Text
l l
U.S. NUCLEAR RE ULATORY COMMISION Nac rom uovist Nuvamis p e r n - se v - i r.2.
- f. -
RISPONSe hPt l **'
M '*'"
MESPONSE TO F.~.EEDOM OF G
\\
- INFORMATION ACT (FOIA) REQUEST g
oocm wuveta.s u,me :
l aeovesaa NLe D'
t 9
e,
444.
PART l.
NECOROS RELEASED OR NOT LOCAftD (See cAeceed boses)
No agency records oubrect to the request have been Ir4ated.
No edthtsonal egency recorde sub ect to the request have been located t
Agencs recorde subsect to the request that are edentded e Appendis A
see stready evelable for pubhc mopecten and copymg in the NRC Pubhc Document Ram, 1717 > Street. N W., Washegton. OC Agency recorde subsect to the requoet that are identded m Appendin h
are beng made evadable for pubig mapecten and copyeg m the NRC Public Document Room.1717 H Street. N W., Weemmeton. DC. In a fo6 der under the POIA number and requester name The nimpropretary tro<sen of the proposalies that you egreed to accept in a telephone conversaten vwth a enomber of my stem e now bemg made evodeble for pubhc inspecten and toymg at the NRC Pubhc Document Room,1717 H $treet. N W. Wuhmgton. DC. 6n a foldet under thee FOIA number and requester name.
facioned e lntormaten en how you may obtem eccess to and the cha'Oce for copyeg recorde placed in the NRC Pubhc Document Room,17t7 H Street, N W., Wuhmgton. DC.
Agenty recorde hbiect to the reteet are enclosed Any applicable charge foe copes of the recorde provided and pave'wnt proceJuese are noted in the commente section.
Reconte cubrect to the request he e been refer'ed to another Federal egencytosi for revow and detect response to you in vow of NRC e esecones to the requeet no furtmee action is be.ng taken on appeal letter dated -
PARf it A-INFORMAfl0N WitHHELO PROM PUSLIC OISCLOSURE Certa.e-infoemais>n e the requwed muras is t+ng withheid from pub 6.e d eciosues pureuant to the FOI A esemptione descreed m and for the reesono stated in Part it. ese-tiene S. C. and 0 Any reened portees of tmo docuwte for which eee cart of the record is beng withheid are be.ng made svedabie for pubhrt inspection and copyeg in r
ihe No C Put+c oocu-i Room.17 7 H si<oei, N W., wahmgeon, oC, m a foide, und., thie 70iA numbe, sad req.i., nome Commente 0704070040 070403 POR FO!A DIECCLu7-152 PDR
//
f tv4AfV P1Ctue p'vil>ON Vi stonD V
,cht. ;me-
=-
NRC PORM 484 isen a
+9 es*
Re: F01A-87-152 APPENDIX A RECORDS MAINTAINED AMONG PDR FILES 1.
2/25/83 Inspection and Enforcement Bulletin 83-01, "Ft.ilure of Reactor Trip Breakers - Westinghouse D8-50 to open an Automatic Trip Signal". Accession No. 8212060367, 2.
4/11/83 SECY-83-98E
Subject:
Salem Restart Evaluation. Accession No. 8304220308.
(136pages) 3.
9/13/83 Letter from Uldis Potapous to D.M. Sauter, w/ enclosure of inspection 99900330/83-01, Accession No. 8310030379, (18 pages:
4.
12/13/83 Letter from Uldis Potapous to R.G. Slember, w/ enclosure of inspection 99900404/83-03. Accession No. 8401170318, (15pages) 5.
1/26/84 Letter from Uldis Potapous to D.M. Sauter w/ enclosure of inspection 99900330/83-02.(12pages) 6.
4/30/86 Letter from Gary Zech to T. Christopher w/ enclosure of inspection re Accession No.
8605050290.(port 99901043/85-01, 12pages) 7.
6/11/84 Letter from R2 to ICO de Puerto Rico, Inc., docket 99900831/84-01 with Ins Accession no.
8406290495.(35 pages) pection report.
8.
6/22/84 Letter from T.A. Christopher to Uldis Potapous, subject:
Inspection Reports No. 99900330/8301. Accession No.
8407100152,(2pages) 9.
7/9/84 Letter from T.A. Christopher to Uldis Potapous, subject Docket & Inspection Report 99900831/84-01. Accession No.
8408030037.(5pages)
- 10. 8/27/84 LetterfromGaryZechtoWestinghouse,(referenceresponse of 7/9/84. Accession No. 8408290315.
2pages)
- 11. 9/20/84 Letter from Westinghouse to Gary Zech, subject inspection Report No. 99900831/84 01 Response. Accession No.
8409270333.(3pages) 12.
10/17/84 Letter from Gary Zech to Westinghouse, docket 99900831/84 01, Accession No. 8110190270.(1page)
Re: F01A-87-152 j
i APPENDIX B RECORDS MAINTAINED AMONG POR FILES 1.
