[7590-01-P]

U. S. NUCLEAR REGULATORY COMMISSION Agency Information Collection Activities: Submission for OMB Review; Comment Request AGENCY: U. S. Nuclear Regulatory Commission (NRC)

ACTION: Notice of the OMB review of information collection and solicitation of public comment.

SUMMARY

The NRC has recently submitted to OMB for review the following proposal for the collection of information under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35). The NRC hereby informs potential respondents that an agency may not conduct or sponsor, and that a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
1. Type of submission, new, revision, or extension: Extension
2. The title of the information collection: General Assignment
3. The form number if applicable: NRC Form 450
4. How often the collection is required: Once during the closeout process.

w 9904290232 990421 E

PDR ORQ DR

  • l

I 5. Who will be required or asked to report: Contractors, Grantees, and Cooperators

6. An estimate of the number of responses: 150
7. The estimated number of annual respondents: 150
8. An estimate of the total number of hours needed annually to complete the requirement or request: 300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> (2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> per response)
9. An indication of whether Section 3507(d), Pub. L.104-13 applies: N/A
10. Abstract: During the contract closeout process, the NRC requires the contractor to execute a NRC Form 450, General Assignment. Completion of the form grants the govemment all rights, titles, and interest to refunds arising nut of the contractor performance. I l

A copy of the final supporting ctatement may be viewed free of charge at the NRC Public Document Room,2120 L Street, NW (lower level), Washington, DC. OMB clearance requests i

1 are available at the NRC worldwide web site (http://www.nrc. gov /NRC/PUBLIC/OMB/index.html).

The document will be available on the NRC home page site for 60 days after the signature date of this notice.

I 4

1* A W '**- ' + e,..p m-

Comments and questions should be directed to the OMB reviewer listed below by (insert date 30 days after publication in the Federal Reaister). Comments received after this date will be considered if it is practical to do so, but assurance of consideration cannot be given to comments received after this date.

Erik Godwin Office of Information and Regulatory Affairs (3150- 0114)

NEOB-10202 Office of Management and Budget Washington, DC 20503 Comments can also be submitted by telephone at (202) 395-3087.

The NRC Clearance Officer is Brenda Jo. Shelton. 301-415-7233.

Dated at Rockville, Maryland, this A/# day of ^ #'1999.

For the Nuclear Regulatory Commission.

A_L 2. M Brenda . Sheifon, NR6dlearanceIdWicer Office of th hief Information Officer i