4.

t i

a Selected NRC Products High-Level Waste Program January 1987 9

3 t

4 F

1 4

i.

8704080043 870131 ~

PDR WASTE WPt-1 PDR

~..

-+-ww_,m,

2 e

SELECTED NRC PRODUCTS HIGH-LEVEL WASTE PROGRAM INTRODUCTION The purpose of this list is to identify selected NRC High-Level Waste Program products and provide a summary of current and planned documents issued by the NRC staff. The list is not intended to be directive in nature but rather to offer a collection of products generated by the HLW program in order to provide timely guidance / advice for prelicensing and eventual licensing phases.

It is necessary to use a variety of documents to provide such guidance because of: a) variability in the nature of the technical issues in HLW; b) the site specific nature of many of the issues; c) the evolving nature of issues with time as the exploratory site investigations are carried out; and d) variability in what is an appropriate level of detail that must be addressed in guidance.

The Nuclear Waste Policy Act of 1982 (NWPA) has established by law schedules for certain accomplishments in the HLW program.

For many reasons, DOE will meet the milestones while, in some cases, they may be unable to meet the schedule. Due to the uncertainties in investigative results and changes of priorities and schedules, guidance flexibility is also needed The variety of existing documents and procedural forms allows the staff to take a flexible approach in assuring efficient, timely and complete guidance in the prelicensing and licensing phases. This summary permits interested parties who have limited time and who cannot, practically speaking, follow the great amount of detail that is the subject of the prelicensing guidance process to be informed of how the process is working. This summary offers a listing of generic as well as site-specific products which have been or are being planned. The document will be reviewed and reissued on a periodic basise The summary is divided into three major components: Regulations, Licensing Guidance Process; and NRC Review Plans. Copies of the referenced documents can be obtained from the USNRC Public Document Room.

I.

REGULATIONS While there are a number of NRC and other Federal agencies rules and regulations which pertain to the prelicensing and licensing actions, this list includes only those products produced by the HLW Program.

1 L

,_r-

r 3

i 10 CFR Part 60--Disposal of High-Level Radioactive Wastes' in Geologic Repositories.

TITLE ISSUE DATE o

Licensing Procedures for HLW in Geologic February 1981 Repositories NEPA/EIS Adoption (Proposed)

TBD Site Characterization and State / Tribal July 1986 Participation (Final) o Technical Criteria for HLW in Geologic Repositories June 1983 Unsaturated Zone July 1985 Definition of High-Level Waste (ANPR)

March 1987*

EPA Standard (Proposed)

June 1986 II. LICENSING GUIDANCE PROCESS This section is divided into eight areas: Site Characterization Analysis (SCA) and Semi-annual update reviews; Regulatory Guides; Staff Technical Positions; Documented Technical Meetings; Environmental Assessment Reviews; Contractor Reports (Research and Special Studies); State / Tribal Interactions; and Program Planning and Management Reviews.

A.

SITE CHARACTERIZATION ANALYSIS AND SEMI-ANNUAL REPORTS The SCA's are issued by NRC as a NUREG document as a result of the staff evaluations of the DOE's Site Characterization Plans (SCP's). An SCP is issued before an exploratory shaft is sunk at any candidate site. Follow up 4

will be provided by semi-annual reports issued by the staff. The NRC reports would be in response to the DOE's semi-annual reports which are also required under the NWPA (Section 113).

TITLE ISSUE DATE BWIP Site Characterization Analysis--NUREG-0960 April 1983 BWIP Site Characterization Analysis FY87**

NNWSI Site Characterization Analysis FY87**

Salt Site Characterization Analysis FY88**

  • Projected Issue Date
    • Projected release dates of DOE's Site Characterization Plans (SCP's). NRC's Site Characterization Analyses would be completed six months after SCP Release.

4 e

B.

REGULATORY. GUIDES Regulatory Guides are drafted by the staff to establish a standard approach to licensing. They are not directives, but reflect' acceptable procedures or actions which would be considered acceptable by-the staff.

The current plans are to issue standard content and format documents-as Regulatory Guides.

TITLE DESCRIPTION ISSUE DATE 1.

Regulatory Guide 4.17 Standard Format and Content February 1985*

of Site Characterization Plans for High ' evel Waste Geologic Repositories (Proposed Revision 1) 2.

Regul'atory Guide Safety Analysis Report TBD Format Guide r)

C.

STAFF TECHNICAL POSITIONS Staff Technical Positions have been divided into two types: Generic Technical Positions, dealing with issues which relate to licensing activities for repositories independent of the technology or site selected; and Site Technical Positions, which give site specific guidance / advice.

1.-

SITE TECHNICAL POSITIONS (STP'S)

STP's provide a format for establishing the staff's positions on site specific _ issues. The set of STP's for a given site provides a means of tracking and tracing positions taken by the staff.

Issue-oriented Site Technical Positions (ISTP's) are generated in each technical review area (hydrogeology, etc.) for each site.

