall be responsible,t

\\

contractor or consultants a needed.

\\

2.0 ACTIONS-IMMEDIA 4 2.1 Communicat

..kact the needed contractor or consultant'

.g the following list.

Address Phon 2.2

'5g

/

2.3 1

2.4 O

2.s 2.6 L

s

l EP-284 Rev.

6, Page 2 of 3 MJR/mc

/

. ~. -..

2.7 [

j 9

l

/

l 2.8 1

s-h

~

t 2.9 l

e,.

(i '.

+

'A i

4 2.10 L

~

E

/

2.11

/

i

\\

2 3.0 ACTIONS-FOLLOWUP 3.1 None required.

y

..l

~ -[

EP-284 Rev. 6

/

Page 3 of 3 MJR/mc C 4.0 APPENDICES None.

5.0 SUPPORTING INFORMATION 5.1 Purpose The purpose of this procedure is to provide information to contact PECO consultants and contractors.

5.2 Criteria for Use This procedure may be used when it is necessary to

~

contact a company consultant or contractor.

Requests for consultants or contractors shall be approved by the Site Emergency Coordinator or Emergency Director.

5.3 Special Equipment None.

V 5.4 References None.

l i

4 m*

e e

l' -

EP-291 Rev', 7 l

3865047630 jm

"^S*

7 h'/ :.,

PHILADELPHIA ELECTRIC COMPANY LIMERICK GENERATING STATION m.h EMERGENCY PLAN IMPLEMENTING PROCEDURE EP-291 STAFFING AUGMENTATION

,1. 0 PARTICIPANTS 1.1 Shite Clerk or other assigned person shall perform the following procedure.

2.0 ACTIONS - IMMEDIATE 2.1 Shift Clerk or other assigned person shall:

2.1.1 Ask the Emergency Director if the TSC and EOF or the TSC only is to be activated so that this information can be given to the Dose Assessment Team Leader and Communicators and what groups are be activated for transmission to Team Lead i

Event Classifi Facili

-g N

T uv ups to be a g

Personnel Safe m

Plant Survey R

j\\l5N

~

lst Aid / Search and res

(

nt W 4

Vehicle and E

' k cll Dosimetry, Bioassay &

Respiratory Protection Dose Assessment Team Dose Assessment group Field Survey Technical Support Team

a I,.

EP-291 Rev'. 7 Pace 2 of 7 I

~

MJR/mc us Security Access Control Personnel Accountability Fire and Damage Fire Fighting 4

Damage Repair Chemistry Sampling and Analysis 2.1.2 Con act in sequence the personnel li t Section 2.2.

4 2.1.3 Inform each person co *a e

d-classification,.tha t

i and to their assigned loc ti n n

.)

'n i unable to respond, under them are to be activat d' N,

go t h

x n the list.

i ii 2.1.4 A

c personnel who have pagers, by th

.f they are known to be "on the page",

s-or n

is busy or there is no answer.

2.1.5 Inform Emergency Director of results including discrepancies.

2.2 Personnel to be contacted are:

2.2.1 SHIFT I&C TECHNICIAN Communicator shall request 2 SC be activated.

(Shift I&C Technician ext I&C Technician Time By l

l 9

l EP-291 Rev. 7 Page 4 of 7 l

MJR/mc L

2.2.5 DOSE ASSESSMENT TEAM LEADER (ONE)

Comnunicator shall request the Team Leader to call in team and the Field Survey Group Leader, and to report to the TSC or EOF as determined by Step 2.1.

Disposition-Busy, Time Called No Ans.-Contacted Called By k

2.2.6 SHIFT MAINTENANCE SUB-FOREMAN 4

.,i

\\

^

e 3.,

Extensi r page.

m. u 1

equest the Maintenanc

-forema a

tenance mechanics, preferably, n

'l ind two machinists or fitters.

,q'

.\\

Sub-foremaq t b

\\

By ANhk U

2.2.7 TEC T TEAM LEADER (ONE)

Communicator shall request call in of Technical Support Team Members.

/

Disposition-Busy, Time Called No Ans.-Contacted Called By

~~

l u

l.

EP-291 Rev. 7 Page 3 of 7 I

MJR/mc L-222 EMERGENCY DIRECTOR The Station Superintendent or Assistant Station Superintendent is contacted by communicator and is one contact.

Do not re-contact if he has been successfully reached.

Disposition-Busy, m Time Called No Ans.-Contacted Called By

f..,, a -Q.:. ~ ;f_f. 'f- {l ' ' [ A ". ' {

R

\\

,,'Y h.[

k YN N

f o

)

?;

[-

y k

2.2.3 OPERATIONS ENGINEER Tigne _Ca AM lled By k

2.2.4 PERSONhEL SAFETY TEAM LEADER (ONE)

Communicator shall request that the Team Leader call in Group Leaders of groups to'be activated and that the Group Leaders call in their groups.

