April 6, 1987
~.,
hRC/THI-87-031 MEHORAFDUM FOR:
Harold R. Denton, Director g;
Office of Nuclear Reactor Regulation a
e Frank A Miraglia Director i.
Division of PWR Licensing-B
?
FROM:
W1iliam D. Travers,1[irector
,b TMI-2 Cleanup Project Directorate
[
m
]
SUBJECT:
HRC THI-2 CLEANUP PROJECT DIRECTORATE WEEr.LY STATUS-
~
f REPORT FOR MARCH 31.- APRIL 5, 1987 p
(
1..
DEFUELING a
e Pick and place fuel removal operations continued using a variety of i
tools. Some vacuum fuel removal was done with the airlift tool.
9' Most of the fuel debris loaded into canisters was removed from the y
core bore test pattern area.
Wx Four canisters were filled with debris and one was partially filled ; ' %
}
Three filled canisters were transferred to the spent fuel pool.
~ g f
2.
ENVIRO?C4 ENTAL MONITORING
+
3 US Environmental Protection Agency (EPA) sample analysis results F
show that TMI site liquid effluents are in accordance with regulatory limits, NRC requirements, and the City of Lancaster i,
Agreement.
~
~
TMI eater effluents are sampled from the station (Units 1 and 2)
, p' discharge and analyzed by EPA. Gamma spectrus analyses of the seven
~
daily composited samples,for March (14. 21,,1937-in catc 6 0 THI-2 related radioactivity.
\\
/
EPA's gamca spectrum analysis of th)e NRC's TMI utdopr/
e air sar.ple 5
for the period March 27 - April 2, 1987 showe noj/eactor related radioactivity.
water works for the City of Lancaster composited se[ven daily s
The
(
-- \\
samples from March 14 - 21, 1987. EPA's gaama' spectrum analysis 6f g
.he composite sample showed no reactor related radioactivity.:'
e 3.
DECONTAMINATION ACTIVITIES
~
"p Scabbling of tha floor beneath the B and C bleed' tanks continued.
W Desludging of the auxiliary building sump continued.
k_
Robot destudging of the reactor building basement has begun. ' First a
video pictures removed in the\\ indicate a very thin layer of sludge was completely drea.
- .s
/
B7040 0004 870406
.o,,,..>
PDR ADOCK 05000320 R
~
~
DATE F
. +. *....
+ * * "... * -
s:c conu sis (to aos uncu o24o OFFICIAL RECORD COPY l
-. g y
/
n: p '
s
~
~ -
A
'y" l.
'Harc1d R.. Denton.
/
2-
'Aprilv6c 1987 _..=
. ~
- f e.
Frank J. Hiraglia>'
I;RC/THI-87-031 E"
~,,
.)::s
-y:
./
'4.
NRC EVALUATIONS '
q;-
a.-
Cor.pleted.
Seismic Evaluation for Modified Containment Penetration was-
-E y approved on April 3, 1987.
b.
In Progress Technical Specification Change Request numbers 49 and 51 and' the associated Recavery Operations Plan Change Requests 31 and 33.
Technical Specification Change Requests 52,.55 and 56.
Solid Waste Facility Technical Evaluation Report.
T
' 'ji ?
Heavy Load Safety Evaluation Report, Revision 3.
Processed _ Water Disposition Proposal.
"?
. Safety Evaluation Report for Use of Plasma Arc Cutting Torch.
Temporary Reactor Vessel Filtration System Safety Evaluation Report, Revision 3.
Pressurizer Defueling Safety Evaluation Report.
j, Safety Evaluation Report for Defueling of the Core Support Assembly.
("
5.
HEETING The next meeting of the Advisory Panel is scheduled for April 16, 1987 in Washington, DC, before the NRC Commissioners..The meeting will be open to the public and will address processed accident-generated water e
disposal..
omoe4At stGNID Bla
.n w aso. D. annen w
. p William D. Travers
~
Director TMI-2 Cleanup' Project Directorate 4 v..
};
1 l -
/
M.
- r
=..*..a*
su ""*" >
L*^*' >
NRC FORM 318 (10 80) NRCM 0240.
O IClh RECORD COPY
Harold R2 Der.t:n 3
April 6, 1987 Frank J. liiraglia flRC/TMI-87-031 INTERNAL DISTRIBUTION CEr4 TRAL FILE f!RC PDR LOCAL PDR EDO OSC EPA DOE RI Regicaal Ad;ninistrator RI Division Directors Public Affairs, RI State Liaison, RI TMI HQ r/f THI SITE r/f THI-2 Project Section File Tlil-1 Resident Office (5)
TMI Cleanup Project Directorate (14)
>> /
- /
CFFfCE)
T.M. I.C.P.D....T.M. I.C.P.D......
.T.M. I.C.P..
.TM.19'hD..
,hs,,,..
...W87 4/f!.87
,d(!(/87 wa~^=+.DCg1,1,i, :j s,CCggi11.,, phN9,,,,,,
4/
44
. /.. /.87 4
o^" >
nnc Fonu ais no-soi uncu o24 OFFICIR RECORD COPY