Forwards Description of Drawings to Be Maintained as-configured for Facility.Info Important Aspect of TVA Drawing Control Program.New Commitments Made in Encl
ML20206A223
Person / Time
Site: Sequoyah 
Issue date: 04/01/1987
From: Gridley R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8704070451
Download: ML20206A223 (9)


Text

.

TENNESSEE VALLEY AUTHORITY SN 157B Lookout Place APR 011987 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Gentlemen:

In the Matter of

)

Docket Nos. 50-327 Tennessee Valley Authority

)

50-328 SEQUOYAH NUCLEAR PLANT - DRAWINGS TO BE MAINTAINED AS-CONFIGURED

References:

1.

T'/A letter from me to B. J. Youngblood dated February 27, 1987, "Sequoyah Nuclear Plant - Draft Safety Evaluation Report - Design Baseline and Verification Program" 2.

TVA letter from me to Dr. J. Nelson Grace dated January 21, 1987, ' Se quoyah Nuclear Plant Unit 2 - Long-Term Drawing Control Program" 3.

TVA letter from me to Dr. J. Nelson Grace dated December 12, 1986, "Sequoyah Nuclear Plant Unit 2 - Restart Program Drawing Update" In accordance with a TVA commitment within reference 1, enclosed is a description of drawings to be maintained as-configured for Sequoyah unit 2.

This information is an important aspect of the TVA Drawing Control Program for Sequoyah, which has been described in references 2 and 3.

For drawing control purposes at Sequoyah, an as-configured drawing is a drawing which depicts the as-built configuration of a component, system, or structure, at a point in time as indicated by date of issue, as shown in the revision block. The details regarding comprehensive scheduling for drawings to be as-configured are still being developed by TVA.

2nclosure 2 consists of new commitments made within enclosure 1.

If you have any questions concerning this issue, please call M. R. Harding at (615) 870-6422.

Very truly yours, TENNESSEE VALLEY AUTHORITY 87040704U1 870401 PDR ADOCK 05000328 P

PDR R.

ridley, irector Nuclear Saf ty and Licensing Enclosures cc: see page 2 i

An Equal Opportunity Employer

1

. U.S. Nuclear Regulatory Commission APR 01587 cc (Enclosures):

Mr. G. G. Zech, Assistant Director Regional Inspections Division of TVA Projects Office of Special Projects U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Sequoyah Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, Tennessee 37379 l

_-,__._._.......,,-._,-___,_....___,_____.,_,,_..-.___.__.-_..m.

~ _ _. _, _.,, - _

ENCLOSURE 1 DRAWINGS TO BE MAINTAINED AS-CONFIGURED AT SEQUOYAH NUCLEAR PLANT CATEGORY l - CONTROL ROOM PRIMARY DRAWINGS There are approximately 884 drawings which are maintained as Control Room Primary Drawings. They are listed in Administrative Instruction (AI)-25, Part I, " Drawing Control After Unit Licensing," are used by Operations to operate tne plant, and are kept in the control room.

All of these drawings will be maintained as-configured.

In addition, the current conf r,uration status will be " red-lined" on the copies kept in the control room until the changes are incorporated on the drawings, in accordance with AI-19, Part IV, " Plant Modifications: After Licensing." These drawings will be updated within 15 days of receipt by the Division of Nuclear Engineering (DNE) of the completed workplan drawings from Modifications in accordance with Sequoyah Engineering Procedure (SQEP)-42,

" Control of CCDs," and SQEP-30, " Control of As-Constructed Drawings."

CATEGORY 2 - SECONDARY SAFETY-RELATED DRAWINGS These safety-related drawings are distinguished by a "Q" designation un the drawing title block and will be maintained in an as-configured status, in accordance with SQEP-30 and SQEP-42, except for drawings such as isometrics, load tables, and bills of material, which are used as input to other drawings and which will be treated as category 4.

These "Q" drawings depict the configuration of the safety-related portions of the plant and are used to design, operate, and maintain the plant. They will be updated within 90 days of receipt by DNE of the completed workplan drawings from Modifications, in accordance with SQEP-42.

lists representative drawing series which contain these drawings.