ISTP's constitute what the staff-considers to be a systematic and comprehensive identification of issues which need to be resolved for licensing. Other detailed STP's are issued as appropriate throughout the pre-licensing period. They establish acceptable methods of analysis, minimum information needs, or acceptable methods of data gathering and form the basis for' tracking issues over time.

The concept of STP's was developed to provide maximum flexibility in completing a series of technical positions that have sufficient formality to record staff positions and to notify the prospective licensee (DOE). STP's (other than ISTP's) will be initiated by the need for documentation of a staff concern or in response to a major question raised by the licensee.

  • Projected issue date for the final guide is March 1987.

5 a)

Issue-oriented Site Technical Positions (ISTP's)

The ISTP's were coordinated with DOE /NRC workshops in individual program areas.

TITLE ISSUE DATE BWIP (i)

Geology / Geophysics (Draft)

September 1984 (ii)

Geochemistry (Draft)

September 1984 (iii) Waste Package (Draft)

September 1984 (iv)

Repository Design / Rock Mechanics (Draft)

September 1984 (v)

Hydrogeology(Draft)

September 1984 NNWSI (i)

Geology / Geophysics (Draft)

September 1984 (ii)

Geochemistry (Draft)

September 1964 (iii) Waste Package (Draft)

September 1984 (iv)

Repository Design / Rock Mechanics (Draft)

September 1984 (v)

Hydrogeology(Draft)

September 1984 SALT (i)

Geology / Geophysics (Draft)

September 1984 (ii)

Geochemistry (Draft)

September 1984 (iii) Waste Package (Draft)

September 1984 (iv)

Repository Design / Rock Mechanics (Draft)

September 1984 (v)

Hydrogeology (Draft)

September 1984 b)

Other STP's BWIP (1)

Hydrology Testing Strategy (Draft)

December 1983 (ii)

In Situ Testing (Draft)

TBD (iii) Hydrazine Testing (Draft)

TBD (iv)

Others as Identified NNWSI (1)

Others as Identified SALT (1)

Others as Identified

G g

r 2.

GENERIC TECHNICAL POSITIONS (GTP'S)

The specific issues that must be addressed in a potential licensing case will be site specific. Therefore, the principal mechanism for documenting guidance is through the site specific guidance described.in the SCA section II.A. above, and in section II.D. (Technical Meetings). Notwithstanding this, some issues can be grouped in generic non-site specific categories. From the experience gained in the consultation process at various sites, the staff is identifying areas where it would be useful to document guidance in this generic fashion.

For the most part, this would involve repetition of staff positions already developed and documented. The following lists generic technical positions already developed or under development. Also listed are technical areas where the staff is tentatively considering developing GTP's.

o Waste Package Reliability Analysis (Final)

December 1985 o Determination of Radionuclide Sorption for HLW January 1986*

Repositories (Draft) o Groundwater Travel Time (Draft)

July 1986 o Borehole and Shaft Seals (Final)

February 1986 o Determination of Radionuclide Solubility in November 1984 Groundwater for Assessment of High-Level Radionuclide Waste Isolation (Final) o In-Situ Testing During Site Characterization (Final)

December 1985 o Design Information Needs in Site Characterization December 1985 Plans (Final) o Seismo-Tectonic Evaluation Methodology (Draft)

TBD o Interpretation and Identification of the Disturbed July 1986 Zone (Draft) o Documentation of Computer Codes, NUREG/CR-0856 June 1983 48FR31761, 7/11/83 o Modeling Strategy Document for HLW Performance July 1984 Assessment o Licensing Assessment Methodology for HLW Geologic July 1984**

Repositories (Draft)

  • Projected Issue Date for the final GTP is January 1987.
    • Projected Issue Date for the final GTP is May 1987.

m

7 TITLE ISSUE DATE o Performance Confirmation TBD o Items and Activities in the HLW Geologic Repository July 1986 Program Subject To 10 CFR Part 60 Quality Assurance Requirements (Draft) o Qualification of Existing Data (Draft)

June 1986 o PeerReview(Draft)

June 1986 D.

DOCUMENTED TECHNICAL MEETINGS The purpose of the technical meetings is to assure that an information flow is maintained between the NRC and DOE which facilitates the accomplishment by each agency of its responsibilities relative to site investigation and site characterization. Technical meetings are held to review data, review and consult on interpretation of data, identify potential licensing issues, agree on the adequacy of methods and approaches for acquisition of information and data as well as available data. Schedules of activities pertaining to these technical meetings will be made publicly available to all interested parties.

A written report agreed to by both NRC and DOE will be prepared for each meeting including agreements reached. The meetings are open to State / Tribal representatives and allow public attendance as observers.

