ML20206B186
From kanterella
Jump to navigation
Jump to search
ML20206B186 | |
Person / Time | |
---|---|
Site: | Millstone |
Issue date: | 04/22/1999 |
From: | Dicus G NRC COMMISSION (OCM) |
To: | Vietticook A NRC OFFICE OF THE SECRETARY (SECY) |
Shared Package | |
ML20206B174 | List: |
References | |
SECY-99-109-C, NUDOCS 9904290177 | |
Download: ML20206B186 (1) | |
Similar Documents at Millstone | |
---|---|
Category:ARCHIVE RECORDS
MONTHYEARML20217D3871999-10-13013 October 1999
[Table view]Commission Voting Record on SECY-99-223 Re Millstone Independent Review Team 990312 Rept on Allegations of Discrimination in NRC OI Cases NDA,1-96-002,1-96-007 & 1-97-007 & Associated Lessons Learned,Recommendation 6 ML20217D5291999-09-28028 September 1999 Notation Vote,Disapproving with Comment,On SECY-99-223 Re Millstone Independent Review Team 990312 Rept on Allegations of Discrimination in NRC OI Cases NDA,1-96-002,1-96-007 & 1-97-007 & Associated Lessons Learned,Recommendation 6 ML20217D5361999-09-24024 September 1999 Notation Vote,Disapproving with Comment,On SECY-99-223 Re Millstone Independent Review Team 990312 Rept on Allegations of Discrimination in NRC OI Cases NDA,1-96-002,1-96-007 & 1-97-007 & Associated Lessons Learned,Recommendation 6 ML20217D5251999-09-23023 September 1999 Notation Vote,Disapproving with Comment,On SECY-99-223 Re Millstone Independent Review Team 990312 Rept on Allegations of Discrimination in NRC OI Cases NDA,1-96-002,1-96-007 & 1-97-007 & Associated Lessons Learned,Recommendation 6 ML20217D5191999-09-15015 September 1999 Notation Vote Approving with Comment SECY-99-223 Re Millstone Independent Review Team 990312,rept on Allegations of Discrimination in NRC OI Cases NDA,1-96-002,1-96-007 & 1-97-007 & Associated Lessons Learned,Recommendation 6 ML20206B1721999-04-28028 April 1999 Commission Voting Record on SECY-99-109 Re Recovery of Millstone Nuclear Power Station,Unit 2 ML20206B1771999-04-23023 April 1999 Notation Vote Approving with Comment SECY-99-109 Re Recovery of Millstone Nuclear Power Station,Unit 2 ML20206B1861999-04-22022 April 1999 Notation Vote Approving SECY-99-109 Re Recovery of Millstone Nuclear Power Station,Unit 2 ML20206B1951999-04-22022 April 1999 Notation Vote Approving with Comment SECY-99-109 Re Recovery of Millstone Nuclear Power Station,Unit 2 ML20206B2101999-04-20020 April 1999 Notation Vote Approving with Comment SECY-99-109 Re Recovery of Millstone Nuclear Power Station,Unit 2 ML20206B1981999-04-20020 April 1999 Notation Vote Approving SECY-99-109 Re Recovery of Millstone Nuclear Power Station,Unit 2 ML20207G0351999-03-0909 March 1999 Commission Voting Record on SECY-99-010 Re Closure of Order Requiring Independent,Third-Party Oversight of NNECO Implementation of Resolution of Millstone Station Employees Safety Concerns ML20207G0631999-02-18018 February 1999 Notation Vote Approving with Comment SECY-99-010, Closure of Order Requiring Independent,Third-Party Oversight of NNECO Implementation of Resolution of Millstone Station Employees Safety Concerns ML20207G0911999-02-17017 February 1999 Notation Vote Approving SECY-99-010, Closure of Order Requiring Independent,Third Party Oversight of NNECO Implementation of Resolution of Millstone Station Employees Safety Concerns ML20207G0971999-02-16016 February 1999 Notation Vote Approving with Comments SECY-99-010, Closure of Order Requiring Independent,Third-Party Oversight of NNECO Implementation of Resolution of Millstone Station Employees Safety Concerns ML20207G0451999-01-27027 January 1999 Notation Vote Both Approving & Disapproving with Comments SECY-99-010, Closure of Order Requiring Independent Third- Party Oversight of NNECO Implementation of Resolution of Millstone Station