DISTRIBUTION cDocket File WM-64 PDR/DCS-DBangart, RIV WM-64/TT0/86/05/29/1 T01sen RBrich HRose M 04 M PGarcia EHawkins LLW Branch, WMLU URF0 r/f URF0:TTO Docket No. WM-64 040WM64805E 040WM64808E John G. Themelis, Project Manager Uranium Mill Tailings Project Office U.S. Department of Energy Albuquerque Operations Office P.O. Box 5400 Albuquerque, New Mexico 87115
Dear Mr. Themelis:
...._ ;... In accordance.with-your request, we have. completed the-review of the -- ~~ ---- -
m..
comunication of May 7,1986, relating to Response to Comments on Final RAP, Lakeview Site." We have also completed review of " Subcontract Document - Addendum No. 3," dated April 30r 1986. ~ ~ ---
~~
The responses, accompanying maps, and the subcontract document are acceptable with one exception to each submittal. Both submittals refer 3
to interim stabilization during seasonal shutdown. After several discussions between our staffs and contractors, a proposed revision was telecopied to our office on May 27, 1986. This revision is acceptable and will require that each of the previous submittals be changed (see copy of the telecopy attached as an enclosure). This new wording will be incorporated into the Remedial Action Inspection Plan for the Lakeview site. Accordingly, the May 7, 1986 submittal is acceptable with the exception of "3.2 Excavation, Part A.2.b" and the April 30, 1986 submittal is acceptable with the exception of "3.8 Excavation, Part B GENERAL:, 2b."
0FC :
NAME :
l.----:--..........:......--..--:------------:----.-------:-----.------:---------.--:---------.-
DATE :86/06/04 860619008o e60604 PDR WASTE WM-64 PDR
~
WM-64/TT0/86/05/29/1 JUN 0 41986 If you have any questions, please contact Tom Olsen at FTS 776-2813 or me.
Sincerely, C rig). vel yg m.i 7.y U w J 2. nr.s u :,.3 Edward F. Hawkins, Chief Licensing Branch 2 Uranium Recovery Field Office Region IV
Enclosure:
As stated e
cc:
J. R. Oldham, M-K F. R. Hiera, State of Oregon 5
I i
i 0FC
..... {
A.
A.:b* 1RF,0,
,,,,,,,,,,,,,;,,,,,,,,,,,,;,,,,,,,,,,,,{..........;,,,,,,,,,,,
NAML[ J.fUl/.l.V... :.EKa.wk,1 n_s,.. j,,,,,,,,,,,, j,,,,,,,,,,,, ',,,,,,,,,,,, j,,,,,,,,,,,, j,,,,,,,,,,,
DATE :86/06/04
MRY 27 '86 11:59 MK-FERGUSON COMPANY P01 PLEASE DELIVER THE FOLLOWING PAGES To:
NAME:
%a o 2So Al 6584C d/EFO LOCATION:
TELECOPY WUMBER: 30D EDd -O23 8 FROM:
Doed Et> W w Q V _t JP/du,c>v u,ov<n A. N '
' b b. '.
LOCATION:
TOTAL NUMBER OF PAGES:_
/
(NOT INCLUDING THIS COVER LETTER)
Sh #d DATE:
TIME:
/84 7 i
3 3
EACH PLEASE PICK UP THE TELEPHONE AFTER PACE IS TRANSMITTED.
THE LAST IF YOU DO NOT RECEIVE ALL THE PAGES. PLEASE CALL BACK AS SOON AS POSSIBLE.
AREA CODE 505-766-8 2 s /
MORRISON-KNUDSEN COMPANY INC., ALBUQUERQUE, NM TELECOPIER USER:
cDMsr t/ w % v g)
WE HME A 3-M AUTOMATIC TELECOPIER: AREA CODE 505-766-3318.
ew S
MAY 27 '86 12300 MK-FERGUSON COMPANY P02 W9.A.M t.Muu.t.$UN C.OMPANY
~
6.3.7 Seasonal Shutdowns During the periods of time when work is interrupted for seasonal shutdowns, the exposed surfaces of the tailings material will be stabilized in a manner to prevent any offsite spread of contamination.
During this period, surveillances shall be performed at least,once a week to assure that the integrity of the method of stabilization is maintained.
Prior to commencing work following the shutdown, a radiolo6 cal survey shall be performed on all areas 1
which may have-been subject to conta'mination'as'a~ ~
result of the method of stabilization.