BWIP WORKSHOPS AND TECHNICAL MEETINGS MEETING DATE Hydrology Data Review December 2-5, 1986 Project Management Meeting August 4, 1986 Hydrology Meeting December 9-10, 1985 Exploratory Shaft Design Workshop December 3-4, 1985 Design of Seismic Survey May 23, 1985 Hydrology Workshop May 22, 1985 Management Meeting April 10, 1985 Hydrologic Characterization December 12-13, 1984 QA Visit December 10-11, 1984 Geology Data Review October 22-26, 1984

a 8

BWIP WORKSHOPS AND TECHNICAL MEETINGS (Continued)

MEETING DATE Geology Data Review July 30-31, 1984 Hydrologic Characterization Plans June 12-13, 1984 Barrier Material Test Plan May 8-9, 1984 Geology Workshop March 13-15, 1984 Rock Mechanics Data Review January 23-26, 1984 Hydrologic Data Review January 9-16, 1984 Geochemistry Workshop January 9-12, 1984 Exploratory Shaft and Underground Testing November 29-December 2, 1983 Performance Assessment August 29-September 1, 1983 Technical Management Meeting August 4-5, 1983 Hydrology' Testing July 11-15, 1983 Site Issue Meeting June 13-16, 1983 Hydrology Meeting June 7-10, 1983 Management Meeting May 27, 1983 Geology and Geologic Stability April 11-15, 1983 Repository Design October 5-6, 1982 Hydrologic Modeling of Pasco Basin September 27-28, 1982 Waste Package / Geochemistry August 9-12, 1982 Hydrology July 21-27, 1982 Underground Testing Plans for the SCR June 9-10, 1982 Hydrology January 12-13, 1982 Site Technical and Program Review September 22-26, 1981

=.

9 BWIP WORKSHOPS AND TECHNICAL MEETINGS (Continued)

MEETING DATE

. Site Technical and Program Review July 7-17, 1980 NNWSI WORKSHOPS AND TECHNICAL MEETINGS Management Meeting June 12, 1986 Management Meeting February 19-20, 1986 Exploratory Shaft Design / Construction August 27-28, 1985 Waste Package July 23-25, 1985 Management Meeting March 11, 1985 Sample Acquisition for Topopah Spring Member-February 4, 1985 and Calico Hills Tuff QA Visit December 13-14, 1984 Geology Data Review September 17-28, 1984 Hydrology Data Review July 25-28, 1984

~

Design / Rock Mechanics Data Review July 17-20, 1984 Geochemistry July 10-13,1984 Waste Package October 18-19, 1933 Geology October 4-6, 1983 Hydrology September 20-2i,1983 Hydrology Data Review January 27-28, 1983 Conceptual Design January 24-25, 1983 Hydrology January 18-19, 1983 Geochemistry January 12-13, 1983 4

Site Technical and Program Review May 17-19, 1982 Peer Review of NNWSI August 24-28, 1981 i

l

, Site Technical and Program Review February 16-24, 1981

a h.

10 NNWSI WORKSHOPS AND TECHNICAL MEETINGS (Continued)

' MEETING DATE._

, Sit'e~ Technical and Program Review September 24-25,-1979 Geochemistry and Hydrogeology March 2, 1979 Site Technical and Program Review-February 23-24, 1978 Seismic / Geologic Design Criteria for January 25,:1978 Waste Repository SALT WORKSHOPS AND TECHNICAL MEETINGS Management Meeting June 9-10, 1986 Waste Package January 22-24, 1986 i

Structure and Tectonics of the Palo Duro Basin-Nov' ember 19-21, 1985 Permian Basin Core Examination (Data Review)

August 5-8, 1985 Management Meeting

. June 18,.1985..

_QA Visit Decembe'r 18-19,-1984 Geophysics Data Review (Paradox Basin)

October 16-1,8., 1984 Geochemistry August 22-24, 1984

-Rock Mechanics Data Review-August 21-24, 196'4 s

~Information Management Systems Meeting

-August 8, 1984 Site Security and Safeguards May 23, 1984 Hydrology Data Review May 14-18, 1984 Repository Design, Exploratory Shaft, and October 25-26, 1983

-In-Situ Testing Waste Package Design and' Performance August 9-10, 1983 NRC Guidance on SCP Content June 27-28, 1983 DOE Salt Project Overview April 19-20, 1983 Review of the DOE Site Screening in Salt, May 11-21, 1981

-Paradox Basin (meetings and site visits) i l-

.g

.q 11 s

SALT WORKSHOPS AND TECHNICAL MEETINGS (Continued)

MEETING DATE Survey of Salt Dome Investigations (meetings September 8-19, 1980 and site visits)

GENERIC WORKSHOPS AND TECHNICAL MEETINGS DWPF Vitrification Process, Waste Form and December 9-10, 1986 Supporting Data Base Technical Meeting Waste Acceptance Process Meeting July 31, 1986 Level of Detail in the SCP May 7-8, 1986 Pilot Project Demo / Status of NWPA Program April 29, 1986

.EA Site Ranking Methodology Briefing April 23, 1986-

" Licensing Support System Coordinating Group April 22, 1986 Rod Consolidation December 17, 1985-Generic QA Meeting December 4-5, 1985 Generic Seismo-Tectonics Meeting December 3-4, 1985 Site Characterization Plans--Chapter 8 October 29-30, 1985 Subsystem Performance Allocation September 26-27, 1985 DOE Position Paper on Retrievability and July 31, 1985 Retrieval' Exploratory Shaft Facility Design / Construction, July 18, 1985 Licensing Issues, and the Exploratory Shaft Test Plans

.Q-list Methodology July 1, 1985

' Appendix 7 to Site Specific Agreement--On-Site June 14, 1985 Representatives Activities ManagementMSetingwithDOE May 30, 1985 Design Information Needs for SCP's April 18, 1985 l -

Performance Allocation Meeting April 17, 1985 Review of Report " Recommended Safety, April 11, 1985 Reliability, QA and Management Techniques with Possible Application by DOE to the HLW Repository Program" l

l

a.