Employees Safety Concerns ML20207G0721999-01-25025 January 1999 Notation Vote Approving with Comments SECY-99-010, Closure of Order Requiring Independent,Third-Party Oversight of NNECO Implementation of Resolution of Millstone Station Employees Safety Concerns ML20151W7451998-08-12012 August 1998 Rev 0 to N-PENG-CALC-014, Picep Code Leakage Flow Rates at Critical Locations of Cold Leg Piping for Millstone Unit 2 Rcs ML20249A6751998-06-15015 June 1998 Commission Voting Record on SECY-98-119 Re Remaining Issues Related to Recovery of Millstone Nuclear Power Station,Unit 3 ML20249A6801998-06-11011 June 1998 Notation Vote Approving W/Comments SECY-98-119, Remaining Issues Related to Recovery of Millstone Nuclear Power Station,Unit 3 ML20249A6791998-06-0808 June 1998 Notation Vote Approving W/Comments SECY-98-119, Remaining Issues Related to Recovery of Millstone Nuclear Power Station,Unit 3 ML20249A6771998-06-0505 June 1998 Notation Vote Approving W/Comments SECY-98-119, Remaining Issues Related to Recovery of Millstone Nuclear Power Station,Unit 3 ML20249A6811998-06-0303 June 1998 Notation Vote Approving W/Comments SECY-98-119, Remaining Issues Related to Recovery of Millstone Nuclear Power Station,Unit 3 ML20199A0171997-12-16016 December 1997 Rev 1 to Calculation NUC-176, DG Tornado Missile Evaluation. W/Three Oversize Drawings ML20217C1901997-12-10010 December 1997 Press Release 97-180, NRC Proposes $2.1 Million in Fines for Violations at Millstone Station ML20198B4491997-10-17017 October 1997 Rev 1 to Calculation 97-SDS-1760-M2, Millstone 2:Pressure/ Temperature Limit Curves for 20 Efpy ML20217C7851997-09-30030 September 1997 ICAVP Project B16763, Rev 2 to Calculation M3-LOE-284-EM, Millstone 3:Pressure/ Temp Limits for 10 Efpy1997-09-30030 September 1997 Rev 2 to Calculation M3-LOE-284-EM, Millstone 3:Pressure/ Temp Limits for 10 Efpy ML20210Q7461997-08-21021 August 1997 Audit Rept OIG/97A-01, NRC Needs Comprehensive Plan to Resolve Regulatory Issues ML20236P1031997-07-16016 July 1997 Package Consisting of Endorsement to Certificates M-0011, M-0015,M-0016 & M-0103 Forming Part of Master Policy Number 1 Nuclear Energy Liability Insurance Amend of Certificate Period Endorsement ML20141K9991997-05-20020 May 1997 Commission Voting Record on SECY-97-174 Re Millstone Lessons Learned Rept,Part 2:Policy Issues ML20141L0461997-04-28028 April 1997 Notation Vote Response Sheet Approving in Part & Disapproving in Part w/comments,SECY-97-036, Millstone Lessons Learned Rept,Part 2:Policy Issues ML20141L0431997-04-27027 April 1997 Notation Vote Response Sheet,Approving in Part & Disapproving in Part w/comments,SECY-97-036, Millstone Lessons Learned Rept,Part 2:Policy Issues ML20141L0231997-04-17017 April 1997 Notation Vote Response Sheet,Approving in Part & Disapproving in Part w/comments,SECY-97-036, Millstone Lessons Learned Rept,Part 2:Policy Issues ML20141L0141997-04-10010 April 1997 Notation Vote Response Sheet,Approving W/Comments, SECY-97-036, Millstone Lessons Learned Rept,Part 2:Policy Issues, Supplemental Vote ML20141L0351997-03-31031 March 1997 Notation Vote Response Sheet,Approving W/Comments, SECY-97-036, Millstone Lessons Learned Rept,Part 2:Policy Issues ML20141L0051997-03-17017 March 1997 Notation Vote Response Sheet Approving W/Comments, SECY-97-036, Millstone Lessons Learned Rept,Part 2:Policy Issues ML20138L9221997-02-20020 February 1997 Commission Voting Record on SECY-97-006, Followup to Annual Rept on Allegations & Responses to Recommendations of Millstone Independent Review Group ML20138L9371997-02-0707 February 1997 Notation Vote Response Sheet Approving W/Comments, SECY-97-006, Followup to Annual Rept on Allegations & Responses to Recommendations of Millstone