Summary of 990407 Meeting with Us Enrichment Corp in Rockville,Md Re Licensee SAR Update & Chapter 3, Facility & Process Description. Meeting Agenda & List of Attendees, Encl
ML20206A443
Person / Time
Site: Portsmouth Gaseous Diffusion Plant, 07007001
Issue date: 04/23/1999
From: Cox C
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Pierson R
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
NUDOCS 9904280168
Download: ML20206A443 (10)


Text

_ . _ _ . - ____ _- _ ________-_ -___ _ __ - _______ _ _ ._

t April 23. 1999 MEMORANDUM TO: Robert C. Pierson, Chief Special Projects Branch Division of Fuel Cycle Safety and Safeguards, NMSS FROM: Charles Cox, Mechanical EIystems Engineer M Enrichment Section Special Projects Branch Division of Fuel Cycle Safety and Safeguards, NMSS I

SUBJECT:

MEETING

SUMMARY

- USEC SAFETY ANALYSIS REPORT _

UPDATE AND CHAPTER 3 On April 7,1999, Nuclear Regulatory Commission (NRC) staff met with staff from the U.S.

Enrichment Corporation (USEC) at NRC Headquarters in Rockville, Maryland. An agenda for the meeting was provided, Attachment 1, *USEC S ARUP/ CHAPTER 3 Agenda." The meeting participants (Attachment 2) discussed the progress of the Chapter 3,

  • Facility and Process Description," rewrite program including the level of detail appropriate for safety systems, safety-related systems, and non-safety systems. M accordance with an earlier proposed schedule, and specific examples on how the system walkdown criteria was applied. I I

Next on the agenda, was the discussion on the revised approach to the Safety Analysis Report -

update (SARUP) process previously discussed on February 17,1999. The staff reviewed a table of compensatory actions (Attachment 3) that the Paducah and Portsmouth facilities were taking while the SARUP review process was ongoing. Those compensatory actions were to ensure any safety or safety-related system newly identified by the SARUP was able to complete its intended safety function as identified in the SARUP. USEC provided a milestone schedule (Attachment 4), for discussion. The proposed end date for the new submittal for both facilities was the end of July 1999. The final discussion was about whether or not Compliance Plan issue 2, " Update the Application Safety Analysis Report," was required to be reopened and if the Chapter 3 rewrite should be included in the issue or sbrold the NRC staff continue with the amendment request which added the Chapter 3 rewrite as a Certificate Condition. The USEC staff stated their case for not reopening the Compliance Plan issue. The NRC staff stated they would reconsider the issue and if it was determined that reopening the issue was necessary, the NRC staff would notify USEC in writing.

Attachments: 1. Meeting Agenda

2. List of Attendees
3. Table 2 & 3, PGDP/ PORTS Difference Details
4. SARUP Revisions, Status as of April 7,1999 k.

Dockets 70-7001, 70-7002 y

nd K Brlen[R han ^ YFarar J ccone OFC SPB SPB SPB NAME h toadey MG iow on

_DATE 4//f /99 4 4/N /99 4/ /99 C = COVER E = COVER & ENCLOSURE N = NO COPY gdmtSmch3.wpd omCIAL RECORD COPY 9904200168 990423 '

PDR ADOCK 07007001 C PM ,

IJSEC SARUP/ CHAPTER 3 Agenda e CHAPTER 3

  • Discussion on provided samples PAD Withdrawal System Description Level of Detail e Schedule Apparent schedule slippage Any impact on SARUP 3/30/98 CAR amendment request
  • Walkdown Criteria Specific examples on how the criteria has been applied e GDP SARUP
  • Review 5/28/98 Table with status and effectiveness of Supplementary Actions e X-342 A and X-344-A Sprinkler System TSR e Bases for Proposed August 31,1999 Completion Date Intermediate Milestones and Deliverables
  • Discussion on Re-opening Compliance Plan issue 2 e

SUMMARY

NRC Actions USEC Actions l

l Attachment 1 i

7-NRC ATTENDANCE SPc.ET MEETING: fr;/2c(p ///,/<,/v;e , DATE: </'/ '7[9 7 Name Affiliation Phone O An l* bX 8/inf/Fr5 r Id/ #// i (75#

kugi fvao t.,vas So2 44I b6I6

$){\laqhar _-

t Mtti 7V0417'Y7Ci NARK ofM ()SEC, DI B V ~ W EHeJc. 2cyth 05Ec 30 ' ' *I ~ 3* '

yrggg m g a e uscc_. 301 - sH-n co C ela ac S Uou n Al k Jol- dis-DK

/kh b (Au N SOE NaI .S >>ii & fifl C- ._

Rogcar fe ew NRc / sea

  • l -4 'r- 7 i12 If m a %n u nt ( seis sc i- s u s -?It s 1

l

NRC ATTENDANCE SHEET MEETING: $fi RL(' f/t i l< ce[e;g j DATE: '((7((f Affiliation Phone Name bi hh[kT h\(b5Q UhPPd f M M ! f G f f'E b M9161 Yadas Pea a pac (rsos 1*19K-ells

%-Ta  % ^) RClFSPr3 MI - d~$l' 1

.__7___

Table 2. PGDP Difference Details.

