ML20206D698
| ML20206D698 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 06/16/1986 |
| From: | Maupin M GENERAL PUBLIC UTILITIES CORP., HUNTON & WILLIAMS |
| To: | |
| References | |
| CON-#286-647 LRP, NUDOCS 8606200159 | |
| Download: ML20206D698 (6) | |
Text
r hbk o
h*'.
\\
June 16.01486 f-DCCCTTD OUN191986*-Fir UNITED STATES OF AMERICA 5
y gg%n E $<bt NUCLEAR REGULATORY COMMISSION E CYliHC
'//
Before the Presiding Board q,
In the Matter of
)
)
Docket No. LRP INQUIRY INTO THREE MILE ISLAND
)
UNIT 2 LEAK RATE DATA FALSIFICATION)
COMMENTS OF GARY P. MILLER ON JUNE 6 FILINGS On June 6, 1986, the parties filed objections to or comments on several rulings set out in a Memorandum and Order (Proposed Schedule for Hearings and Rulings Following Second Prehearing Conference), dated May 22, 1986 (the Memorandum _ and Order).
Mr. Miller wishes to comment only on the Response of Employees to Memorandum and Order of May 22, 1986 (the Response), and only with respect to one request for reconsideration made in the Response.
On page 8 of the Memorandum and Order, the Presiding Board excluded from the record i.n this case U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation, TMI-1 Restart:
An Evaluation of 8606200159 860616 PDR ADOCK 05000320 0
6.
the Licensee's Management Integrity As it Affects Restart of Three Mile Island Nuclear Station Unit 1 Docket 50-289 (July 1984) (NUREG-0680 Supp. No. 5.)
SS 4.0, 5.1, 5.2 and 13.2 (referred to herein as Supp. 5).
The exclusion, however, was "without prejudice to the right of the Employees to urge consideration of Unit 1 leak rate matters (including section 13.2), as discussed in Section 4 of NUREG-0680 Supp. No. 5 by June 6, 1986, now that the NRR Report is available."
Memorandum and Order at 8.
In the Response, Employees urge the Presiding Board to reconsider its ruling with respect to Supp. 5.
In support of its request, Employees rely entirely on the argument that "it is important to know the history of leak rate testing at TMI-l in order to evaluate allegations of misconduct in connection with leak rate testing at TMI-2."
Response at 3.
Mr. Miller would understand, then, that Employees no longer seek to have included in the record S 13.2 of supp. 5, because S 13.2 does not deal with the history of leak rate testing at TMI Unit 1.
Similarly, Mr.
Miller would understand that Employees no longer seek to have SS 5.1 and 5.2 of Supp. 5 included, because
, o neither of those sections deals with the history of leak rate testing at TMI Unit 1.
The remaining section of Supp. 5 excluded by the Presiding Board is S 4.0.
Section 4.0 does deal with the history of leak rate testing at TMI Unit 1, and so its inclusion in the record would presumably satisfy the request made by Employees in their Response.
Mr.
Miller does not object to the inclusion of S 4.0 of Supp. 5 in the record.
Mr. Miller continues to object to the inclusion of SS 5.1, 5.2 or 13.2 of Supp. 5 in the record of this proceeding.
Respectfully submitted, GARY P. MILLER By Michael W.
Maupin, Counsel Of Counsel Michael W. Maupin Maria C. Hensley Hunton & Williams P.O. Box 1535 Richmond, Virginia 23212 Dated:
June 16, 1986
June
,f4S$6D 9
%J g
UNITED STATES OF AMERICA E
k j gJgg g 7 NUCLEAR REGULATORY COMMISSION2 Before the Presiding Board D
.g d'
In the Matter of
)
'N N
/
) D0eket Nod INQUIRY INTO THREE MILE. ISLAND
)
UNIT 2 LEAK RATE DATA FALSIFICATION)
CERTIFICATE OF SERVICE I certify that copies of the Comments of Gary P.
Miller on June 6 Filings, dated June 16, 1986, were served upon the following persons today by deposit in the U.S. Mail, first class, postage prepaid, addressed to them at the places listed below:
Secretary U.S. Nuclear Regulatory Commission Washington, D.C.
20555 ATTENTION:
Chief, Docketing and' Service Section Administrative Judge James L.
- Kelley, Chairman Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, D.C. 20555
e '
E Administrative Judge Glenn O. Bright Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Administrative Judge Jerry R. Kline Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Ernest L. Blake, Jr., Esq.
Shaw, Pittman, Potts & Trowbridge 1800 M Street, N.W.
Washington, D.C.
20036 Jack R.
Goldberg, Esq.
Office of the Executive Legal Director U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Harry H. Voigt, Esq.
LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, N.W.
Suite 1100 Washington, D.C.
20036 Smith B. Gephart, Esq.
Killian & Gephart 216-218 Pine Street P.O. Box 886 Harrisburg, Pennsylvania 17108 James B.
Burns, Esq.
Isham, Lincoln & Beale 3 First National Plaza Suite 5200 Chicago, Illinois 60602
a Ms. Marjorie M. Aamodt Mr. Norman O. Aamodt Box 652 Lake Placid, New York 12946 Ms. Marjorie M. Aamodt Mr. Norman O. Aamodt 200 North Church Street Parkesburg, Pennsylvania 19365 Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, D.C.
20555 l
( h) l}L. int -
Michael W. Maupin, Counsel for Gary P. Miller Dated:
June 16, 1986 e
a j
..