4/28/83 Memo to docket file, 9900330, by U. Potapous, subject:
meeting on Reactor Trip Breaker Problems. (3 pages) 2.
9/28/83 Memo from U. Potapous to C.E. Norelius, subject: closeout of AITS No. F03021783 - Potential Failure of DS-416 Circuit Beakers Under Voltage Trip Devices (UUTDs). (2 pages) 3.
10/13/83 Letter from D.M. Sauter to Uldis Potapous, subject:
Response to Inspection Report 99900330/83-01.(5pages) 4.
1/9/84 Letter to D.M. Sauter from Uldis Potapous, response to NRC dated 9/13/83,99900330/83-01.(1page) 5.
1/31/84 Letter from 0.M. Sauter to Ulcis Potapous, reference 99900330/83-01. (1 page) 6.
3/1/84 Letter from Uldis Potapous to 0.M. Sauter, reference 99900330/83-01.(1page) i
_~
Q UNITE] STATES O-t NUCLEAR RE2ULATORY CCMMISSl!N Q
y I v.
t-j' REGION IV k
.y
$11 RYAN PLAZA DRIVE. SulTE 1000 M,,
ARLINGTON. TEXAS 70011 APR 2 81983 MEMORANDUM FOR:
Docket File 99900330, Westinghouse Switchgear Division FROM:
U. Potapovs, Chief, Vendor Program Branch, Division of Vendor and Technical Programs
SUBJECT:
MEETING ON REACTOR TRIP BREAKER PROBLEMS On April 22, 1983, a meeting was held at the Westinghouse Switchgear Division, East Pittsburgh facility between T. Ippolito, R. LaGrange, and U. Potapovs of NRC and Westinghouse personnel identified in the attached attendance list to discuss possible contributing factors to the recent malfunctions of Westinghouse Reactor Trip Breakers with under voltages (UV) devices.
This memorandum addresses primarily the quality assurance and manufacturing process control aspects of the items discussed.
Over the past several years there has been a gradual tightening of QA measures within the Switchgear Division including both procurement and manufacturing controls for Class 1E equipment.
This process is still continuing and some of the recently adopted measures have not yet been finalized in a formal QA program document with implementing procedures.
As an example, during the pre-Salem supply period, the only major difference in procurement of commercial and Class 1E switchgear components was that a certificate of compliance was issued for the 1E devices.
The significance of this certificate was primarily that special care and attention was given to these parts during assembly and testing although no additional processing or inspection requirements were applied or documented for these items as compared to parts manufactured for commercial application.
Nuclear orders (1E) could be identified by "YN" designation in the order number.
This designation, however, was applied to the entire switchgear assembly and not necessarily to the UV devices.
During the manufacturing and assembly of these devices all inspections including dimensional were performed on a sampling basis only.
(NOTE:
At least some of the recent functional problems were directly attributed to improper dimensions).
During the " post-Salem" period, the following changes were instituted in the procurement and manufacturing practices for 1E " equipment:
f g /l- &7-6 A 3//.
(@
-g3cSolcyzo
1 Memo to Docket File
. 1.
Batch parts traceability system adopted for man specific orders.
No preassembled shelf items used.
2.
approving design and dimensional changes (NOTE: Req i {-)
effective configuration control). unseated shaft retaining rings, i
3.
Critical dimensions identified for individual parts and assemblies which are required to be 100% inspected during the manufacturing pro for Class 1E components.
t While the above changes are reportedly being implemented, formal Q procedural modifications have not been completed at this time for all of thes ram /
items.
Additionally, based on a policy letter dated April Westinghouse Nuclear Service Integration Division (NS 21, 1981, all orders for i
by utilities or others directly with the Switchgear Division are returned tall i
the originator with instructions to reorder through NSID who then provid o
a technical /QA overview for the procurement of these items.
es Switchgear Division essentially as an outside vendor in the procurement NSID treats the in that they conduct QA audits, product surveillance audits process releases for specific items prior to the shipment of these items to the u and execute QA Historically, all DB undervoltage devices (manufactured from 1950'on) since 1970) have been assembled at the Puerto ve been Division providing the overall QA management function.
In summary, it would appear that the outlined changes in the manu and QA program, if properly implemented should provide reasonable as controls that the manufactured equipment will tre capable of performing its i t function.
devices appears to be the need for the purchaser to c n ended as Class 1E otherwise the order may well be filled from commercial stock em i
1 0
1 i
9
,,.~,,
---r g
--w,
.~
Memo to Docket File,
Additionally, the list of critical dimensions designated for 100% inspection should be broadened to include configuration verification (ex., proper installa-tion and seating of retaining rings) as well as at least a visual verification of the absence of significant defects in critical areas such as the cold formed tab on the trip bracket stamping.
Uldis otapov,
i Vendor Program Branch
Attachment:
As Stated cc:
T. Ippolito R. LaGrange N
-~<
-