Provides Correction of Info Re GL 96-01, Testing of Safety- Related Logic Circuits. Complete Review of 480 Volt Schemes Had Been Conducted Prior to Submittal of & Not Representative Sample as Stated
ML20206D716
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 04/27/1999
From: Vandergrift J
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
1CAN04903, 1CAN4903, GL-96-01, GL-96-1, NUDOCS 9905040219
Download: ML20206D716 (2)


Text

(v y-r" l

i O

Ent2rgy operations,Inc.

g s

(

1448 S R. 333 RussdMio. AR 72801 Td 501858 5000 I

April 27,1999 l

ICAN049903 l

U. S. Nuclear Regulatory Commission D= ment Control Desk Mail Station OP1-17 Washington, DC 20555

.l

Subject:

Arkansas Nuclear One -Unit 1 Docket No. 50-313 License No. DPR-51 Correction ofInformation Concerning Generic Letter 96-01 Close-Out i

Gentlemen-In correspondence dated June 10,1998 (ICAN069805), Arkansas Nuclear One, Unit 1

_ (ANO-1) provided a close-out letter to document completion of the requested actions in Generic Letter 96-01.. " Testing of Safety-Related Logic Circuits." The ANO-1 letter stated in part that, "These reviews were conducted on the 4,160 volt safety-related schemes plus a representative sample of the 480 volt schemes." However, a complete review of the'480 volt schemes had actually been conducted prior to submittal of the June 10,1998 letter, and not a " representative sample" as stated.

Therefore, this letter corrects the previous June 10,1998 letter to indicate that a complete review of the 480 volt schemes was conducted. Should you have any questions, please contact me.

Very truly yours, Q-e

[T D. Vandergri e'

Director, Nuclear Safety JDV/SLP l

'Q O

i-9905040219 990427 7

PDR ADOCK 05000313 i P

PH

r; Attachment to ICAN049903 Page 2 of 2 i

cc:

Mr. Ellis W. Merschoff Regional Administrator U. S. Nuclear Regulatory Commission RegionIV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector i

Arkansas Nuclear One i

P.O. Box 310 London, AR72847 Mr. Nick Hilton NRR Project Manager Region IV/ANO-1 U. S. Nuclear Regulatory Commission NRR Mail Stop 13-H-3 One White Flint North 11555 Rockville Pike Rockville, MD 20852