SQEP-30 will be revised by April 15, 1987, to address these drawings.

CATEGORY 3 - NONSAFETY-RELATED DRAWINGS These drawings depict the configuration of the nonsafety-related portions of the plant. This category only includes those drawings which are deemed necessary to support plant maintenance or modifications or those drawings that TVA chooses to maintain current configuration for convenience. These drawings have no time limits for update; however, a target date of 90 days has been established. They include the non "Q" drawings for the drawing series listed in attachment 1.

This list is being refined as necessary, based upon recommendations from Maintenance, Operations, the disciplines within DNE, Engineering Assurance (EA), and Modifications to ensure that all needed drawings are included.

l

1

" CATECORY 4 - OTHER DESICN DRAWINGS This category includes all other drawings not included above which DNE uses to provide documentation of nonessential features, such as structure locations, or to support other design drawings. These drawings will not be as-configured and will be updated and maintained as-designed, as required by DNE in accordance with Nuclear Engineering Procedure (NEP) 6.1, " Change Control." This category also includes drawings such as isometrics, load tables, and bills of material.

CONFIGURATION OF DRAWINGS a

The Design Baseline and Verification Program (DBVP) subset of primary drawings for unit 2 will be converted into single drawings (Configuration Control Drawings (CCDs)) by the end of the fuel cycle 4 outage l

(reference:

TVA letter from R. L. Gridley to B. J. Youngblood dated December 11, 1986). The drawings in categories 1 and 2 will be upgraded,

.i and the as-designed and as-constructed drawings will be replaced by a

]

single CCD as the drawings are revised on an as-needed basis.

SQEP-17,

" Procedure for Or3gination and Categorization of Configuration Control i

Drawings (CCDs) " controls this process. Category 3 drawings will be maintained in an as-configured status but will not be converted to CCDs.

i Category 4 drawings will be maintained in the current design status to support the design basis, other design drawings, calculations, or other situations requiring as-designed status. As an enhancement to the efforts addressing legibility concerns for Sequoyah drawings (see reference 2),

TVA has a long-team program underway to put all category 1 drawings into I

the Computer-Automated Drafting and Manufacturing (CADAM) system to improve the quality, legibility, and ease of revision.

1 4

i i

S i

i i

ATTACHMENT 1 Page 1 of 4 l

i AS-CONFIGURED DRAWING LIST DRAWING DESCRIPTION 1-34597-CD SERIES CONTRACT #91934 FOXBORO RACKS 3

1-34597-FA SERIES CONTRACT #91934 FOXBORO RACKS 1-34597-FW SERIES CONTRACT #91934 FOXBORO RACKS 1082H70 SERIES CONTRACT #91934 SSPS 10N200 SERIES MISC CIVIL LOCATION PLANS, ETC.

10N300 SERIES HISC STRUCTURES i

14N200 SERIES HISC HEAVY EQUIP 15N400 SERIES YARD LIGHTING j

15N700-899 WIRING CONDUIT & CROUNDING (C & G) 1 16N200 SERIES ARCHITECTURAL PLANS, ETC.

i j

17W200 SERIES D-G GEN ARRANCEMENT i

17W300 SERIES YARD PIPING 17W400-600 SERIES YARD PIPING 1

1 18N200-999 MISC STRUCTURAL STEEL 2445D07 CONTRACT #91934 RVLIS 2445D20 SERIES CONTRACT #91934 RVLIS 28N200-59 STRUCTURAL STEEL PUMPING STATIONS, ETC.

31N200-600 ERCW PUMPING STATION i

34N200-400 ERCW TRVLG SCREENS, STOP LOGS j

35N200-999 ERCW IPS MISC YARD ELECTRICAL 36W200 SERIES ARCH PLANS, ETC.