12 GENERIC WORKSHOPS AND TECHNICAL MEETINGS (Continued)

MEETING DATE Discussion of NRC Comments on DOE's Draft EA's April 8-9, 1985 DOE Annotated Outline for Site Characterization February 13, 1985 Plans Development of Licensing Issues and Information February 8, 1985 Management Systems QA Site Visits Summary Briefing January 28, 1985

-Briefing on NRC Li. censing Process January 28, 1985 NRC's Comments on DOE Draft Mission Plan December 17, 1984 Preparation for QA Visits to Project Sites November 30, 1984

' Transportation Model Workshop November 27-28, 1984 NRC Licensing Process Briefing to DOE Field November 5-8, 1984 Offices QA Review Plan and Upcoming QA Site Visits October 24, 1984 QA Site Visits Planning Meetings October 18, 1984 September 17, 1984 In-Situ Testing Planning Meeting August 9, 1984 DOE Siting Guidelines April 18, 1984

' Discussion of the OCRWM Mission Plan April 11, 1984 NRC Review Plan of QA for Site Characterization May 12, 1983 E.

ENVIRONMENTAL ASSESSMENT (EA) REVIEWS The staff has reviewed and commented on all DOE's draft and final Environmental Assessments (EA's). These reviews are part of the continuing interface between the staffs of the DOE and NRC which will lead to early identification of potential licensing issues. The staff comments identify open items which are relevant to the potential licensing of each site based on information currently available and which will need to be resolved during site characterization.

NRC staff comments on the DOE Draft Environmental Assessments March 20, 1985

.NRC staff comments on the DOE Final Environmental Assessments December 22, 1986 l

13

~

(

F.

CONTRACTOR REPORTS In' establishing the basis for guidance, the NRC staff periodically.

requires assistance from contractors.

Reports giving. details.of the'results of such assistance are published as NUREG/CR documents.

Some NUREG/CR reports

- are a reflection of results of experimental programs whereas others are technical evaluations utilizing-existing expertise and data..The following lists divide these reports into'seven technical review areas and also

~

differentiate reports produced'for the Office of NMSS.from those produced for the Office of Research (RES).

. 1. - - Performance Assessment

' TITLE NUMBER DATE 4

. a)

NMSS

-o Suggested Nuclear Waste Management NUREG/CR-0579 July 1979

-Radiological Performance Objectives i

o SWIFT Self-Teaching Curriculum NUREG/CR-1968 March 1982 o Repository. Site Definition in Basalt, NUREG/CR-2352 March 1982 Pasco Basin, WA o DNET Self-Teaching Curriculum NUREG/CR-2391 March:1983 o PATH 1 Self-Teaching' Curriculum NUREG/CR-2394 October 1982 o NRC Rep' ort on Dosimetry and Health NUREG/CR-2422 March 1983 Effects Self-Teaching Curriculum o Summary of Repository Siting Models NUREG/CR-2782 July 1982 L

(Final Report) o Repository' Site Data Report for Tuff:

NUREG/CR-2937 November 1983 Yucca' Mountain, Nevada 5

o Parameters and Variables Appearing in NUREG/CR-3066 December 1982 Repository Siting Models o Benchmark-Problems for Repository NUREG/CR-3097 December 1982 Siting Models*

i o Parameters and Variables Appearing in NUREG/CR-3160

. June 1983 Radiological Assessment Codes

o A Summary of Computer Codes for NUREG/CR-3209 March 1983 Radiological Assessment
  • Revision to.be published in 1987 1

~.

o 14 a)

NMSS (Continued)

TITLE NUMBER DATE o Evaluation of Engineering Aspects of NUREG/CR-3218 May 1984 Backfill Placement for HLW Deep Geologic Repositories o Technical Assistance for Regulatory NUREG/CR-3235 April 1983 Development: Review and Evaluation of the EPA Standard 40 CFR 191 for Disposal of High-Level Waste o -Verification of the Network Flow and NUREG/CR-3378 June 1984 Transport / Distributed Velocity Method

~(NWFT/DVM) Computer Code o A Summary of Repository Design Models NUREG/CR-3450 November 1983 o Benchmark Problems for Radiological NUREG/CR-3451 August 1983 Assessment Codes o Benchmark Problems for Repository NUREG/CR-3636 February 1984 Design Models o A Summary of Computer Codes for Waste NUREG/CR-3699 April-1984 Package Performance Assessment o SWIFT II Self-Teaching Curriculum NUREG/CR-3925 August 1986 o Repository Site Data Report for NUREG/CR-4110 November 1985 Unsaturated Tuff: Yucca Mt, Nevada o Repository Environmental Parameters NUREG/CR-4134 May 1985 Relevant to Assessing the Performance of HLW Packages o Methodologies for Assessing Long-Term NUREG/CR-4477 January 1986 Performance of HLW Packages o Assessing Compliance with the EPA HLW NUREG/CR-4510 October 1986 Standard: An Overview b)

R_ES o Risk Methodology for Geologic Disposal of Radioactive Waste:

-- Sandia Waste Isolation Flow and NUREG/CR-0424 October 1978 Transport (SWIFT) Mode

-- The Network Flow and Transport NUREG/CR-1190 March 1982 (NWFT) Model

~-- -- -

0

  • 1.