Independent Review Group ML20138L9711997-02-0606 February 1997 Notation Vote Response Sheet Approving SECY-97-006, Followup to Annual Rept on Allegations & Responses to Recommendations of Millstone Independent Review Group ML20138M0301997-02-0303 February 1997 Notation Vote Response Sheet Approving W/Comments, SECY-97-006, Followup to Annual Rept on Allegations & Responses to Recommendations of Millstone Independent Review Group ML20138M0151997-01-27027 January 1997 Notation Vote Response Sheet Approving W/Comments, SECY-97-006, Followup to Annual Rept on Allegations & Responses to Recommendations of Millstone Independent Review Group ML20138L9621997-01-17017 January 1997 Notation Vote Response Sheet Approving W/Comments, SECY-97-006, Followup to Annual Rept on Allegations & Responses to Recommendations of Millstone Independent Review Group ML20132D7271996-12-13013 December 1996 Rev 0 to Ampacity Derating of Cables Due to Thermo-Lag ML20135E8021996-12-11011 December 1996 Press Release I-96-79, NRC to Hold Two Meetings 961217 in Connecticut on Millstone Nuclear Plant ML20138H2941996-12-11011 December 1996 Ampacity Derating of Cables Due to Thermo-Lag - MP-1 ML20134P1021996-11-27027 November 1996 Press Release I-96-77, NRC Staff to Discuss Apparent Violations at Haddam Neck & Millstone ML20134M2121996-11-22022 November 1996 Press Release 96-165, NRC Begins First of Series of Design Insps at Nuclear Power Plants ML20129K2881996-11-15015 November 1996 Press Release 96-159, NRC Reassigns Regional Managers ML20141D2821996-10-30030 October 1996 Rev 2 to PRA96NQA-01093-S3, MP3 Maint Performance Criteria 1999-09-28 Category:LETTER BALLOT MONTHYEARML20217D3871999-10-13013 October 1999
[Table view]Commission Voting Record on SECY-99-223 Re Millstone Independent Review Team 990312 Rept on Allegations of Discrimination in NRC OI Cases NDA,1-96-002,1-96-007 & 1-97-007 & Associated Lessons Learned,Recommendation 6 ML20217D5291999-09-28028 September 1999 Notation Vote,Disapproving with Comment,On SECY-99-223 Re Millstone Independent Review Team 990312 Rept on Allegations of Discrimination in NRC OI Cases NDA,1-96-002,1-96-007 & 1-97-007 & Associated Lessons Learned,Recommendation 6 ML20217D5361999-09-24024 September 1999 Notation Vote,Disapproving with Comment,On SECY-99-223 Re Millstone Independent Review Team 990312 Rept on Allegations of Discrimination in NRC OI Cases NDA,1-96-002,1-96-007 & 1-97-007 & Associated Lessons Learned,Recommendation 6 ML20217D5251999-09-23023 September 1999 Notation Vote,Disapproving with Comment,On SECY-99-223 Re Millstone Independent Review Team 990312 Rept on Allegations of Discrimination in NRC OI Cases NDA,1-96-002,1-96-007 & 1-97-007 & Associated Lessons Learned,Recommendation 6 ML20217D5191999-09-15015 September 1999 Notation Vote Approving with Comment SECY-99-223 Re Millstone Independent Review Team 990312,rept on Allegations of Discrimination in NRC OI Cases NDA,1-96-002,1-96-007 & 1-97-007 & Associated Lessons Learned,Recommendation 6 ML20206B1721999-04-28028 April 1999 Commission Voting Record on SECY-99-109 Re Recovery of Millstone Nuclear Power Station,Unit 2 ML20206B1771999-04-23023 April 1999 Notation Vote Approving with Comment SECY-99-109 Re Recovery of Millstone Nuclear Power Station,Unit 2 ML20206B1861999-04-22022 April 1999 Notation Vote Approving SECY-99-109 Re Recovery of Millstone Nuclear Power Station,Unit 2 ML20206B1951999-04-22022 April 1999 Notation Vote Approving with Comment SECY-99-109 Re Recovery of Millstone Nuclear Power Station,Unit 2 ML20206B2101999-04-20020 April 1999 Notation Vote Approving with Comment SECY-99-109 Re Recovery of Millstone Nuclear Power Station,Unit 2 ML20206B1981999-04-20020 April 1999 Notation Vote Approving