Responds to 880927 Request for Review & Comment of R Mancini Rept.Nrc Reviewed Rept & Concludes That No New Safety Concerns Known or Not Being Adequately Addressed by Licensee Improvement Program.Util Committed to Correct Deficiencies
ML20206D530
Person / Time
Site: Fermi 
Issue date: 11/10/1988
From: Zech L
NRC COMMISSION (OCM)
To: Dingell J
HOUSE OF REP., ENERGY & COMMERCE
Shared Package
ML20206D534 List:
References
NUDOCS 8811170122
Download: ML20206D530 (4)


Text

Distribution:

Docket File

.[

UNITED STATES GHolahan C

N NUCLEAR REGULATORY COMMISSION MIF9III0 8

!l

{

i W ASHINGTON, D. C. 20555

[

t,+.....

NRC & Local PORs November 10, 1988 VStello 4

CHAIRMAN ED0 3989 JStang RIngram DCrutchfield DMossburg The Honorable John D. Dingell, Chairman PDIII-1 Committee on Energy and Commerce MKrebs r

United States House of Representatives OGC Washington, D.C.

20515

]

Dear Mr. Chairman:

t I am responding to your letter dated September 27, 1980, in which you requested that the U.S. Nuclear Regulatory Commission (NRC) review and comment on a report you had received from the Honorable Remo Mancini, a member of the Ontario Provincial Parliament.

The i

l NRC staff has reviewed the report and has concluded that there are

~

staff or are not being adequately addressed by the licensee's no new safety concerns which were not previously known to the i

improvement program.

Detroit Edison has committed to NRC tu implement programs to correct operational deficiencies, and NRC is closely following the licensee's progress in meeting these commitments.

Recent monitoring has shown inproved operational performance.

A recent NRC Systematic Assessment of Licensee Performance (SALP) i determined that Fermi-2 was being operated safely.

However, because of past weak performance in a number of key areas, the NRC has designated Fermi-2 as a plant that warrants increased NRC attention.

NRC actions have included reducing the period of time between SALP reviews (from 12 months to 9 months); assigning another part-time resident inspector to assist the two currently l

assigned to Fermi-2; and conducting a number of planned inspection l

activities in problem areas, including a special diagnostic evaluation team inspection (OETI) to gain a better understanding of the reasons for the facility's weak perfornance.

The DETI l

results will soon be made publicly available.

Because we have been aware of Canadian concernt for some time and have met with Canadian officials on a number of occasions to discuss Fermi-2, i

the NRC has offered to brief Canadian officials on the results of 4

the inspection.

In addition, on July 25, 1988, senior NRC l

managers met with the Chairraan of the Board of Detroit Edison i

Company and board members Nith nuclear oversight responsibility to

(

reiterate to Detroit Edison Company the need for improvements in plant performance.

Originated: NRR: Ingram 8011170t M GS!!!O POR COMMS NRCC 3

CORRESPONDENCE pdc

)

l L

1

. By letter dated September 22, 1988, the Deputy Assistant Secretary of State for Nuclear Energy and Energy Technology Affairs, Mr. Richard Stratford, in responding to Mr. Mancini's letter concerning the same report, indicated that the United States will continue to regulate operation of Fermi-2 to ensure that the health and safety of the public are adequately protected.

s I hope our comments will be helpful to you and the Committee on Energy and Commerce.

If I or the Com91ssion can be of further assistance, please do not hesitate to let me know.

J i

Sincerely, f

i k&N.

I Lando W.

Z h,J.

i i

i-cc:

Rep. Norman F. Lent l

I i

I I

I l

2 l

l 4

l f

I r

i l

1 I

i i.,.--,,,,..-....,,,,.--_,

~

y

foa ag'%j UNITED STATES NUCLEAR HEGULATORY COMMISSION

[_

q WASHINGTON, D. C. 20655 EDO Princioal Correspondence Control i

FROM:

DUE: 10/13/08 EDO CONTROL: 0003989 DOC DT 09/27/88 FINAL REPLY REP. JOHN D. DINGELL TO:

CHAIRMAN ZECH FCR SIGNATURE OF:

    • PRI CRC NO: 88-0870 CHAIRMAN ZECH DESC:

ROUTING:

j REQUEST REVIEW OF REPORT SUBMITTED BY THE STELLO HONORABLE REMO MANCINI, ONTARIO PROVINCIAL TAYLOR PARLIAMENT, CANADA, CONCERNING FERMI !!

HOYLE DAVIS, RI!!

DAl d 10/03/08 OGC GPA ASSIGNED TO:

CONTACT:

NRR MURLEY SPECIAL INSTRUCTIONS OR REMARKS:

j

.I NRR RECEIVED: OCTOBER 3, 1988 ACTION:

.DABr HOLAMAN

%,x NRR ROUTING:

MISLEY/LNIEZEK CRUICHFIELD w/o enc 1.

MIRAGLIA GILI.ESPIE MOSSBURG l

OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET PAPER NUMBER:

CRC-88-0870 LOGGING DATE: Sep 30 88 ACTION OFFICE:

EDO AUTHOR:

J.D. Dingell AFFILIATION:

U.S. HOUSE OF REPRESENTATIVES LETTER DATE:

Sep 27 88 FILE CODE: ID&R-5 Fermi II

SUBJECT:

Raq Commission review and comment to a report on allegations made concerning threats to public health at Detroit Edison's Fermi II nuc power plant ACTION:

Signature of Chairman DISTRIBUTION:

OCA to Ack, Cmrs, Docket, RF SPECIAL HANDLING: None NOTES:

DATE DUE:

Oct 17 88 SIGNATURE:

DATE SIGNED:

AFFILIATION:

M Off. ID0 DMs /Q-3-Pt Flms_ '7.' 3d g,