Disposition-Busy, Time Called No Ans.-Contacted Called By

/

\\.

t i

i

\\

l EP-291 Rev. 7 Page 5 of 7 l

MJR/mc w

l 2.2.8 COMMUNICATORS (ONE per facility)

)

1 Communicator shall request call in of members for the TSC or EOF as determined by Step 2.1.1.

Disposition-Busy, Time Called No Ans.-Contacted Called By

' f' l

r "1

v>

2. 2. 9
  • CHEM a d ANALYSIS TEAM LEADER (ONE)

Commun r'shall request call in of Chemistry Sampling and Ana is Team Members by Group Leader.

Disposition-Busy, Time Called No Ans.-Contacted Called By t.

i Y

l

l[*

EP-291 Rev. 7

{

Page 6 of 7 MJR/mc L

2.2.10 FIRE AND DAMAGE TEAM LEADER (ONE)

Communicator shall request the Team Leader to call the appropriate Group Leaders and have Group Leader call in Group Members.

Disposition-Busy, Time Called No Ans.-Contacted Called By m

~-

,4

,y

.,9.:.. _

. ;,;p'f 4-

, y #5. Kg, f -*

./

.. 4.

2.2.11 SECURITY TEAM LEADER (ONE)

Communicator shall request Leader to call a

appropriate Grou roup Leaders call in personnel.

tion-Busy, Ans.-Contacted Called By T-T J w I

I

.I k

i I

\\N f

/

3.0 ACTIONS-FOLLOW-UP Q

3.1

.None Required.

l * ' '<~ ', '.

EP-291 RIV. 7 Page 7 of 7 l'

MJR/mc

'4.0 APPENDICES None.

5.0 SUPPORTING INFORMATION 5.1 Purpose The purpose of this procedure'is to provide guidelines and #

information necessary to perform staff augmentation.

5.2 Criteria for Use This procedure shall be implemented at an Alert, a' Site Emergency or a General Emergency or at the discretion of the Emergency Director.

5.3 Special Equipment None.

5.4 References

+

None.

V I

1 1

's

~

/

EP-294 l'

Rev. 8 3865047890 Page 1 of m

G

. ; -. ~

PHILADELPHIA ELECTRIC COMPANY 4,-[!'4 j,ff LIMERICK GENERATING STATION a

EMERGENCY PLAN IMPLEMENTING PROCEDoRE EP-294 DOSE ASSESSMENT TEAM PHONE LIST 1.0 PARTICIPANTS,'

p 1.1 Dose Assessment TgAp hap (

l l

in group mem 1.2 Field Survey ers S.

1 t'o ' b t o

group memoers {a TyATU 2.0 ACTIONS - IMMEDIATE 2.1 Dose Assessment Team Leader shall call people from the following list until appropriate positions are filled.

l 2.1.1 DOSE ASSESSMENT TEAM LEADER (ONE)

-s i

Name Home Phone I

g Work Phone /

~

I i

DoSEASSESSMENTcaooPgMj}{jfi 1

2.1.2 c

xlNIxox3 Name Home Phone i

I I

t I

v O

ux x s _._.: : - :x u _ _ w...

-mu z gw-

,,nn N.

r.

EP-294

'l Rev. 8 Page 2 of 3 MJR/mc u

2.1.3 FIELD SURVEY GROUP LEADER (ONE)

Name Home Phone Work Phone 2.2 The field survey group leader shall obtain people frcm the Personnel Safety Team Leader until appropriate positions are filled (4 minimum).

2.2.1 The Field Survey Group Leader shall call the i

following individual (s) to obtain vehicles for the l

Field Survey Group (4 minimum).

Name Home Phone Work Phone' l

2 2

The Field Survey Group Leader shall tact the l

Fire and Damage Team Leader (EP 276) fpr drily V

3.0 ACTIONS - FOLLO If ww.A, i

3.l None require

~

Env 4.0 APPENDICES None.

5.0 SUPPORTING INFORMATION 5.1 Purpose The purpose of this procedure is to provide guidelines and information to call in the Dose Assessment Team.

5.2 Criteria for Use This procedure can be used when the Dose Assessment Team is to be activated or additional people are needed.

L

,, 4 1 I

EP-294 l

Rev. 8 Page 3 of 3 1

l MJR/mc U

5.3 Soecial Eculement None.

5.4 References None.

e

i pa newy4 UNITED STATES

[

NUCLEAR REGULATORY COMMISSION l

t WASHINGTON, D. C. 20555

% * * * *

  • p#

June 17,1986 50-352/353 Limerick MEMORANDUM FOR:

Chief, Document Management Branch, TIDC l

FROM:

Director, Division of Rules and Records, ADM

SUBJECT:

REVIEW 0F UTILITY EMERGENCY PLAN DOCUMENTATION The Division of Rules and Records has reviewed the attached document and has determined that it may now be made publicly available.

/ h s Y k ^**A)

Donnie H. Grimsley, Director Division of Rules and Records,j f7 Office of Administration p

Attachment:

As stated r

-