SECY-99-109 Re Recovery of Millstone Nuclear Power Station,Unit 2 ML20207G0351999-03-0909 March 1999 Commission Voting Record on SECY-99-010 Re Closure of Order Requiring Independent,Third-Party Oversight of NNECO Implementation of Resolution of Millstone Station Employees Safety Concerns ML20207G0631999-02-18018 February 1999 Notation Vote Approving with Comment SECY-99-010, Closure of Order Requiring Independent,Third-Party Oversight of NNECO Implementation of Resolution of Millstone Station Employees Safety Concerns ML20207G0911999-02-17017 February 1999 Notation Vote Approving SECY-99-010, Closure of Order Requiring Independent,Third Party Oversight of NNECO Implementation of Resolution of Millstone Station Employees Safety Concerns ML20207G0971999-02-16016 February 1999 Notation Vote Approving with Comments SECY-99-010, Closure of Order Requiring Independent,Third-Party Oversight of NNECO Implementation of Resolution of Millstone Station Employees Safety Concerns ML20207G0451999-01-27027 January 1999 Notation Vote Both Approving & Disapproving with Comments SECY-99-010, Closure of Order Requiring Independent Third- Party Oversight of NNECO Implementation of Resolution of Millstone Station Employees Safety Concerns ML20207G0721999-01-25025 January 1999 Notation Vote Approving with Comments SECY-99-010, Closure of Order Requiring Independent,Third-Party Oversight of NNECO Implementation of Resolution of Millstone Station Employees Safety Concerns ML20249A6751998-06-15015 June 1998 Commission Voting Record on SECY-98-119 Re Remaining Issues Related to Recovery of Millstone Nuclear Power Station,Unit 3 ML20249A6801998-06-11011 June 1998 Notation Vote Approving W/Comments SECY-98-119, Remaining Issues Related to Recovery of Millstone Nuclear Power Station,Unit 3 ML20249A6791998-06-0808 June 1998 Notation Vote Approving W/Comments SECY-98-119, Remaining Issues Related to Recovery of Millstone Nuclear Power Station,Unit 3 ML20249A6771998-06-0505 June 1998 Notation Vote Approving W/Comments SECY-98-119, Remaining Issues Related to Recovery of Millstone Nuclear Power Station,Unit 3 ML20249A6811998-06-0303 June 1998 Notation Vote Approving W/Comments SECY-98-119, Remaining Issues Related to Recovery of Millstone Nuclear Power Station,Unit 3 ML20141K9991997-05-20020 May 1997 Commission Voting Record on SECY-97-174 Re Millstone Lessons Learned Rept,Part 2:Policy Issues ML20141L0461997-04-28028 April 1997 Notation Vote Response Sheet Approving in Part & Disapproving in Part w/comments,SECY-97-036, Millstone Lessons Learned Rept,Part 2:Policy Issues ML20141L0431997-04-27027 April 1997 Notation Vote Response Sheet,Approving in Part & Disapproving in Part w/comments,SECY-97-036, Millstone Lessons Learned Rept,Part 2:Policy Issues ML20141L0231997-04-17017 April 1997 Notation Vote Response Sheet,Approving in Part & Disapproving in Part w/comments,SECY-97-036, Millstone Lessons Learned Rept,Part 2:Policy Issues ML20141L0141997-04-10010 April 1997 Notation Vote Response Sheet,Approving W/Comments, SECY-97-036, Millstone Lessons Learned Rept,Part 2:Policy Issues, Supplemental Vote ML20141L0351997-03-31031 March 1997 Notation Vote Response Sheet,Approving W/Comments, SECY-97-036, Millstone Lessons Learned Rept,Part 2:Policy Issues ML20141L0051997-03-17017 March 1997 Notation Vote Response Sheet Approving W/Comments, SECY-97-036, Millstone Lessons Learned Rept,Part 2:Policy Issues ML20138L9221997-02-20020 February 1997 Commission Voting Record on SECY-97-006, Followup to Annual Rept on Allegations & Responses to Recommendations of Millstone Independent Review Group ML20138L9371997-02-0707 February 1997 Notation Vote Response Sheet Approving W/Comments, SECY-97-006, Followup to Annual Rept on