ML20206D940
| ML20206D940 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 03/31/1986 |
| From: | Alden W, Logue R PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| NUDOCS 8606230002 | |
| Download: ML20206D940 (6) | |
Text
.
's OPERATING DATA REPORT DOCKET NO. 50 - 352 DATE APRIL 15, 1986 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE LICENSING SECTION NUCLEAR GENERATION DIVISION TELEPHONE t215I 841-5022 OPERATING STATUS
- 1. UNIT NAMEt LIMERICK UNIT 1 l NOTES: THE UNIT RAN AT FULL l
l l
- 2. CEPORTING MRI008 MARCH, 1966 l
LOAO THROUON THE l
l 1
- 3. LICENSED THERMAL POWERttelTit 3293 i
REPORTING PERIOD.
l l
l
- 4. NAMEPLATE RATING (GRDSS MWElt 1136 l
l l
l
- 5. DESIGN ELECTRICAL RATING ENET MWEli 1955 l
l l
l
- 6. MAXIMUM DEPENDA8LE CAPACITY (GROSS MWElt 1992 l
l l
l
- 7. MAXIMUM DEPENDA8LE CAPACITY (NET MWEls 1055 l
l
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUPSER 3 THROUSN 7) SINCE LAST REPORTe GIVE REASONS 8
- 9. POWER LEVEL TO letICH RESTRICTED, IF ANY (HET PO4Elt
- 10. REASONS FOR RESTRICTIONS. IF ANY:
THIS MONTH YR-TO-DATE CLMULATIVE
- 11. NOURS IN REPORTING PERIGO 744 1.416 1.416
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 1.395.1 1,395.1
- 13. CEACTDR RESERVE SHUTDOWN NOURS 0.0 0.0 0.0
- 14. NOURS GENERATOR DN-LINE 744.0 1.389.6 1,389.6
- 15. UNIT RESERVE SNUTDOWN NOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWHI t,443.676 4 553,652 4:553.652.
- 17. GROSS ELECTRICAL ENERGY GENER4TED (MWN) 815,060 1,515.030 1.515.030
- 18. NET ELECTRICAL ENERGY GENERATED (MWN) 785.640 1.459.563 1.459.543
- 19. UNIT SERVICE FACTOR 100.0 96.1 96.1 B60623 BOO 2 860331 M )*I
-* C 1 PDR ADCCK CFSCH)O352 I
R PM
_ =.
0
- 20. UNIT AVAILABILITY FACTOR 100.0 96.1 96.1
- 21. UNIT CAPACITY FACTOR (USING NDC NET) 100.1 97.7 97.7
==
- 22. UNIT CAPACITY FACTOR (USING DER NET) 100.1 97.7 97.7 i
- 23. UNIT FORCED OUTAGE RATE 0.0 1.9 1.9
- 20. SHUTDOW45 SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATEe AM) DURATION OF EACHit j
Unit 1 will be shutdown in Riy for surveillance testing and general maintenance necessary to operate until the 1st refueling outage. The outage is expected to take six to eight weeks.
- 25. IF SHUTDOW4 AT EM) 0F REPORT PERIOD, ESTIMATED DATE OF STARTUP*
i
- 26. UNITS IN TEST STATUS (PRIOR TO Cort 1ERCIAL OPERATION)
FORECAST ACHIEVED INITIAL CRITICALITY 12/19/84 12/22/84 INITIAL ELECTRICITT HID APRIL 65 4/13/85 Cott1ERCIAL OPERATION IST QTR 86 2/01/86
)
I 1
i i,
l l
l l
\\
i l
f I
i i
l I
l i
e AVERAGE DAILY LMIT POWER LEVEL DOCKET NO. 50 - 352 UNIT LIMERICK UNIT 1 DATE APRIL 15. 1986 COMPANY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN I
ENGINEER-IN-CHARGE j
LICENSING SECTION NUCLEAR GENERATION DIVISI0H TELEPHONE (215) 841-5022 l
MONTH MARCH 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (NWE-NET)
(MWE-NET) 1 1062 17 1059 a
2 1057 18 1059 3
1061 19 1021 l
4 1061 20 1059 5
1969 21 1058 l
6 1049 22 1059 7
1064 23 1057 8
1060 24 1064 9
1057 25 1049 10 1054 26 1949 i
i 11 1051 27 1968 12 1022 28 1042 13 1974 29 1050 i
l 14 1049 30 1950 15 1055 31 1055 r
1 16 1090 l
i
..n
.,,..,--,--c.
O UNIT SHUT) OWNS AHD POWED [ EDUCTIONS DOCKET NO. 50 - 352 UNIT NAME LIMERICK UNIT 1
...............==-
DATE APRIL 15, 1986 REPOR1 NONTH MARCH. 1986 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY
.==-==
W.H.ALDEN ENGINEER-IN-CHARGE LICENSING SECTIDH NUCLEAR GENERATION DIVISIDH TELEPHONE (215) 841-5022
........................................................=__ _ --_=..............__......____......................__........
l l
l l
l NETH00 0F l LICENSEE ISYSTENICOMPDHENTl CAUSE AHD CORRECTIVE l
lTYPElDURATIOHlREA50HISHUTTIHG DOWN1 EVENT l CODE l CODE l ACTION TO N0.1 DATE l (111 (HOURS)l (2) l REACTOR (3) l REPORT 8 l (4) l (5) l PREVENT RECURRENCE
,_............__..........__...........................................___.................................... __ -______ - =
l I
l ----- I l
I I
I I
I I
I -
1 I
I I
I I
(1)
(2)
(3)
(4)
F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIDNS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIH) 1 - NAHUAL FOR PREPARATI0H OF DATA B - MAINTENANCE OR TEST 2 - NAHUAL SCRAM.
ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOHATIC SCRAM.
EVENT REPORT (LER)
D - REGULATORY RESTRICTIDH 4 - OTHER (EXPLAIH)
FILE (HUREG-0161)
E - CPERATOR TRAINING + LICENSE EXANINATION F - ADMINISTRATIVE (5)
G - OPERATIDHAL ERROR (EXPLAIN)
H - OTHER(EXPLAIH)
EXHIBIT I - SAME SOURCE
~
e-Docket No. 50-352_j Attachment to Monthly i
Operating Report for March, 1986 i
Limerick Generating Station Unit 1 March 1 through March 31, 1986 I.
Narrative Summary of Operating Experiences 1
j The unit operated at approximately 100% rated power throughout the month of March.
T II.
Challenges to Main Steam Safety Relief Valves I
During this month, there were no challenges to the main steam safety-relief valves.
i
)
I
}
1 L
i J
1 i
I l
i
V*
- 8 PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 PHILADELPHI A. PA.19101 1215)841-4000 April 15, 1986 Docket No. 50-352 Director Of fice of Resource Manageme:!t,
US Nuclear Regulatory Commission Washington, DC 20555
SUBJECT:
Limerick Generating Station Monthly Operating Report Gentlemen:
Enclosed is the monthly operating report for Limerick Unit 1 for the month of March, 1986, forwarded pursuant to Technical Specification 6.9.1.6.
Very truly yours, D
R. H. L'c e
Supelintendent Nuclear Services WMA vdw Attachment cc:
Director, Office of Inspection & Enforcement, USNRC (12 copies)
Dr. T. E. Murley, NRC E.
M. Kelly, Senior Resident Site Inspector Mr. David E. Ney, PA Dept. of Envir. Resources Mr. P.
A.
Ross, NRC (2 copies)
INPO'Rocords Center See Att'ched Service List a
g6 i
. _ _ ~ -
_