ML20205S141

From kanterella
Jump to navigation Jump to search
Forwards Draft Integrated Matls Performance Evaluation Program Review of Region III Matls Program 990315-19 for Comment
ML20205S141
Person / Time
Issue date: 04/16/1999
From: Paperiello C
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Dyer J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20205S144 List:
References
NUDOCS 9904260110
Download: ML20205S141 (3)


Text

pa arc (4j NUCLEAR REGULATORY COMMISSION UNITED STATES ye g

's WASHINGTON, D.C. 20555-0001

,o April 16, 1999

..,p MEMORANDUM TO: James E. Dyer, Regional Administrator Region lil

.7

~

Mh

^

Q) 3

/

FROM:

Carl J. Paperiello, Director Office of Nuclear Material Safety and Safeguards

SUBJECT:

DRAFT 1999 REGION ll1 INTEGRATED MATERIALS PERFORMANCE EVALUATION PROGRAM REPORT In March, a team from the Offices of Nuclear Material Safety and Safeguards (NMSS), State Programs, Region I, and the State of Georgia, reviewed the Region lli nuclear materials program as part of the integrated Materials Performance Evaluation Program (IMPEP), as described in the U.S. Nuclear Regulatory Commission Management Directive 5.6. Regional materials programs are evaluated every 2 years, under IMPEP, using five performance indicators common to regional and Agreement State programs, and additional non-common indicators specific to NRC's four regions.

Attached for your comment is the draft IMPEP report, which documents the results of the review held in your offices on March 15-19,1999. Mr. Scott Moore, of this Office, was the team leader for the Region 111 IMPEP review. The review team's recommendations were discussed with you, Mr. Caldwell, Ms. Pederson, Mr. Caniano, and other regional managers and staff on March 19, 1999. The review team's proposed recommendation is that the Region lli nuclear materials program be found adequate to protect public health and safety. The final determination of Region ill adequacy, based on the review team's report, will be made by a Management Review

[/

Board (MRB) composed of NRC managers and an Agreement State program manager who

//

serves as a liaison to the MRB.

m In accordance with the procedures for implementation of IMPEP, we are providing you with a Fp copy of the team's draft report for review before submitting it to the MRB, and we are simultaneously placing the draft report in NRC's pubiic document room (PDR). You should review the factual correctness of this draft. Please provide your response to me within 2 weeks of receipt of this letter, and include the PDR on distribution for your response. If you need more time to review and comment, please contact Mr. Moore. We can provide up to an additional 2 weeks,if necessary.

22 hk J

CONTACT: Scott Moore, NMSS/IMNS (301)415-7875 990426o11o 990416 PDR ORo NOMA PDR y

l'

, $c 09 ppfS

J. E. Dyer 2

The IMPEP team will review your response, make necessary changes to the report, and issue it to the MRB as a proposed final report.' We will coordinate with Region 111 in scheduling the date of the ensuing MRB meeting, if you have.any questions regarding the attached draft report, please contact us.

Attachment:

As stated cc: C. Pederson, Rlli R. Canlano, Rill DISTRIBUTION:

April 16, 1999 l

NRC Central File IMPEP r/f IMNS r/f NMSS r/f PDR - YES NUDOCS IMOB IMPEP FILE (Book)

LRakovan, OSP KSchneider, OSP KHsueh, OSP GDeegan JGreeves, DWM JHolonich, DWM JHickey, DWM JKennedy, DWM SMerchant LTenEyck, FCSS JPiccone, FCSS PTing, FCSS WTroskowski, FCSS GSmith, FCSS SMinnick, Region I CSanders, State of Georgia DOCUMENT NAME:

AR3impcov.wpd To receive a copy of this document, indicate in the box-h/INNb "C"= Copy w/o att/ encl. "E" = Copy w/att/ encl."N" = No copy OFC MdBA E

EtllIQB M MhlRt lM1 S A

iMNS, NMSE, //

NAME e

L hs M

hb[

CPhdriello er h

(f[99 4/ f /> /99 DATE 4/l5 /99 4/ 6 /99 "4f b/99 4/

i oJ.% u,p.FFICIAL RECORD COPY '

TTfd O l

t

s. gw y

a

i p

J. E. Dyer 2

E The IMPEP team will review your response, make necessary changes to the report, and issue it to the MRB as a proposed final report. We will coordinate with Region lli in scheduling the date of the ensuing MRB meeting. If you have any questions regarding the attached draft report, please contact us.

Attachment:

As stated cc: C. Pederson, Rlli R. Caniano, Rill 1

i l

}

.