ML20206D954
| ML20206D954 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 03/31/1986 |
| From: | Carey J, Smith P DUQUESNE LIGHT CO. |
| To: | NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| NUDOCS 8606230016 | |
| Download: ML20206D954 (5) | |
Text
.
NARRATIVE
SUMMARY
OF MONTHLY OPERATING EXPERIENCE MARCH 1986 March 1 The Station was in Operational Mode 1 with reactor through power at a nominal 100 percent with the Reactor March 31 Coolant System at a normal operating pressure and temperature, i
1 i
)
8606230016 860331
$4 PDR ADOCK 05000334 1
R eDR ili 1
OPERATING DATA REPORT DOCKET NO. 50-334 DATE 4/4/56 COMPLETED BY
_P. A. Smith TELEPHONE. 417-641-1825 OPERATING STATUS
- l. Unit Name: Beaver Valley Power Station. Unit #1 Notes
- 2. Reporting Period:
March 1986
- 3. Licensed Thermal Power (MWt):
2660
- 4. Nameplate Rating (Gross MWe):
923
- 5. Design Electrical Rating (Net MWe):
835
- 6. Maximum Dependable Capacity (Gross MWe):
860
- 7. Maximum Dependable Capacity (Net MWe):
810
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To which Restricted,if Any (Net MWe):
No"*
i
- 10. Reasons For Restrictions,if Any:
N/A This Month Yr..to-Date
' Cumulative 4
- 11. Hours in Reporting Pen. d 744.0 2,160.0 86,928.0 o
t
- 12. Number Of Hours Reactor Was Critical 744.0 2,116.6 47_,717.6
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 4.482.8
- 14. Hours Generator On Line 744.0 2,115.3 46,250.1
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1,955,574.0 5.448.398.0 108,471.829.I
- 17. Gross Electrical Energy Generated IMWH) 641.260.0 1,785,180.0 34,566,560.0
- 18. Net Electrical Energy Generated (MWH) 6n6.640.0 1,686,890.0 32,213,193.0
- 19. Unit Service Factor 100.0 97.9 55.7
- 20. Unit Asailability Factor 100.0 97.9 55.7
- 21. Unit Capacity Factor iUsing MDC Net) 100.7 96.4 49.3
- 22. Unit Capacity Factor (Using DER Net) 97.6 93.5 47.9
- 23. Unit Forced Outage Rate 0.0 2.1 23.1
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Dete.and Duration of Eacht:
Fifth Refueling - May 16, 1986 - Scheduled 93 days
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status IPrior to Commercial Operation):
Forecast Achieved INITIA L CRITICA LITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPER ATION N/A
_ N/A (9/77)
,,_y,-,__w----,,. - - - -,, y
e AVERAGE DAll UNIT POWER LEVEL DOCKET NO.
50-331 UNIT I'Gs c::1.i; 4/4/86 DATE
)
COMPLETED BY P.A. Smith i
I TELEPHONE G12) 6434825 MARCH MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL IMWe-NetI (MWe-Net) 821 831 g
7 813 813 3
gg 817 808 3
39 821 833 4
20 S
8_21 808 21 821 825 22 825 7
23 817 813 821 8
24 813 808 9
25 808 808 10 24 817 813
'I 27 I
12 812 23 817 816 808 g3
- 9 14 804 800 30 15 821 808 y,
818 16 INSTRUCTIONS On this formst.! st the average daily unit power le.e!in MWe Net far each day in the reputting month. C, impute to the nearest whole mepwatL.
19177)
i MAJOR MAINTENANCE 1.
Maintenance of Charging Pump (CH-P-1B) 2.
Maintenance of River Water Pump (RW-P-1B)
I
'Af Telephone (412) 393-6000
.O. Box 4 i
Shippingport, PA 15077-0004 April 7,1986 Beaver Valley Power Station, Unit No.1 Docket No. 50-334 License No. DPR-66 Monthly Operating Report U. S. Nuclear Regulatory Commission Director, Office of Management Information & Program Control Washington, D. C. 20555 Gentlemen:
In accordance with Appendix A,
Technical Specifications, the Monthly Operating Report is submitted for the month of March,1986.
Very truly yours,
,y J. J. Carey Vice President Nuclear Group rw I
Enclosures cc: NRC Regional Of fice King of Prussia, PA 56,
,