ML20205P675
| ML20205P675 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 03/31/1987 |
| From: | Muller D Office of Nuclear Reactor Regulation |
| To: | Vermont Yankee |
| Shared Package | |
| ML20205P681 | List: |
| References | |
| DPR-28-A-099 NUDOCS 8704030342 | |
| Download: ML20205P675 (5) | |
Text
..
[ena %
UNITED STATES 8
1 NUCLEAR REGULATORY COMMISSION
-[
- E WASHINGTON. D. C. 20555 p$
- *...+
\\ERMONT YANKEE NUCLEAR POWER CORPORATION DOCKET NO. 50-271 VERMONT YANKEE NUCLEAR POWER STATION AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 99 License No. DPR-28 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Vermont Yankee Nuclear Power Corporation (the licensee) dated January 30, 1979, as supplemented November 27, 1984, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in confonnity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-28 is hereby amended to read as follows:
8704030342 870331 DR ADOCK 05000271 PDR
5 (2) Technical Specifications The Technical Specifications, contained in Appendix A, as revised through _ Amendment No. 99, are hereby incorporated;in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
?&
_//
v Daniel R. Muller, Project Director BWR Project Directorate #2 Division of BWR Licensing
Attachment:
Changes to the Technical Specifications Date of Issuance: March 31, 1987 i
ATTACHMENT TO LICENSE AMENDMENT N0. 99 FACILITY OPERATING LICENSE NO. DPR-28 DOCKET NO. 50-271 Replace the following pages of the Appendix A Technical Specifications with the enclosed pages. The revised areas'are indicated by marginal lines.
Pages 108a-added 109 i
e
't 1
(
s I
VYNPS 3.6 LIMITING CONDITION FOR OPERATION 4.6 SURVEILLANCE REQUIREMENT E.
Structural Integrity and Operability Testing E.
Structural Integrity and Operability Testing The structural integrity and the operability of 1.
Inservice. inspection of safety-related com-the safety-related systems and components shall ponents shall be performed in accordance be maintained at the level required by the ori-with Section XI of the ASME Boiler and ginal acceptance standards throughout the life of Pressure Vessel Code and applicable Addenda the plant.
as required by 10 CFR 50, Section 50.55a(g), except where specific written relief has been granted by the NRC pursuant to 10 CFR 50, Section 50.55a(g)(6)(i).
2.
Operability testing of safety-related pumps and valves shall be performed in accordance I
with Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda as required by 10 CFR 50, Section 50.55a(g), except where specific written relief has been granted by th NRC pursuant to 10 CFR 50, Section 50.55a(g)(6)(i).
l l
l l
108a l
VYt1PS 3.6 LIMITING CONDITION FOR OPERATION 4.6 SURVEILLANCE REQUIREMENT F.
Jet Pumps F.
Jet Pumps-l 1.
Whenever there is recirculation flow
~
with the reactor in the startup/ hot startup/ hot standby or run modes, all
' jet pumps shall be intact and all standby or run modes, jet pump integrity and operability shall be checked daily operatinr, jet pumps shall be operable, If it is determined that a jet pump is by verifying that the following tw conditions do not occur simultaneously:
inoperable, nn orderly shutdown shall be initiated and the reactor shall be in a a.
The recirculations pump flow
~
differs by more than 10% from the 2.
Flow indication from each of the twenty established speed-flow characteristics.
jet pumps shall be verified prior to Initiation of reactor strtup from a cold b.
The indicated total core flow is more than 10% greater than the core 3.
The indicated core flow is the sum of flow value derived from established the flow indication from each of the "
power-core flow relationship, twenty jet pumps.
If flow indication 2.
Additionally, when operating with one recirculation pump, the dif fuser to lower plenum difforential pressure shall be checked daily, and the differential Pressure of any jet pu"P in the idle shall be initiated nnd.the reactor shall loop shall not very by more than 10%
from established patterns.
be in a cold shutdown condition'within N hows.
l 109 Amendment Nos. O,92,99