15 b)

RES'(Continued)

TITLE NUMBER DATE

-- Distributed Velocity Method of NUREG/CR-1376 October 1980 Solving Convective-Dispersion Equation

-- Model Description and User Manual NUREG/CR-1636 May 1981 for Pathways Model Vol. 1

-- Sensitivity Analysis of the Vol. 2 May 1981 Environmental Transport

-- Asymptotic Properties of the Vol. 3 May 1981 Environmental Transport

-- Effects of Variable Hydrologic Vol. 4 April 1982 Patterns on the Environmental Transport Model i

-- Dosimetry and Health Effects NUREG/CR-2166 October 1981

-- The DNET Computer Code User's NUREG/CR-2343 April 1982 Manual o User's Manual for the Sandia Waste-NUREG/CR-2324 January 1982 Isolation Flow and Transport Model (SWIFT) Release 4.81 o An Assessment of the Proposed Rule NUREG/CR-3111 August 1983

.(10CFR60) for Disposal of HLW in Vols. 1 and 2 Geologic. Repositories o Data Input Guide for SWIFT II; The NUREG/CR-3162 April 1986 Sandia Waste-Isolation Flow and Transport Model for Fractured Media Release 4.84 o Theory and Implementation for SWIFT II; NUREG/CR-3328 August 1986 The Sandia Waste-Isolation Flow and Transport Model for Fractured Media Release 4.84 o Preliminary Scenarios for the NUREG/CR-3353 November 1983 Release of Radioactive Waste from a Hypothetical Repository in Basalt of the Columbia Plateau o The Role of Geochemical Factors in the NUREG/CR-3490 March 1984 Assessment and Regulation of Geologic Disposal of High-Level Radioactive Waste o Reliability of Geotechnical, NUREG/CR-3494 November 1983 Environmental, and Radiological Instrumentation in Nuclear Waste Repository Studies I

r i

  • 1

-16 w

b)

RES-(Continued)

TITLE.

NUMBER DATE o 0n the Development of Environmental NUREG/CR-3714 July 1984 Radiation Standards for Geologic

. Disposal of High-level Radioactive Waste o Uncertainties in Long-Term Repository -

NUREG/CR-3832 August 1984 Performance Due to the Effects of Future Geologic Processes

'o Climatic Calibration of Pollen Data NUREG/CR-3847 June 1984 o A Three-Dimensional Computer Model to NUREG/CR-4042 January 1985 Simulate Fluid Flow and Containment Transport Thru a Rcch Fracture System o Critical Parameters for a High-Level NUREG/CR-4161 May 1985 Waste Repository--Vui. 1: Basalt

-NUR G C -E / R 4748 October 1986 o Permeameter Studies of Water Flow Through Cement and Clay Borehole Seals in Granite, Basalt and Tuff 2.

Hydrology-a)

NMSS o An Appraisal of Nuclear Waste Isolation NUREG/CR-3158 October 1983 in the Vadose Zone in Arid and Semiarid Regions (with Emphasis on the NTS) b)

RES o Field and Theoretical Investigations of U of AZ Report February 1982 Mass and Energy Transport in Subsurface Materials o Unsaturated Flow and Transport Through NUREG/CR-3206 March 1983 Fractured Rock Related to HLW-Repositories o Pressure Testing of Fractured Rocks--

NUREG/CR-3213 July 1983 A Methodology Employing 3-Dimensional Cross-Hole Tests o Prediction of Far-Field Subsurface NUREG/CR-3612 March 1984 Radionuclide Dispersion Coefficients

'from Hydraulic Conductivity Measurement 4

s a

17

",}

X b)

RES(Continued)

' TITLE NUMBER DATE o Relationship Between the Gas NUREG/CR-3680 April 1984 Conductivity and Geometry of a

. Natural Fracture o Field and Theoretical Investigations NUREG/CR-3736 August 1985 of Fractured Crystalline Rock Near Oracle, Arizona 3.