I 37W300-990 PIPING, HVAC, ETC.

i 37W400-600 SERIES MECHANICAL PIPING I

i

7 i

f i

ATTACHMENT 1 Page 2 of 4 i

AS-CONFIGURED DRAWING LIST DRAWING DESCRIPTION 41N200-899 POWER HOUSE CONCRETE 44N200-349 HEAVY EQUIPMENT DRAWINGS I

45A860, 870 SERIES cLECTRICAL PENETRATION DRAWINGS 45N290 SERIES CRAN COLL RAILS 45N400 SERIES

'0FFICE SERVICE BLDG C & G. LTG i

j 45N500 SERIES 161 KV SWYD i

45N600 SERIES SCHEMATIC DIAGRAMS, KEY DIAC i

j 45N700 SERIES WIRING DIAGRAMS, SINGLE-LINES, SCHEMATICS J

l 45N800 SERIES CONDUIT & GROUNDING CABLE j

45NP SERIES ELECTRICAL NAMEPLATE DRAWINGS 45W1400 SERIES LIGHTING 45W1500 SERIES SWYD, WIRING 45W1600-1700 SERIES CONNECTION DIAG.

I j

45W200 SERIES MISC WIRING DIAG I

45W2600 SERIES CONNECTION DIAG.

I 45W800 SElIES C&G

.i 46W200-600 ARCH, PLANS, DETAILS i

]

47A050, -60 SCRIES HANGER DWG, TYPICAL l

{

47A348 SERIES INSTR SYSTEMS 1

l 47A365, -366 SERIES VLV MARK TAGS 47A368 SERIE.?

VLV MOTOR OPERATOR TAB l

47A370-381 SARIES HVAC FANS, DAMPERS ETC.

i l

i i

~

I

I I

ATTACHMENT 1 Page 3 of 4

)

AS-CONFIGURED DRAWING LIST DRAWING DESCRIPTION 47A400 SERIES SEISMIC SUPPORTS 47A400-499 SERIES TVA PIPE SUPPORT DWGS 47A500-900 SERIES TVA SEISMIC SUPPORT DWGS 47B600-866 I TABS

~

l 47E200 SERIES ENVIRONMENTAL DATA DRAWINGS 47VD400-560 SERIES VALVE DATA SHEET DRAWINGS I

l 47W200 SERIES EQUIP LAYOUT DWGS i

l 47W253 SERIES MECH CONTAINMENT PENETRATIONS 47W2600 SERIES PIPE RUPTURE PROTECTION

'i 47W300 SERIES MECH PIPING 47W400 SERIES MECH PIPING 47W500 SERIES MECH PIPING 47WI600 SERIES I&C i

i 47W610, 611 SERIES CONTROL & LOGIC DIAGRAMS

?

l 47W625 SERIES RADIATION SAMPLING t

47W700 SERIES PLUMBING

}

47W800 SERIES FLOW DIACRAMS 47W900 SERIES HVAC 48N200-1800 SERIES STRUCTURAL STEEL j

q SSN SERIES COMMUNICATIONS DRAWINGS I

l 91QL Q-LISTS (TO DE DEVELOPED) i CONTRACT #930313 DWGS CONTRACT DWGS CONTRACT #838682 DWGS POLAR CRANE CONTRACT DWGS

)

CONTRACT #91934 DWGS CONTRACT DRAWINGS CONTRACT #92120 DWGS CONTRACT DRAWINGS

4 ATTACHMENT 1 l

Page 4 of 4 1

AS-CONFIGURED DRAWING LIST i

i DRAWING DESCRIPTION i

D3060K13-513 SERIES CONTRACT //92784 VENDOR DRAWINGS D3060K13-525 SERIES CONTRACT //92784 VENDOR DRAWINGS D805985B SERIES CONTRACT //92784 VENDOR DRAWINGS I

Hxxxx SERIES HANGER DWGS CONTRACT //92615 HGR DWGS J77-17 SERIES PANEL R-37 i

WELD MAPS i

WEST. DWG //4488D85 WESTINGHOUSE DRAWING WESTINGHOUSE FLOW DIAGRAMS i

NOTE: Drawing series listed as "N" may also contain "W" size denwings or vice versa.

d 6

4 4

s I

a i

i I

i 4

1 l

4 1

i j

l a

h

)

l

ENCLOSURE 2 LIST OF NEW COMMITMENTS FOR SEQUOYAH NUCLEAR PLANT 1.

Revise SQEP-30 by April 15, 1987, to address maintenance of category 2 drawings as-configured.