.g satisfied within an additional 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />, the reactor shall be placed in the cold shutdown condition.
a.
One of the assigned component cooling pumps may be out of service provided a pump is restored to operable status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
b.
Two heat exchangers which may be aligned to the operating unit may be out of service provided repairs can be completed within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.
Two Unit Operation i
1.
Both reactors shall not be made critical unless the following conditions are met:
a.
Three component cooling pumps are operable.
b.
Three component cooling heat exchangers are operable, c.
All valves, interlocks and piping required for the functioning of the system during accident conditions and associated with the above components are operable.
During power operation, the requirements of 15.3.3.C-1 may be modified to l
allow one of the following conditions at any one time.
If the system is not l
restored to meet the conditions of 15.3.3.C-1 within the time period 7
specified, one reactor shall be placed in the hot shutdown condition.
If the i
requirements, of 15.3.3.C-1 are not satisfied within an additional 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />, the reactor shall be placed in the cold shutdown condition.
1 a.
One of the three assigned component cooling pumps may be out of service provided a pump is restored to operable status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, b.
Two heat exchangers may be out of service provideo repairs can be completed within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.
D.
Service Water System 1.
Naither reactor shall be made or maintained critical unless the following conditions are met:
15.3.3-5 Unit 1 Amendment No. 3, JDJ, 105 l
Unit 2 Amendment No. 3, 83, IDA, 106 h 4$ Q 05000266 870401 P
PDR_
L_
~s.
Distribution Copies:
Docket Files NRC PDR Local PDR PAD #1 r/f PAD #1 p/f Triovak, Actg. DD NThoirpson, DHFT OGC-Bethesda Edordan BGrimes JPartlow Glear PShuttleworth TColburn ACPS (10)
LFMB l
)
A I
S 4
l l