Geochemistry

.a)

NMSS o Proceedings of the Conference on the NUREG/CP-0062 June 1985 Application of Geochemical Models to High-Level Nuclear Waste Repository Assessment o Selected Hydrologic and Geochemical NUREG/CR-2983 January 1983 Issues in Site Characterization for Nuclear Waste Disposal; Flood Basalts at the Hanford Reservation o Status of Geochemical Problems Relating NUREG/CR-3062 March 1983 to the Burial of High-Level Radioactive

. Waste, 1982

.o Evaluation of Radionuclide Geochemical NUREG/CR-3730 March 1984 Information Developed by DOE High-Level Nuclear Waste Repository Site Projects o Review and Assessment of Radionuclide NUREG/CR-3763 September 1984 Sorption Information for the Basalt Waste Isolation Project Site (1979 through May 1983) o Progress in Evaluation of Radionuclide NUREG/CR-3851 Geochemical Information Developed by 00E (Oct-Dec 1983)

Sep 1984 Vol i High-Level Nuclear Waste Repository Site (Jan-Mar 1984)

Oct 1984 Vol 2 Projects (Apr-Jun 1984)

Feb 1985 Vol 3 (Jul-Sep 1984)

Oct 1985 Vol 4 o Progress in Evaluation of Radionuclide NUREG/CR-4236 Geochemical Information Developed by 00E (Oct-Dec 1984)

Oct 1985 Vol 1 High-Level Nuclear Waste Repository Site (Jan-Mar 1985)

Dec 1985 Vol 2 Projects (Apr-Jun 1985)

Apr 1986 Vol 3 Annual Report (Oct 84-Sep 85)

Jul 1986 Vol 4

q;q +.

C

18 -

'b)

RES TITLE NUMBER DATE o NRC Nuclear Waste Management NUREG/CP-0052 May 1984 Geochemistry 1983-

- o Uncertainties in Geologic Disposal NUREG/CR-2506 July 1983 of HLW - Groundwater Transport of Radionuclides and Radiological Consequences o Valence Effects on Adsorption: A NUREG/CR-2863 February 1983

-Preliminary Assessment of the Effects of Valence State Control on Sorption o Radionuclide Migration Around Uranium NUREG/CR-3941 October 1984 Ore Bodies--Analogue of Radioactive Waste Repositories o Valence Effects on Solubility and NUREG/CR-4309 March 1986 Sorption-o Temperature Effects on the Solubility NUREG/CR-4582 June 1986 and Speciation of Selected Actinides 4.

Design / Rock Mechanics a)

NMSS o Survey of Existing Underground Openings LBL-12600 April 1981 for In-Situ Experimental Facilities o Experiments, Conceptual Design, LBL-13190 September 1981 Preliminary Cost Estimates and Schedules for an Underground Research Facility o Information Base for Waste Repository NUREG/CR-0495 March 1979 Design Vols. 1-7 o Identification of Characteristics Which NUREG/CR-2613 April 1984 Influence Repository Design--Dom 21 Salt o -Identification of Characteristics Which NUREG/CR-2614 April 1984 Influence Repository Design--Tuff o Evaluation of Alternative Shaft Sinking NUREG/CR-2854 March 1983 Techniques for HLW Deep Geologic Repositories

01 e.

ig s

j a)

NMSS(Continued)

TITLE NUMBER DATE o Thermal Impact of Waste Emplacement NUREG/CR-2910 March 1983 and Surface Cooling Associated with Geologic Disposal of Nuclear Waste o RelatioFship of an In Situ Test Facility NUREG/CR-2959 March 1983 to a Deep Geologic Rapository for HLW o In Situ Test Programs Related to Design NUREG/CR-3065 March 1983-and Construction of HLW Deep Geologic Vols. I and 2 Repositories o Assessment of Retrieval Alternatives NUREG/CR-3489 May 1984 for the Geologic Disposal of Nuclear Waste o Parameters and Variables Appearing NUREG/CR-3586 January 1984 Repository Design Models b)

RES o Rock Mass Sealing--Experimental NUREG/CR-3473 September 1983 Assessment of Borehole Plug Performance, Annual Report, 6/82-5/83 o Axial Strength of Borehole Plugs in NUREG/CR-3594 December 1983 Granite and Basalt o Experimental Assessment of Borehole NUREG/CR-4641 June 1986 Wall Drilling Damage in Basaltic Rocks o Rock Mass Sealing--Experimental NUREG/CR-4642 June 1986 Assessment _of Borehole Plug Performance, Annual Report, 6/84-5/85 o Size Influence on the Sealing NUREG/CR-4738 September 1986 Performance of Cementitious Borehole Plugs 5.

Waste Package a)

NMSS o Proceedings of Conference on High-Level NUREG/CP-0005 December 1978 Radioactive Solid Waste Forms, December 19-21, 1978 at Denver, C0 o Container Assessment--Corrosion Study NUREG/CR-2317 1981-1982 of HLW Container Materials (Quarterly i

Progress Reports) l

- =. - - - -.. -.

