Text
GeJg a Fbwei C<rrceny Fbst o"C Bon 282
- Waynesboro, Georg a 30830
=
Teiephone 404 $$4 9w31 404 724 8114
$%thern Cortpany SercCeS. Inc Fbst Ottco Box 2625 8 rm.ngham. kaba+4 35202 w ~ exsom e, Vogtle Project November 9, 1989 U. S. Nuclear Regulatory Cornission Files X7N00.0-39 Attn.: Document Control Desk X7BC35 Washington, D.C. 20555 Logi GN-1507 NRC DCCKET NUMBERS 50-424 WD 50-425 OPERATING LICENSE NPF-69 CONSTRUCTION PERMIT NUMBER CPPR-109 V0GTLE ELECTRIC GENERATINO PIAVT UNITS 1 AND 2 REQUEST FOR ADDITIONAL INFORMATION FSAR AMEND 4ENT NUMBER 35 Gentlement Attached are additionst information responses and FSAR changes as requested in Mr. Jon B. Hopkins' letter of October 3,1988.
Each response is numberet to corresponi with the requests of the enclosure of his letter. These chsngee ani responses were discussed in a recent telephone conference with Mr. Spraul. The chsnges, as indicated on the inarked psges, are scheiuled to be incluied in FSAR Ameniment 39 If alittionst inforrastion is reqairei, please do not hesitate to contset ree.
.ineerely, 9 4 d' J. A. Bailey Project Licensing Manager JAB /s=
xet NRC Rt,gional A411ntstrator G. Bo:khold, Jr.
NRC Resident Inspector C. W.Ilayes J. B. Hopkins (2)
J. P. Kane B. V. Churchill, Esquira R. V. McMsnus R. J. Codiar d, Esquire T. T. Unhin,.fr.
J. E. Joiner, Esquire R. A. Ihossa P. D. Rice Vogtle Project File 1632V N
S 8811170033 891107 FDR ADOCK O'J000424 F
F'DC
p r
V ATTACHMENT Response To Request for Additional Information Vogtle FSAR Amendment 35
[
1.
The description of the Quality Control Superintendent in paragraph 17.2.1.2.3 should hav-been deleted in Asendment 26 to the FSAR concurrently with the change to paragraph 17.2.1.2 which now refers to Chapter 13 for the description of the plant staff.
Amendment 35 did
[
temove the description of the reporting relationship from 17.2.10 to be consistent wi'h paragraph 17.2.1.2.
The Quality control Superintendent it discuased in paragraph 13.1.2.2.1 B and Q and
[
depicted on Figure 13.1.2-1 sheets 1 c.
5 and 4 of 5.
2 & 3.
During the operational phase SCS is the architect / engineer for VEGP.
The Plant Vogtle Operational Support Policy and Procedures Manual establishes uniform practices and establishes quality assu tance objectives for services provided by SCS in sup ert of GPC's operation of Plant Vogtle. BPC is under contract to SCS co provide architect / engineering services to SCS during operating phase of the VEGP (Re f. 17. 2.1.4).
Section 17.2.1.4 Engineering will be revised to add the following clarifying statement as indicated on the attached mark up.
"These activities, as well as architect / engineering activities perfc tmed by others under contract to SCS, will meet the requirements of the OQAP."
4.
SCS is the architect / engineer for VEGP during operation.
Section 17.2.1.4 Engineering will be revised to add the following I
clarifying statement as indicated on the attached markup.
"After l
commercial operation of Unit 2, SCS assumes responsibility as i
architest/ engineer for both units."
5.
The SCS PQAE still receives "functional and administrative supervision" from the SCS quality assurance departient as defined in 4
paragraph 17C.1.2.1.1 (previously paragraph 17.1. '. 4).
The manager-quality assurance provides support to the PQAE through 4
development and implementation of the quality assurance department procedures which are utilized by the PQAE in perfotmance of his r
specific duties and responsibilities. The suppliar surveillance l
administrator no longer reports to the manager-quality assurance. The l
SSA now receives "functional and administrative direction from the manager procurement-engineered products" (ref.17C.1.3.1).