Completion Item Difference Supplemental Action (s) Cate i SARUP classifies the process building

  • Imtiate classification change process 5/28/98 siding and roof as AO
  • Baseline survey of siding and roof 6/25'98 Priority work requests for corrective 6/25,98 actions Maintenance performed with rigor of 6/25i98 formal work packages 2 SARUP classifies the motor load -

Initiate classification change process 5/28,98

( indicators (MLis) as AQ and identifies -

MLi functional check following cell 6/25/98 TSR LCOs startup

+

ML!in each process building ACR

  • Implement TSR-like LCOs 6/25,98 Total cell MLI in CCF (C-300)
  • Priority work requests for corrective 6/25,98 ML! for high-speed compressors in actions C-315 and C-331 -

Maintenance perfe a with rigor of 62598 formal work packages 3 SARUP classifies UF,, equipment -

Initiate classification change process 5/28A8 housings as AQ -

Baseline survey of housings prior to 6,25,98

- Housings over cells and operations above atmospheric pressure interbuilding compressors (intended -

Priority work requests for corrective 6<25 98 for operation above atmospheric actions pressure)

  • Maintenance performed with rigor of 6/25,98 formal work packages 4 SARUP classifies UF compressor motor -

Initiate classification change process 5/28,98 '

manual tnp (CMMT) as Q and identifies -

Periodic functionality requirements 6<25,98 TSR LCOs

  • Implement TSR-like LCOs 6/25/98

+ CMMT from ACR for C-331,-333. -

  • Priority work requests for corrective 6/25/98 335, and -337 (class change only) actions

- CMMT from CCF for C-331,-333. - -

Maintenance performed with rigor of 6/25/98 335. and -337 (new) formal work packages CMMT from ACR and C-331 for C-315 high-speed compressors (new) 5 SARUP classifies UF, high pressure .

Initiate classification change process 5/28/98 relief as AQ

  • Priority work requests for corrective 6/25/98 Freezer / sublimer high pressure relief actions UF./ coolant separation high pressure -

Maintenance performed with rigor of 6/25/98 relief formal work packages Withdrawal compressor coolant high pressure relief Attachment 3 5/28/98 35 U.._S _E C 1

q ,

l. '

Table 2. PGDP Difference Details.

l Completion l Item Difference Supplemental Action (s) Date l 6 SARUP classifies process building cranes -

Initiate classification change process 5/28/98 as AQ -

Prevent heavy loads above or around 6/25/98 L + Crane rails and structural supports equipment operating above atmospheric for C-310. -315. -333. -337 normally pressure parked ovsr unit bypass piping or

  • Priority work requests for corrective 6/25/98 Normetex pumps (class change) actions a All process building cranes i:t C-310. -

Maintenance performed with rigor of 6/25/98

-315,-331. -333, -335, and .337_ fonnal work packages (Operational limits) 7 SARUP restricts filling of a cylinder . Implement administrative control 6/25/98 when >40 pound discrepancy between restricting cylinder fill shipper and receiver weights 8 SARUP identifies preventative controls -

Cylinder handler operators to carry 6/25/98 to minimize the potential for a large fire: radios for communication with

- Controlling flammaole and emergency personnel combustible materials in cylinder -

Caution tag tube oil delivery system Complete yards valves requinng administrative control

- Daily inspections of cylinder implementation (also a SARUP Table 1 l

handling equipment compensatory action) j . . Commuttications capability between

,. cylinder handler operators and emergency personnel

- Administrative controls prior to and during tube oil deliveries at C-333 and C-337 9 SARUP identifies cylinder cart rail stops

  • Initiate classification change process 5/28/98 l as Q:

Priority work req"rsts for corrective 6/25/98

. Rail stops in C-310 and C-315 at the actions head of the cylinder scales in -

Maintenance performed with rigor of. 6/25/98 withdrawal stations formal work packages 10 SARUP identifies a design feature for

  • Initiate classification change process for 5/28/98 l

liquid UF. ledling cranes to prevent new components movement of crane upon release of

  • Priority work requests for corrective 6/25/98
controls actions

! +

. Maintenance performed with rigor of 6/25/98 formal work packages 11 SARUP identifies a TSR LCO for the

  • Implement TSR like LCOs 6/25/98 high cylinder pressure system in C 333-A, C-337 A, and C-360 S/28/98 36 US.%c EC, l I

I l

T/ .

l

Table 2. PGDP Difference Details.