Allegations & Responses to Recommendations of Millstone Independent Review Group ML20138L9711997-02-0606 February 1997 Notation Vote Response Sheet Approving SECY-97-006, Followup to Annual Rept on Allegations & Responses to Recommendations of Millstone Independent Review Group ML20138M0301997-02-0303 February 1997 Notation Vote Response Sheet Approving W/Comments, SECY-97-006, Followup to Annual Rept on Allegations & Responses to Recommendations of Millstone Independent Review Group ML20138M0151997-01-27027 January 1997 Notation Vote Response Sheet Approving W/Comments, SECY-97-006, Followup to Annual Rept on Allegations & Responses to Recommendations of Millstone Independent Review Group ML20138L9621997-01-17017 January 1997 Notation Vote Response Sheet Approving W/Comments, SECY-97-006, Followup to Annual Rept on Allegations & Responses to Recommendations of Millstone Independent Review Group 1999-09-28 Category:NOMINATION VOTE MONTHYEARML20217D3871999-10-13013 October 1999
[Table view]Commission Voting Record on SECY-99-223 Re Millstone Independent Review Team 990312 Rept on Allegations of Discrimination in NRC OI Cases NDA,1-96-002,1-96-007 & 1-97-007 & Associated Lessons Learned,Recommendation 6 ML20217D5291999-09-28028 September 1999 Notation Vote,Disapproving with Comment,On SECY-99-223 Re Millstone Independent Review Team 990312 Rept on Allegations of Discrimination in NRC OI Cases NDA,1-96-002,1-96-007 & 1-97-007 & Associated Lessons Learned,Recommendation 6 ML20217D5361999-09-24024 September 1999 Notation Vote,Disapproving with Comment,On SECY-99-223 Re Millstone Independent Review Team 990312 Rept on Allegations of Discrimination in NRC OI Cases NDA,1-96-002,1-96-007 & 1-97-007 & Associated Lessons Learned,Recommendation 6 ML20217D5251999-09-23023 September 1999 Notation Vote,Disapproving with Comment,On SECY-99-223 Re Millstone Independent Review Team 990312 Rept on Allegations of Discrimination in NRC OI Cases NDA,1-96-002,1-96-007 & 1-97-007 & Associated Lessons Learned,Recommendation 6 ML20217D5191999-09-15015 September 1999 Notation Vote Approving with Comment SECY-99-223 Re Millstone Independent Review Team 990312,rept on Allegations of Discrimination in NRC OI Cases NDA,1-96-002,1-96-007 & 1-97-007 & Associated Lessons Learned,Recommendation 6 ML20206B1721999-04-28028 April 1999 Commission Voting Record on SECY-99-109 Re Recovery of Millstone Nuclear Power Station,Unit 2 ML20206B1771999-04-23023 April 1999 Notation Vote Approving with Comment SECY-99-109 Re Recovery of Millstone Nuclear Power Station,Unit 2 ML20206B1861999-04-22022 April 1999 Notation Vote Approving SECY-99-109 Re Recovery of Millstone Nuclear Power Station,Unit 2 ML20206B1951999-04-22022 April 1999 Notation Vote Approving with Comment SECY-99-109 Re Recovery of Millstone Nuclear Power Station,Unit 2 ML20206B2101999-04-20020 April 1999 Notation Vote Approving with Comment SECY-99-109 Re Recovery of Millstone Nuclear Power Station,Unit 2 ML20206B1981999-04-20020 April 1999 Notation Vote Approving SECY-99-109 Re Recovery of Millstone Nuclear Power Station,Unit 2 ML20207G0351999-03-0909 March 1999 Commission Voting Record on SECY-99-010 Re Closure of Order Requiring Independent,Third-Party Oversight of NNECO Implementation of Resolution of Millstone Station Employees Safety Concerns ML20207G0631999-02-18018 February 1999 Notation Vote Approving with Comment SECY-99-010, Closure of Order Requiring Independent,Third-Party Oversight of NNECO Implementation of Resolution of Millstone Station Employees Safety Concerns ML20207G0911999-02-17017 February 1999 Notation Vote Approving SECY-99-010, Closure of Order Requiring Independent,Third Party Oversight of NNECO Implementation of Resolution of