7.0 Records
..... n.... 7.1-. Jast.'and. inspection records sha11-be reported-the 'arame-day 'in'
.u.
m.
... _..which.adest. oa.' Inspection.is -performed e- -The inspection"and test i
status shall be identified by charts, as-builts, or by periodic status reports. The status will at all times be available in order to prevent inadvertently by-passing an~i~nspection point.'
~
7.2 Test and inspection records shall contain as a minimum the following:
7.2.1 Items tested or inspected.
j 1
7.2.2 Date of test or inspection.
l 7.2.3 Tester, inspector or data recorder.
7.2.4 Type of test or inspection.
7.2.5 Results and acceptability, including the test or inspection acceptance criteria.
7.2.6 Instrument. number used in performins the test or il 1
inspection.
7.2.7 Action taken in connection with any deviations noted.
l l
1.2.8 Person evaluating test results, if different than
[
person named in paragraph 7.2.3 7.3 Test and inspection records shall be filed and maintained in accordance with "0 APP-6. Quality Assurance Recorde Control".
N A
[7 Pg. C Ln wo 4
RAIP NO. g l AtV.NO.g REMEDIAL ACTION INSPECTION PLAN
, y,,,,
6 of 6
g MAY 27 '86 11:59 MK-FERGUSON COMPANY P01 PLEASE DELIVER THE FOLLOWING PAGES To:
MAME:
%a O AS& AJ LOCATION:
USNAC MR,FO TELECOPY NUMBER: 30D E3$ ~E 23 8 FROM:
dom - du W w'GV.I
~
LOCATION:
y :....*. *, X
~
N/dvav,-av< > A/.N -
f TOTAL NUMBER OF.PAGES:_
/
(NOT INCLUDING THIS COVER LETTER) i DATE:
5 Md TIME:
,/./'4 7 f
g EACH I
PLEASE PICK UP THE TELEPHONE AFTER PAGE IS TRANSMITTED.
{
THE LAST IF YOU DO NOT RECEIVE ALL THE PAGES, PLEASE CALL BACK AS SOON AS POSSIBLE.
AREA CODE 505-766-8 2 ' /
MORRISDN-KNUDSEN COMPANY INC., ALBUQUERQUE, MN TELECOPIER USEK:
(NMir un %vy1 WE HAVE A 3-M AUTOMATIC TELECOPIER: AREA CODE 505-766-3318.
b
MAY. 27 '86 12:00 MK-FERGUSON COMPANY P02 W9.A.Ee,.t..MUUt. SUN COMPANY
- t. -
6.3.7 Seasonal Shutdowns During the periods of time when work is interrupted for seasonal shutdowns, the exposed surfaces of the tailings material will be stabilized in a manner to prevent any offsite spread of contamination.
During this period, surveillances shall be performed at least once a week to assure that the integrity of the method of stabilization is maintained.
Prior to commencing work following the shutdown, a radie %gical survey shall be performed on'all areas which may have been subject to containination' as a'.. ' i.'
~ "iesult of'tiis method of stabilization.
7.0 Records
.,.li.1
. Test and. inspection reeords shal-1 be-reported
- the same -day;rix'" ' '
.a....,
.....li
.~ which_a.testior inspection is-performed. M e inspection'and' test "
m....
status shall be identified by charts, as-builts or by periodic
~
status reports. The status will at all. times be available in
,-order to prevent-inadvertently by-passing an' inspection point.
7.2 Test and inspection records shall contain as a minimum the following:
7.2.1 Items tested or inspected.
7.2.2 Date of test or inspection.
7.2.3 Tester, inspector or data recorder.
7.2.4 Type of. test or inspection.
7.2.51
,[itesults and acceptability, including the test or
-inspection acceptance criteria.
7.2.6 Instrument nt mber used in performing the test or l
' inspection.
7.2.7
' Action taken in connection with any deviations noted.
/,~ -
t 7.2.8 Person evaluating test results, if different than person named in paragraph 7.2.3 I
7.3 Test and inspection records shall be filed and maintained in
=accordance with "0 APP-6. Quality Assurance Records Control".
Afff b h. m u rp l
l RAIP NO. g l AEv..NO g A
REMEDIAL ACTION INSPECTION PLAN j
,,c,,,,
6 of 6
-