Project coordination of the SSA comes from the PQAE. These new reporting r
relationships are depicted in Figure 170-1.
[
f i
i l
m -
y,_._
~
6.
The positions of the manager project and supplier and the supervisor-projects were eliminated in the recrganization of the SCS QA department.
The changes in Amendment 35 were to show the PQAE reporting directly to the manager quality tssurance in lieu of reporting through two other intermediate levels of supervision.
The manager-quality assurance assumed the responsibilities of (1) "development and implementation" of quality assurance department procedures (Ref.17.C.1.2.1) and (2) ' functional and administrative supervision" of the PQAE (Ref. 17C.1.2.1.1).
7.
By approving annual evaluations, surveillance scope changes and surveillance reports sent to him by the SSA (Ref. 17C.1.13A, C, F),
the PQAE determines when audits and changes to the surveillance scope are needed.
Section 1.7C.1.2.1.1 Project Quality Assurance Engineer (PQAE) will be revised for clarification as indicated on the attached mark-up to state as follows:
"The PQAE ensures, through the SCS audit program, the verification of implementation of Vogtle Project supplier quality 3
activities. The PQAE controls the scope of these supplier quality 1
activities by approval of the annual evalustion of suppliers' quality p.N program performance and by approval of changes in the supplier F
~,
surveillance program.
Auditing of engineering is also the responsibility of the PQAE. The PQAE receives project direction from..."
3.
The audits of Bechtel's procurement supplier quality department continue to be conducted on at least a triennial basis as indicated by i
the paragraph 17C.2 commitment to NRC Regulatory Guide 1.144, Audit ing of QA Programs for Nuclear Power Plants (January 1979).
Section 17C.5 Quality Assurance Auditing, fourth paragraph, will h; revised for clarification as indicated on the attached mark-up to state as follows:
"The VEGP activities of Bechtel's procurement supp1' _r qutlity department are evaluated annually by the PQAE and audited as required (at least triennially) by the SCS supplier surveillance administrator."
9 The SSA continues to receive Project coorlination from the PQAE as before (Ref.17C.1.3.1).
The dutfes and responsibilities of the SSA are still under the FCS Quality Assurance Manr.al for Nuclear Projects sithough the implementing procedures are now contained in the I
Engineering ani Project Services Department Policy and trocedures Manual (Ref 17C.2.).
All SCS supplier quality personv4 performing supplier audits are trained, qualif ted, ani certified Q the SCS QA Department.
S ec t iot - 17C.5 Quality Assurance Auditing will be revio 1 e add the following clarifying statement as indicated on the at ' t ahe? msrk-up.
"The activities of SCS procurement-engineered products' n csonne L :
auditel by SCS quality assurance to verify implementation of the requirements of the SCS Quality Assurtnce Manual for Nuclear Projects.
1632V
f VEGP-FSAR-17
\\3O EmA 17.2.1.4 Engineering 4'
The GPC nuclear operations services department has UV.dall 5
responsibility for assuring the availability of and providing or k N y
securing adequate engineering and technical support for the h
4 VEGP.
The nuclear operations manager of engineering, y
maintenance and outage planning serves as the principal ggg g
interface between the GPC nuclear operations department and the w
vi g
GPC engineering and construction services department, and/or SCS N
(
for coordination and direction of engineering and technical support provided to the VEGP.
(
U-SCS is the architect / engineer for VEGP during operation.
In 2
- g. N addition to providing design engineering / modification support k
~
V as Q
requested, SCS provides quality assurance support, including N$
audits, supplier qualification and surveillances, and engineering procedure reviews.
SCS.timo administers for VEGP the contract for engineering services provided by BEPC and l
selected engineering services provided by Westinghouse.
t k
Activities within the SCS work scope are governed by the Plant Vogtle Operational Support Policy and Procedures Manual.+ The GPC GMQA performs or causes to be performed audits of these functions.
4 h
BEPC is under contract to SCS s provide architect / engineering services.
The work scope inclucas plant design, development of purchase recommendations for equipment and materials, administration of purchase orders resulting from SCS-developed 4
s D
purchase recommendations and support of the SCS supplier i
k surveillance functions by providing procurement surveillance services for selected items.