Millstone Station Employees Safety Concerns ML20207G0971999-02-16016 February 1999 Notation Vote Approving with Comments SECY-99-010, Closure of Order Requiring Independent,Third-Party Oversight of NNECO Implementation of Resolution of Millstone Station Employees Safety Concerns ML20207G0451999-01-27027 January 1999 Notation Vote Both Approving & Disapproving with Comments SECY-99-010, Closure of Order Requiring Independent Third- Party Oversight of NNECO Implementation of Resolution of Millstone Station Employees Safety Concerns ML20207G0721999-01-25025 January 1999 Notation Vote Approving with Comments SECY-99-010, Closure of Order Requiring Independent,Third-Party Oversight of NNECO Implementation of Resolution of Millstone Station Employees Safety Concerns ML20249A6751998-06-15015 June 1998 Commission Voting Record on SECY-98-119 Re Remaining Issues Related to Recovery of Millstone Nuclear Power Station,Unit 3 ML20249A6801998-06-11011 June 1998 Notation Vote Approving W/Comments SECY-98-119, Remaining Issues Related to Recovery of Millstone Nuclear Power Station,Unit 3 ML20249A6791998-06-0808 June 1998 Notation Vote Approving W/Comments SECY-98-119, Remaining Issues Related to Recovery of Millstone Nuclear Power Station,Unit 3 ML20249A6771998-06-0505 June 1998 Notation Vote Approving W/Comments SECY-98-119, Remaining Issues Related to Recovery of Millstone Nuclear Power Station,Unit 3 ML20249A6811998-06-0303 June 1998 Notation Vote Approving W/Comments SECY-98-119, Remaining Issues Related to Recovery of Millstone Nuclear Power Station,Unit 3 ML20141K9991997-05-20020 May 1997 Commission Voting Record on SECY-97-174 Re Millstone Lessons Learned Rept,Part 2:Policy Issues ML20141L0461997-04-28028 April 1997 Notation Vote Response Sheet Approving in Part & Disapproving in Part w/comments,SECY-97-036, Millstone Lessons Learned Rept,Part 2:Policy Issues ML20141L0431997-04-27027 April 1997 Notation Vote Response Sheet,Approving in Part & Disapproving in Part w/comments,SECY-97-036, Millstone Lessons Learned Rept,Part 2:Policy Issues ML20141L0231997-04-17017 April 1997 Notation Vote Response Sheet,Approving in Part & Disapproving in Part w/comments,SECY-97-036, Millstone Lessons Learned Rept,Part 2:Policy Issues ML20141L0141997-04-10010 April 1997 Notation Vote Response Sheet,Approving W/Comments, SECY-97-036, Millstone Lessons Learned Rept,Part 2:Policy Issues, Supplemental Vote ML20141L0351997-03-31031 March 1997 Notation Vote Response Sheet,Approving W/Comments, SECY-97-036, Millstone Lessons Learned Rept,Part 2:Policy Issues ML20141L0051997-03-17017 March 1997 Notation Vote Response Sheet Approving W/Comments, SECY-97-036, Millstone Lessons Learned Rept,Part 2:Policy Issues ML20138L9221997-02-20020 February 1997 Commission Voting Record on SECY-97-006, Followup to Annual Rept on Allegations & Responses to Recommendations of Millstone Independent Review Group ML20138L9371997-02-0707 February 1997 Notation Vote Response Sheet Approving W/Comments, SECY-97-006, Followup to Annual Rept on Allegations & Responses to Recommendations of Millstone Independent Review Group ML20138L9711997-02-0606 February 1997 Notation Vote Response Sheet Approving SECY-97-006, Followup to Annual Rept on Allegations & Responses to Recommendations of Millstone Independent Review Group ML20138M0301997-02-0303 February 1997 Notation Vote Response Sheet Approving W/Comments, SECY-97-006, Followup to Annual Rept on Allegations & Responses to Recommendations of Millstone Independent Review Group ML20138M0151997-01-27027 January 1997 Notation Vote Response Sheet Approving W/Comments, SECY-97-006, Followup to Annual Rept on Allegations & Responses to Recommendations of Millstone Independent Review Group ML20138L9621997-01-17017 January 1997 Notation Vote Response Sheet Approving W/Comments, SECY-97-006, Followup to Annual Rept on Allegations & Responses to Recommendations of Millstone Independent Review Group 1999-09-28 Category:COMMISSION VOTING MONTHYEARML20217D3871999-10-13013 October 1999
