ML20205S491

From kanterella
Jump to navigation Jump to search
Forwards RHR Pump Wear Ring Surveillance Exam Results, Final Rept,Containing Insp Results Associated W/Eccs Pump Project,Per 870301 Commitment
ML20205S491
Person / Time
Site: Pilgrim
Issue date: 03/31/1987
From: Bird R
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20205S496 List:
References
87-050, 87-50, NUDOCS 8704070042
Download: ML20205S491 (1)


Text

.

1.

b

.0,- -

Executive Offices 800 Boylston street Boston, Massachusetts 02199 Ralph G. Bird senior Vice President - Nuclear March 31,1987 BECO Ltr. #87-050 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 License No. DPR Docket No. 50-293 Submittal of Pilgrim Nuclear Power Station Residual Heat Removal Pump Inspection Results

Reference:

BECo Response to NRC Management Letter 86-41, letter i

  1. 87-039, dated March 1, 1987

Dear Sir:

The attached report contains the inspection results associated with the Emergency Core Cooling System pump project. This submittal fulfills a commitment made in the above referenced letter (Issue 3.B.11).

$h R.G. Bird WGL/la cc:

U.S. Nuclear Regulatory Commission Region I

,631 Park Avenue King of Prussia, PA 19406 Dr. Raj Auluck Office of Nuclear Reactor Regulation Division of Licensing U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda, MD 20814 l

Dr. Martin McBride Senior Resident Inspcctor i

8704070042 870331 PDR ADOCK 05000293 G.

PDR