I DPERATING DATA REPORT Docket No.:
50-309 Date:
01/Apr/86 Completed By:
Steven L Jacobs Telephone:
207-882-6321 1.
Unit Name.......................................
Maine Yankee 2.
Reporting Period................................
March 1996 3.
Licensed Thermal Power (MWt)....................
2630 4.
Nameplate Rating (Gross MWe)....................
864 5.
Design Electrical Rating (Net MWe)..............
825
- 6. Maximum Dependable Capacity (Gross MWe).........
850
- 7. Maximum Dependable Capacity (Net MWe)...........
810 8.
If Changes in Capacity Ratings (Items Number 3-7)
Since Last Report, Give Reasons:
NO CHANGES
- 9. Power Level to Which Restricted, if Any (Net MWe)
NO RESTRICTIONS
- 10. Reasons for Restrictions, if Any:
THIS MONTH YEAR-TO-DATE CUMULATIVE
- 11. Hours In Reporting Period 744.00 2.160.00
- 12. Number of Hours Reactor Was Critical...........
485.33 1.734.79 94.072.51
- 13. Reactor Reserve Shutdown Hours..................
0.00 0.00 0.00
- 14. Hours Generator On-line..
480.83 1.709.58 91.354.24
- 15. Unit Reserve Shutdown Hours..................
0.00 0.00 0.00
- 16. Gross Thermal Energy Generated (MWH)........
1.173.279.00 4.211.231.00 206.211.912.00
- 17. Gross Electrical Energy Generated (MWH)........
396.680.00 1.416.700.00 67.656.420.00
- 18. Net Electrical Energy Generated (MWH)........
383.807.00 1.369.973.00 64.556.288.00
- 19. Unit Service Factor......
64.63 79.15 77.82
- 20. Unit Availabilty Factor..
64.63 79.15 78.61
- 21. Unit Capacity Factor (Using MDC Net)........
63.69 78.30 69.72
- 22. Unit Capacity Factor (Using DER Net)........
62.53 76.88 67.86
- 23. Unit Forced Outage Rate..
35.37 20.85 7.17
- 24. Shutdowns Scheduled Over Next 6 Months:
NONE
- 25. If Shutdown at End of Report Period, Estimated Date of Startup:
N/A 8606200394 860331 Ed DR ADOCK 0000 9
i
i AVERAGE DAILY UNIT POWER LEVEL FOR MARCH 1986 Docket No.:
50-309 Unit:
Maine Yankee Date:
01/Apr/86 Completed By:
Steven L Jacobs Tel ephone:
207-882-6321 Day Avg. Daily Power Level Day Avg. Daily Power Level (MWe-Net)
(MWe-Net) 1 O
16 857 2
O 17 854 3
O 18 854 4
O 19 854 5
O 20 856 6
O 21 853 7
O 22 855 8
O 23 856 9
O 24 856 10 O
25 854 11 3
26 855 12 217 27 855 13 393 28 855 14 848 29 856 15 854 30 855 31 855 9
d.
UNIT SHUTDOWNS AND POWER REDUCTIDNS Docket No.:
50-309 FOR MARCH 1986 Unit Maine Ytnkee Date:
02/Apr/86 Completed By:
Steven L Jacobs Telephone 207-882-6321 Page:
1 of 1 Number 8-86-9 D2te 860221 Type (1)
F Duration (Hours) 263.2 Rerson (2)
B Method (3) 1 LER #
N/A System Code (4)
HA Component Code (5)
GENERA-D Shutdown to repair hydrogen leakage from Main Generator.
Ccuse and Startup delayed Corrective due to chloride.
Acti on intrusion in
______ _ _.___.-~
tundenser.--
~ ~ ~
This outage is carried over from last month.
c 1.
TYPE:
- 2. REASON: (cont) 4.
SYSTEM CODE:
(F)orced F-Administrative Exhibit G-Instructions (S)cheduled G-Operational Error for Preparation of Data H-Other (Explain)
Entry Sheets for
- 2. REASON
~
Licensee Event Report A-Equipment Failurc
- 3. METHOD:
(LER) File (NUREG.0161)
B-Maintenance or Test 1-Manual C-Refueling 2-Manual Scram 5.
COMPONENT CODE:
D-Regulatory Restriction 3-Automatic Scram Exhibit I-Same source E-Operator Training 3<
4-Other (Explain) as above.
License Examination
]
.-8*
j I
Docket No.:
50-309 Unit Name Maine Yankee Date:
01/Apr/86 Completed By:
J.
M.
Taylor Telephone:
207-882-6321 Report Montha March, 1986 NARRATIVE
SUMMARY
OF OPERATING EXPERIENCES At the beginning of the month, the plant was in hot shutdown while a gnnerator hydrogen leak was being repaired.
Cn March lith, the reactor was made critical, the unit was phased to the grid, and loading commenced.
On March 12th, 30% power was maintained for a boron soak.
On March 13th, loading commenced.
On March 14th, 98.8% power was reached and maintained while the feed flow calorimetric was eval uated.
A limit of 882 MWe was maintained pending generator capability evaluation.
On March 17th, 98.8% power (882 MWe) was maintained while the generator hydrogen gland seal ring rub test and vibrations in the exciter and gunerator were evaluated.
For the remainder of the month, a limit of 802 MWe was maintained due to generator vibration concerns.
-i l
'l
O
\\
I
.e o
MAIRE HARHEE 'ATOMWPOWER00MPARSe
,uaug,ay,?n"g%'s h
(207) 623-3521 e
April 7, 1986 MN-86-52 GDH-86-88 Office of Resource Managerient United States Nuclear Regulatory Commission Hashington, D. C.
20555 Attention:
Mr. Richard A. Hartfield, Chief Management Information Branch
References:
(a) License No. DPR-36 (Docket No. 50-309)
(b) NUREG-0020, Licensed Operating Reactors Status Summary Report
Subject:
Maine Yankee Monthly Statistical Report Gentlemen:
Enclosed you will find the Monthly Statistical Report for the Maine Yankee Atomic Power Station for March, 1986.
l Very truly yours, HAINE YANKEE ATOMIC POWER COMPANY h81/
G. D. Whittier, Manager Nuclear Engineering and Licensing GDH/bjp Enclosure cc: Mr. Ashok C. Thadani Dr. Thomas E. Murley i