Ltr Contract:Task Order 5 to Mod 5 Entitled, Subcooled Boiling at Low Pressure, Under Contract NRC-04-97-046
ML20206C578
Person / Time
Issue date: 04/22/1999
From: Pool S
NRC OFFICE OF ADMINISTRATION (ADM)
To: Doland E
PURDUE UNIV., WEST LAFAYETTE, IN
References
CON-FIN-W-6749, CON-NRC-04-97-046, CON-NRC-4-97-46 NUDOCS 9905030077
Download: ML20206C578 (3)


Text

.- %

D C[)

n cag p 'k UNITED STATES g j NUCLEAR REGULATORY COMMISSION o,  ! WASHINGTON, D.c. 20066 4 001 o

~ . APlf 0$ gg

'% * * * * + s Purdue Research Foundation ATTN: Edie Doland 1063 Hovde Hall, Purdue University West Lafayette, IN 47907-1063

Dear Mr. Rodriguez:

SUBJECT:

TASK ORDER NO. 5 MODIFICATION NO. 5 ENTITLED "SUBCOOLED BOILING AT LOW PRESSURE" UNDER CONTRACT NO. NRC-04-97-046 in accordance with Section G.4, Task Order Procedures, of the subject contract, this letter definitizes Task Order No. 5 Modification No. 5. This effort shall be performed in accordance with the enclosed Statement of Work.

The period of performance for this task order remains January 14,1998 through November 30, 1999. The total estimated coct for full perform &nce of this task order is increased by $34,250 from $266,960 to $301,210. $30,000 in incremental funding is hereby allotted to Task Order No.

5. This action changes the total cumulative funds obligated for performance of this task order from $266,960 to $296,960. The Contractor shall not incur costs for this task order which exceed the cumulative obligated amount of $296,960. All other terms and conditions of Task Order No. 5 remain unchanged.

Accounting data for Task Order No. 5 Modification No. 5 is as follows:

B&R No.: 960-15-11-010-5 Job Code: W-6749 BOC Code: 252A RES ID: RES-C99-395 Appropriation No.: 31X0200 Obligated Amount This Action: $30,000 FY 98 Obligated Amount: $151,960 FY 99 Obligated Amount: $145,000 Total Cumulaiive Obligations:$296,960 m

V 1

9905030077 PDR 990422 CONTR \

NRC-04-97-04s pop

. s .

, Purdue Contract No. NRC-04-97-046 Task Order No. 5 Mod 5 Page 2 of 2 The issuance of this task order does not amend any terms or conditions of the subject contract.

Your contacts during the course of this task order are:

Technical Matters: Jennifer Uhle, Project Officer (301) 415-6023 Contractual Matters: Stephen Pool, Contract Specialist (301) 415-8168 i

Please indicate your acceptance of this task order by having an official, authorized to bind your organization, execute three copies of this document in the space provided and return two copies to the Contract Speciahet, You should retain the third copy for your records. -

Sincerely, 1

//

n hf, Ateph n M. Pool, Co trac ng Officer Contract Management Branch No.1 Division of Contracts and Property Management

Enclosure:

As stated ACCEPTED: TASK ORDER NO. 5 Mod 5

~ '

APR 2 21999 NAME DATE Peter E. Dunn W inas Prealdent for Rese8Feb TITLE -

I

>r

^

.. )

.. 1 Modification to Task Order #5, 'Subcooled Boiling at Low Pressure" Contract # NRC-04-97-046, Job Code W6749, " Thermal-Hydraulic Research" Additional Work Requirements The contractor shall design and build a 3x3 rod bundle in lieu of the proposed 2x2 rod bundle as authorizcd in Subtask 5.2. This modification does not increase the level of effort of the Task Order.

Task 5: Rod Bundle Geometry Subtask 5.2: Design A 3x3 rod bundle shall be designed and constructed. This geometry and any modifications made to the facility design shall be documented as additions to the letter report of Subtask 4.2 (Experimental Design) and submitted to NRC in both text and electronic format.