Forwards Safety Evaluation Supporting Util 850416 Request for Deletion of Constraint of 20-ft Square of Modified Penetrations Between Reactor & Auxiliary/Fuel Handling Bldgs.Expanding of Limit to 40-ft Square Acceptable
ML20206B403
Person / Time
Site: Crane Constellation icon.png
Issue date: 04/03/1987
From: Travers W
Office of Nuclear Reactor Regulation
To: Standerfer F
GENERAL PUBLIC UTILITIES CORP.
Shared Package
ML20206B407 List:
References
CON-NRC-TMI-87-012, CON-NRC-TMI-87-12 NUDOCS 8704090139
Download: ML20206B403 (1)


Text

s S.

."4 1.j, DISTRIBUTION:

3 DN 50-320 f

Local PDR NRC PDR-

?

DCS W*I FMiraglia NRC/TMI 87-012 WDTravers April 3, 1987 MTMasnik wM LChandler

~

Docket No.,0-32 JAThomas LHThonus

'l Mr. F. R. Standerfer CCowgill

-Vice President / Director, THI-2 TMoslak 4

. GPU Kuclear Corporation I&E lb

'P. O. Box 480 ACRS 1

Middistown,PA 17057 4

M-Town Office

Dear Mr. Standerfer:

Subject:

Seismic Design Criteria for Modified Containment Penetrations Y

The NRC staff has reviewed your request (reference 1) for deletion of the constraint of 20 ft.2 of modified penetrations between the reactor building i

and auxiliary / fuel handling buildings given in our November 5,1984 letter M

(reference 4). In our previous analyses the penetrations to the auxiliary and

,3 fuel handling buildings were not the limiting case. As discussed in the enclosure, if a total of 40 ft.2 of these penetrations were modified the offsite dose consequences of the modeled accident would remain a small portion E

of the limits in 10 CFR 100.

Thus the staff concurs with expanding the limit to 40 ft.a, Any additional modifications for which the potential offsite dose consequences

+

could be estimated to exceed a small portion of the 10 CFR 100 limits (references 5 and 6), however, will be evaluated on a case by case basis 3

(reference 2). -The staff will consider the nature of the modification, the

,o duration of the modification, and any restriction of activities while the-modificaticn is in place in addition to the potential offsite dose consequences.

s Sincerely, once4AL spS E 7

venom o. Travas William D. Travers, Director TMI-2 Cleanup Project Directorate

Enclosure:

As stated cc:

T. F. Deceitt e7o4o90139 8704o3 R. E. Rogan PDR ADOCK 05000320 S. Levin P

PDR J. E. Frew J. J. Byrne A. W. Miller Service Distribution List (seeattached)

= = > TMICPD TMI P.

TyC_

g

!! """" LThonus:jes JTh s

W@e f

4l l

AI.h8l A!N.8l...

NXC FORM 318 (10 80) NRCM 0240 OFFICIAL RECORD COPY

_