20 o

a)

NMSS(Continued)

' TITLE NUMBER DATE o Nuclear Waste Management Technical NUREG/CR-2333 February 1982 Support in the Development of Nuclear Vol s. 1-3 Waste Form Criteria for the Nuclear Regulatory Commission o Review of DOE Waste Package Program NURE6/CR-2482 Feb 1982 Vol 1

-- National Waste Package Program (Parts 1 and 2)

Apr 1983 Vol 2 (Apr 82 Sep 82)

Mar 1983 Vol 3-(Oct 82-Mar 83)

Sep 1983 Vol 4 (Apr 83-Sep 83)-

Aug 1984 Vol 5 (Oct 83-Mtr 84)

Mar 1985 Vol 6 (Apr 84-Sep 84)

Mar 1985 Vol 7 (Oct 84-Mar 85)

Dec 1985 Vol 8 (Apr 85-Sep 85)

Dec 1985 Vol 9 o Packing Material Testing Required to NUREG/CR-275i January 1983 Demonstrate Compliance with 1000-Year Radionuclide Containment o Review of Waste Package Verification NUREG/CR-3091 Tests, Semi-Annual Report (Apr 82-Sep 32)

Apr 1983 Vol 1 (Oct 82-Mar 83)

Aug 1983 Vol 2 (Apr 83-Sep 83)

Feb 1984 Vol 3 (Oct 83 'iar 84)

Jul 1985 Vol 4 (Apr 84-Sep 84)

Jul 1985 Vol 5 (Oct 84-Mar 85)

Oct 1985 Vol 6 (Apr 85-Sep 85)

Jan 1986 Vol 7 o Waste Package Performance After NUREG/CR-3219 Repository Closure Vol. 1 July 1983

-- Post-Emplacement Monitoring Vol. 2 May 1983 o Waste Package Reliability NUREG/CR-4509 February 1986 o Stress Corrosion Cracking Tests on NUREG/CR-4619 June 1986 HLW Container Materials in Simulated Tuff Repository Environments b)

RES o Solidification of High-Level NUREG/CR-0895 July 1979 Radioactive Wastes o Long-Term Performance of Materials NUREG/CR-3427 Used for HLW Packaging (Apr83-Jun83)

Aug 1983 Vol 1 (Jul 83-Sep 83)

Dec 1983 Vol 2 (Oct 83-Dec 83)

Mar 1984 Vol 3 (Annual Report)

(Apr83-Apr84)

Jun 1984 Vol 4

g 21 b)

RES.(Continued)

TITLE NUMBER DATE o Long-Term Performance of Materials NUREG/CR-3900 Used for HLW Packaging (Apr 84-Jun 84)

Sep 1984 Vol 1 (Jul 84-Sep 84)

Jan 1985 Vol 2 (Oct 84-Dec 84)

May 1985 Vol 3 (Annual Report)

(Apr 84-Apr 85)

Jul 1985 Vol 4 o Long-Term Performance of Materials NUREG/CR-4379 Used for HLW Packaging (Apr 85-Jun 85)

Sep 1985 Vol 1 (Jul 85-Sep 85)

Jan 1986 Vol 2 (Oct 85-Dec 85)

Mar 1986 Vol 3 (Annual Report)

(Apr 85-Mar 86)

Jun 1986 Vol 4 o Fracture in Glass /HLW Canister NUREG/CR-4198 May 1985 o Investigation of the Stability of NUREG/CR-4585 March 1986 Clay / Basalt Packing Materials 6.

Geology / Geophysics a)

NMSS o High-Level Waste Repository Site NUREG/CR-0578 July 1979 Suitability Study--Status Report o Information Needs for Characterization NUREG/CR-2663 July 1985 of High-Level Waste Repository Sites Vols. I and 2 in Six Geologic Media o Repository Site Data and Information in NUREG/CR-3129 November 1983 Bedded Salt:

Palo Duro Basin, Text s o Effects of Earthquakes on Undergrcund NUREG/CR-4609 June 1986 Facilities: Literature Review and Discussion b)

RES o Indirect Rock Mass Investigations for NUREG/CR-3143 Optimizing Borehole Ort 111ng Programs

--Executive Summary Vol. 1 October 1983

--Summary of Wave Propagation Vol. 2 November 1983 Geophysical Techniques

--Ray Optic Geotomography Vol. 3 October 1983

--Wave Diffusion Geotomography Vol. 4 October 1983

o T,

y

' ';~

22 b)

RES(Continued)

- TITLE NUMBER DATE o Geomorphic Controls on the Management NUREG/CR-3276 October 1983 of Nuclear Waste.

o Crosshole Geophysical Methods Used to-NUREG/CR-3758 August 1984 Investigate the Near Vicinity of High Level Waste Repositories 7.

Quality Assurance a)

NMSS o Recommended Safety, Reliability, QA NUREG/CR-4291 July 1985 and Management Aerospace Techniques with Possible Application by DOE to the HLW Repository Program o QA Plan for Computer Software Supporting NUREG/CR-4369 January 1986 the U.S. NRC's HLW Management Program G.

STATE / TRIBAL INTERACTIONS NWPA Section 117(a) states that NRC must provide the states and Indian tribes timely and complete information regarding its determinations or plans made regarding siting, development, or design for licensing, construction, operation, regulation, or decommissioning. A summary of NRC's recent efforts is discussed below.

In a continuing effort to keep the states and tribes involved, the Commission has held several public meetings during the last few years, i.e., state / tribal comments on DOE's proposed siting guidelines, NRC's final concurrence decision on the DOE guidelines, a 9/6/85 meeting on Section 114(f) of the Act

(" Preliminary Determination" issue), and a 1/24/86 meeting on proposed

- amendments to 10 CFR 60, Licensing Procedures.