l l

I Completion iteam Difference Supplemental Action (s) Date 12 SARUP clat,sifies Buildings C-300, C- -

Initiate classification change process 5/28/98

, 310-A, and C-360 as AQ -

Priority work requests for corrective 6/25/98 l -

Structural integrity (foundations, actions base plates, building frames, column -

Maintenance performeo with rigor of 6/25/98 j anchorages, load bearing walls, etc.) formal work packages 13 SARUP requires that cylinders -

Require inspection for damage 6/25/98 containing UF.> 1 wt*'.2"U be: following canhquake

- Inspected annually

- Spaced such that inspections can detect damage or corrosion

- Stored off the ground in saddles that preclude rolling

- Inspected for damage following canhquake l

l l

l- 5/28/98 37 U.SEC -

l. .

rm .

Table 3. PORTS Difference Details.

! Completion item Difference Supplemental Action (s) Date 1 SARUP classifies the process building

  • Initiate classification change process 5/28/98 siding and roof as AQ_ -

Baseline survey of siding and roof 6/22/98 Priority work requests for corrective 6/25A8 actions Maintenance performed with rigor of 6/25/98 formal work packages 2 SARUP classifies the motor load

  • Initiate classification change process 5/28/98 indicators (MLis) as AQ and identifies -

MLI functionalcheck following cell Complete TSR LCOs startup

- MLI in each process building ACR -

Implement TSR-like LCOs 6/25/98

- Total cell MLI in PCF -

Priority work requests for corrective 6/25/98 actions Maintenance performed with rigor of 6/25A8 formal work packages 3 SARUP classifies UF. equipment -

Initiate classification change process 5/28,98 housings as AQ -

Baseline survey of housings prior to 6/25 98

- Housings over cells ("000". "00") operations above atmospheric pressure and interbuilding compressors -

Priority work requests for correctis e 6/25,98 (intended for operation abos e actions atmospheric pressure) -

Mainter:ance performed with rigor of 6/25,98 formal work packages 4 SARUP classifies UF compressor motor -

Initiate classification change process 5/28/98

Periodic functionality requirements 6/25/98 TSR LCOs -

Implement TSR-like LCOs 6/25/98 Priority work requests for corrective 6/25/98 actions Maintenance performed with rigor of 6/25i98 formal work packages 5 SARUP classifies process building cranes -

Initiate classification change process 5/28/98 that service "000" and "00" equipment as AQ 6 SARUP classifies cylinder cart rails stops -

Initiate classification change process 5/28/98 as Q - Priority work requests for corrective 6/25/98 actions Maintenance performed with rigor of 6/25/98 formal work packages 5/28/98 38 A . .U _ S _E C

1

  • ~ ,

, 1 Table 3. PORTS Difference Details. <

Completion item Difference Supplemental Action (s) Date 7 SARUP identifies a design feature for -

Initiate classification change process for 5/28/98 liquid UF. handling cranes to prevent new components movement of crane upon release of -

Implement TSR-like LCOs 6/25/98 controls -

Priority work requests for corr':ctive 6/25/98 actions a

Maintenance performed with rigor of - 6/25/98 formal work packages 8 SARUP classifies Buildings X-300, X- +

Initiate classification change process 5/28/98 720, and XT-847 as AQ .

Priority work requests for co Tective 6/25/98

.' Structural integrity (foundations, actions base plates, building frames, column -

Maintenance performed with rigor of 6/25/98 anchorages, load bearing walls, etc.) formal work packages 9 SARUP classifies scale carts and rail cars -

Initiate classification change process 5/28/98 as Q

  • Baseline survey of siding and roof 6,25/98 Priority work requests for corrective 6/25/98 actions Maintenance performed with rigor of 6,25/98 fonnal work rackages SG8/98 39 U. SEC

f..

>..,4 l

SARUP Revisions l Status as of April 7,1999 Current Activity Forecast Paducah Submit 1st Set of Question Responses Mid-April l

Complete PSOA Revisions End-April Submit 2nd Set of Question Responses End-April Submit SARUP Changes for Cascade & BOP Mid-June i

Submit SARUP Changes for Feed and Toll Transfer & Sampling Early-July 1 l

Submit SARUP Changes for Withdrawal Mid-July Submit any R.emaining SARUP Changes and Question Responses End-July l ,

Portsmouth l Submit 1st Set of Question Responses Mid-April l

l Complete PSOA Revisions End-April Submit 2nd Set of Question Responses and NCS-Related TSRs End-April '

Submit TSRs With No Comparable SARUP TSRs and Mid-May Changes to SARUP Cascade TSRs Submit Changes to SARUP Autoclave TSRs, Withdrawal TSRs, End-May 1 and Section 3.8 Submit Changes to SARUP Chapter 4 Mid-June Submit any Remaining SARUP Changes and Question Responses End-July Attachment 4 i