[Table view]Commission Voting Record on SECY-99-223 Re Millstone Independent Review Team 990312 Rept on Allegations of Discrimination in NRC OI Cases NDA,1-96-002,1-96-007 & 1-97-007 & Associated Lessons Learned,Recommendation 6 ML20217D5291999-09-28028 September 1999 Notation Vote,Disapproving with Comment,On SECY-99-223 Re Millstone Independent Review Team 990312 Rept on Allegations of Discrimination in NRC OI Cases NDA,1-96-002,1-96-007 & 1-97-007 & Associated Lessons Learned,Recommendation 6 ML20217D5361999-09-24024 September 1999 Notation Vote,Disapproving with Comment,On SECY-99-223 Re Millstone Independent Review Team 990312 Rept on Allegations of Discrimination in NRC OI Cases NDA,1-96-002,1-96-007 & 1-97-007 & Associated Lessons Learned,Recommendation 6 ML20217D5251999-09-23023 September 1999 Notation Vote,Disapproving with Comment,On SECY-99-223 Re Millstone Independent Review Team 990312 Rept on Allegations of Discrimination in NRC OI Cases NDA,1-96-002,1-96-007 & 1-97-007 & Associated Lessons Learned,Recommendation 6 ML20217D5191999-09-15015 September 1999 Notation Vote Approving with Comment SECY-99-223 Re Millstone Independent Review Team 990312,rept on Allegations of Discrimination in NRC OI Cases NDA,1-96-002,1-96-007 & 1-97-007 & Associated Lessons Learned,Recommendation 6 ML20206B1721999-04-28028 April 1999 Commission Voting Record on SECY-99-109 Re Recovery of Millstone Nuclear Power Station,Unit 2 ML20206B1771999-04-23023 April 1999 Notation Vote Approving with Comment SECY-99-109 Re Recovery of Millstone Nuclear Power Station,Unit 2 ML20206B1861999-04-22022 April 1999 Notation Vote Approving SECY-99-109 Re Recovery of Millstone Nuclear Power Station,Unit 2 ML20206B1951999-04-22022 April 1999 Notation Vote Approving with Comment SECY-99-109 Re Recovery of Millstone Nuclear Power Station,Unit 2 ML20206B2101999-04-20020 April 1999 Notation Vote Approving with Comment SECY-99-109 Re Recovery of Millstone Nuclear Power Station,Unit 2 ML20206B1981999-04-20020 April 1999 Notation Vote Approving SECY-99-109 Re Recovery of Millstone Nuclear Power Station,Unit 2 ML20207G0351999-03-0909 March 1999 Commission Voting Record on SECY-99-010 Re Closure of Order Requiring Independent,Third-Party Oversight of NNECO Implementation of Resolution of Millstone Station Employees Safety Concerns ML20207G0631999-02-18018 February 1999 Notation Vote Approving with Comment SECY-99-010, Closure of Order Requiring Independent,Third-Party Oversight of NNECO Implementation of Resolution of Millstone Station Employees Safety Concerns ML20207G0911999-02-17017 February 1999 Notation Vote Approving SECY-99-010, Closure of Order Requiring Independent,Third Party Oversight of NNECO Implementation of Resolution of Millstone Station Employees Safety Concerns ML20207G0971999-02-16016 February 1999 Notation Vote Approving with Comments SECY-99-010, Closure of Order Requiring Independent,Third-Party Oversight of NNECO Implementation of Resolution of Millstone Station Employees Safety Concerns ML20207G0451999-01-27027 January 1999 Notation Vote Both Approving & Disapproving with Comments SECY-99-010, Closure of Order Requiring Independent Third- Party Oversight of NNECO Implementation of Resolution of Millstone Station Employees Safety Concerns ML20207G0721999-01-25025 January 1999 Notation Vote Approving with Comments SECY-99-010, Closure of Order Requiring Independent,Third-Party Oversight of NNECO Implementation