Staff have made numerous presentations to the states and tribes on current NRC activities in the NWPA process. Recent examples are meetings with Nevada officials in May and August 1986, a quarterly meeting with states / tribes in Oregon, August 1986, and a crystalline states meeting in December 1986.

- The NRC/ DOE Interagency Coordinating Committee on the Licensing Support System continues to meet, with active state / tribal participation.

Copies of significant HLW documents are sent routinely to state / tribal contacts, and notices of availability are sent to numerous interested parties.

A weekly notice of NRC/ DOE upcoming meetings, both tentative and firmly established, is sent to state / tribal representatives.

In addition, these upcoming meetings are also announced on a toll free telephone recording for use by the general public.

.,--,,,,n,.,-...-e-

~

,.---,wv.,---_.,

v-,

um n,,m.,

c L

23 H.

PROGRAM PLANNING AND MANAGEMENT REVIEWS TITLE ISSUE DATE

'NRC comments on the DOE Draft Mission Plan July 31, 1984 NRC comments on the DOE draft report to the President, Oct. 5, 1984 An Evaluation of Commercial Repository Capacity for

-Disposal of Defense High-Level Waste SECY-84-449, Recommendations of-the DOE Panel on Alternative Nov. 26, 1984 Means of Financing and Managing Radioactive Wastes (AMFM)

NRC comments on the DOE Project Decision Schedule, Mar. 4, 1985 Preliminary Draft Staff comments to the Chairman on DOE AMFM Mar. 8,1985 NRC comments on the Draft DOE Project Decision Schedule Oct. 24, 1985 NRC comments on level of detail in Section 8.3 of the DOE Dec. 12, 1985 Site Characterization Plan Report on Section 10 of draft Project Decision Schedule Dec. 16, 1985 transmitted from NMSS to DOE NRC comments on DOE Monitored Retrievable Storage (MRS)

Feb. 5, 1986 Facility SECY-86-66, Status of Activities Under the Nuclear Waste Feb. 26, 1986 Policy Act of 1982, to Commission Joint NRC/ DOE Notice of Technical Assistance issued Apr. 3, 1986 10 CFR Part 72 revisions concerning licensing of the MRS May 23, 1986 published in the Federal Register SECY-86-92, Proposed Revisions to 10 CFR Part 60 to Conform June 19, 1986 to EPA Standards published Briefing Notes, Status of Activities Under the Nuclear Waste July 15, 1986 Policy Act of 1982, to Commission III. NRC REVIEW PLANS Review Plans document the proceJure which will be used by the staff in reviewing major documents submitted by the DOE. They identify the questions that will be asked and the independent analysis that will be performed by the staff. The primary purpose of review plans is to standardize and organize the staff's review of licensing documents.

They provide, indirectly, guidance to the licensee in terms of the kinds of data and information that is expected in

L.

24 e

documents such as SCP's. They also provide useful information to interested parties'about how NRC is doing its job. Draft review plans for SCA's, for Quality Assurance programs, and for Environmental Assessments have been written. Other review plans, such as the Review Plan for an Application for a

' Construction Authorization, will be prepared as needed.

TITLE ISSUE DATE Standard Review Plan for Site Characterization Plans August 1983 (Draft)

Review Plan for Quality Assurance Programs for Site June 1984 Characterization of High Level Nuclear Waste Repositories Standard Review Plan for Draft Environmental Assessments January 1985 Standard Review Plan for Final Environmental Assessments March 1986 AVAILABILITY OF INFORMATION HLW documentation, including NUREG/CR reports, received by WM and generated by WM and its contractors is routinely sent to NRC's Public Document Room (PDR), 1717 H Street, NW, Washington, DC, Telephone 202/634-3273. Contact the PDR for information and copies of NRC's HLW correspondence.

BWIP documentation is routinely sent to a Local Public Document Room--

the Richland Public Library, Richland,**lashington. Other local public document rooms will be established in the future.

Copies of NUREG/CR's can be obtained by contacting Superintendent of Documents, U.S. Government Printing Office, P.O. Box 37082, Washington, DC 20013-7082, ATTN: Ann Butler.

FOR ADDITIONAL INFORMATION, CONTACT:

Ms. Linda Luther Division of Waste Management U.S. Nuclear Regulatory Commission Mail Stop 623-S5 Washington, DC 20555 Telephone 1/800/368-5642, Ext. 74426, or 427-4426 for Washington, DC area callers.

.g

/

91,,

UNITEJ STATES

'C 8

NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 206M5 o,

, y.....

JAN 211987 WM Recer file WM Proixt

/

//

~

Doc!tet No.

PDR y 01stdby!!ote kM93J9.Y@t023JS) L__

TO: ALL INTERESTED PARTIES The attached document entitled " Selected NRC Products - High-Level Waste Program" dated January 1987 is being distributed for your information.

Sincerely,

{

M Eileen T. Tana, Irogram Assistant Repository Projects Branch Division of Waste Management 1

27020 (5 / N w==mmen==rc=r2mm.-=g N

J