BEPC maintains technical i
engineering oversight of VEGP Unit 1 until VEGP Unit 2 achieves commercial operation.
This oversight consists of the following:
Approving new and revised design criteria.
e Performing /providing technical audits and technical o
standards, and Performing selected technical reviews / consultations.
l e
17.2.1.5 Vogtle Project The general manager-Vogtle nuclear operations is responsible for implementation of the OQAP while remairing construction activities at operating VEGP units are being performed.
0379V Amend. 8 7/84 Amend. 16 4/85 Amend. 26 10/86 17,2,1-10 Amend. 35 3/88
VECP-FSAR-17C 17C.l.2.1.1 Project Quality Assurance Engineer (POAE)
I l
The PQAs ensures, through the SCS audit program, the VErancer/mves implementation of the Vogtle Project supplier curycillance 2n:pect:0ntactivities.c.nd 2uditing af cngincci;ng.
.Sc ope o p *T*HES E
^dditioni. % The PQAE controls the implement:tien-of4 supplier k
quality activities by approval of the annup/ approval of changes
~
i evaluaticas of suppliers' quality program performance and g
in the cc;pc of supplier surveillancet t The PQAE receives project direction from and is accountable to the Vogtle quality q)t assurance manager (VQAM) for the performance of assigned activities and to the SCS manager-quality assurance for qI functional and administrative supervision.
The PQAE receives g
project coordination from the Vogtle project engineering 0-manager.
The PQAE has authority from the VQAM to stop, in a Q
)
g timely manner, work which is not in compliance with sp'ecifications or procedures, kw Speciffc duties and responsibilities of the PQAE include:
A.
Verify through audits of Bechtel that VEGP engineering
)
contractors and suppliers have developed and implemented acceptable quality assurance programs.
3.
Ensure through audits the adequacy of the VEGP supplier quality surveillance program activities.
Amend. 18 8/85 Amend. 33 5/87 17C-3 Amend. 35 3/88
4 4
VEGP-FSAR-17C 4
4 t y Audits are conducted when a need is in:11cated as a result of g g quality assurance program surveillance or when a periodic g
quality assurance program audit indicates that it would be appropriate.
These audits are conducted annually as a minimum.
The POAE develops audits agendas, leads the audits of Bechtel,
}
and prepares the audit reports.
The audit agenda is approved by
)
g the VQAM.
The PQAE may be assisted in the conduct of the audits ggQ by other SCS quality assurance department personnel.
The VQAM
(( q p
may act as an observer at these audits.
\\
The VEGP activities of Jechtel's procurement supplier quality g
department are evaluated annually by the PQAE and audited as l
g required by the SCS supplier surveillance administrator.
3 g
I--( AT LcAsrTcisoALLyj The Bechtel PQAE takes the lead in conducting audits of h
g Westinghouse and V-SAMU.
The VQAM and PQAE may accompany the u
Bechtel PQAE on these audits.
These audits are conducted k
annually as a minimum.
%n 4b Periodic audits of suppliers and contractors performing Q-list yD work subject to quality surveillance are conducted on at least a 0g triennial basis for contractors performing continuing work on Ng GPC purchase orders or contracts or at least once during g
performance on single or multiple purchase orders and contracts y
having a limited duration.
During the period between triennial y
audits, annual evaluations will be made by the SSA to assess supplier quality program performance and determine whether a I%
sup;'emental audit is needed, b
$g>fThePQAEreviewsandapprovestheannualevaluationsmadebythe h
s SSA to assess supplier quality program performance and determine whether a supplemental supplier audit is required.
Bechtel or SCS procurement-engineered products conducts audits l
4 4 of selected suppliers of safety-related components and materials i
for VEGP, except for certain construction materials if procured directly by GPC.
SCS and CPC quality assurance personnel selectively participate in these audits.
17C.6 SUPPLIER SURVEILLANCE Bechtel project engineering develops a r'ecommended scope of quality surveillance services for equipment for approval by the PQAE.
The scope of procurement supplier quality services approv;d by the FQAE la identified in the supplier quality 6
activity log.
Amend. 18 9/85
.' 7 C - 6 Amend. 35 3/88