of Resolution of Millstone Station Employees Safety Concerns ML20249A6751998-06-15015 June 1998 Commission Voting Record on SECY-98-119 Re Remaining Issues Related to Recovery of Millstone Nuclear Power Station,Unit 3 ML20249A6801998-06-11011 June 1998 Notation Vote Approving W/Comments SECY-98-119, Remaining Issues Related to Recovery of Millstone Nuclear Power Station,Unit 3 ML20249A6791998-06-0808 June 1998 Notation Vote Approving W/Comments SECY-98-119, Remaining Issues Related to Recovery of Millstone Nuclear Power Station,Unit 3 ML20249A6771998-06-0505 June 1998 Notation Vote Approving W/Comments SECY-98-119, Remaining Issues Related to Recovery of Millstone Nuclear Power Station,Unit 3 ML20249A6811998-06-0303 June 1998 Notation Vote Approving W/Comments SECY-98-119, Remaining Issues Related to Recovery of Millstone Nuclear Power Station,Unit 3 ML20141K9991997-05-20020 May 1997 Commission Voting Record on SECY-97-174 Re Millstone Lessons Learned Rept,Part 2:Policy Issues ML20141L0461997-04-28028 April 1997 Notation Vote Response Sheet Approving in Part & Disapproving in Part w/comments,SECY-97-036, Millstone Lessons Learned Rept,Part 2:Policy Issues ML20141L0431997-04-27027 April 1997 Notation Vote Response Sheet,Approving in Part & Disapproving in Part w/comments,SECY-97-036, Millstone Lessons Learned Rept,Part 2:Policy Issues ML20141L0231997-04-17017 April 1997 Notation Vote Response Sheet,Approving in Part & Disapproving in Part w/comments,SECY-97-036, Millstone Lessons Learned Rept,Part 2:Policy Issues ML20141L0141997-04-10010 April 1997 Notation Vote Response Sheet,Approving W/Comments, SECY-97-036, Millstone Lessons Learned Rept,Part 2:Policy Issues, Supplemental Vote ML20141L0351997-03-31031 March 1997 Notation Vote Response Sheet,Approving W/Comments, SECY-97-036, Millstone Lessons Learned Rept,Part 2:Policy Issues ML20141L0051997-03-17017 March 1997 Notation Vote Response Sheet Approving W/Comments, SECY-97-036, Millstone Lessons Learned Rept,Part 2:Policy Issues ML20138L9221997-02-20020 February 1997 Commission Voting Record on SECY-97-006, Followup to Annual Rept on Allegations & Responses to Recommendations of Millstone Independent Review Group ML20138L9371997-02-0707 February 1997 Notation Vote Response Sheet Approving W/Comments, SECY-97-006, Followup to Annual Rept on Allegations & Responses to Recommendations of Millstone Independent Review Group ML20138L9711997-02-0606 February 1997 Notation Vote Response Sheet Approving SECY-97-006, Followup to Annual Rept on Allegations & Responses to Recommendations of Millstone Independent Review Group ML20138M0301997-02-0303 February 1997 Notation Vote Response Sheet Approving W/Comments, SECY-97-006, Followup to Annual Rept on Allegations & Responses to Recommendations of Millstone Independent Review Group ML20138M0151997-01-27027 January 1997 Notation Vote Response Sheet Approving W/Comments, SECY-97-006, Followup to Annual Rept on Allegations & Responses to Recommendations of Millstone Independent Review Group ML20138L9621997-01-17017 January 1997 Notation Vote Response Sheet Approving W/Comments, SECY-97-006, Followup to Annual Rept on Allegations & Responses to Recommendations of Millstone Independent Review Group 1999-09-28 |
Text
<
N OT ATIO N VOTE RESPONSE SHEET TO: Annette Vietti-Cook Secretary of the Commission FROM: COMMISSIONER DICUS
SUBJECT:
SECY-99-109 - RECOVERY OF MILLSTONE NUCLEAR POWER STATION, UNIT 2 Approved x Disapproved Abstain Not Participating Request Discussion COMMENTS:
I l
I l
I (7fA Q.,
SIGNkTy%g Dm I M i.f_. 2. Z. /779 WATE f l Entered on "AS" Yes v' No __
- g.2gg gg2s CORRESPONDENCE PDR m A W7 90/77 _ i
Retrieved from "https://kanterella.com/w/index.php?title=ML20206B186&oldid=3016491"