ML20205N961

From kanterella
Jump to navigation Jump to search
Forwards Changes to Physical Security Plan.Changes Withheld (Ref 10CFR2.790)
ML20205N961
Person / Time
Site: Armed Forces Radiobiology Research Institute
Issue date: 05/07/1986
From: Conklin J
DEFENSE, DEPT. OF, DEFENSE NUCLEAR AGENCY
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
01922, 1922, NUDOCS 8605210025
Download: ML20205N961 (1)


Text

- - - - _ - - - . - - - - - - _ - - - -

f 5

\["f yi y;2 DEFENSE NUCLEAR AGENCY \

O ,' q ,a ARMED FORCES RADIObeOLOGY RE!EARCH INSTITUTE  !

@- RSD BETHEsDA, MARYLAND 2 0814 01022

( $91

!#~

4 W@ (JDL74>

Regional Administrator USNRC Region 1 631 Park Avenue King of Prussia, PA 19406

Dear Sir:

In accordance with 10 CRF 50.54p, the Armed Forces Radiobiology Research Institute (AFRRI) I-5ysical Security Plan has changed. The changed Plan (reissue no. 3) has been prepared and reviewed by the Reactor Facility Director and found to have no decrease in e f fectiveness. This was concurred with by the Reactor and Radiation Facility Safety Committee after a review of the changes. Subsequent to that occurrence, the changes were made effective 1 April 1986.

Enclosed are 12 copies of the complete plan as reissued along with the summary of the presentation explaining the changes.

The contact point for information on these matters is the Reactor Facility Director, Mr.

Mark Moore. He may be contacted at (301) 295-1290 or at the letterhead address.

Note: The entire package, as enclosed, is protected under 10 CRF 2.790 from public disclosure.

h 1

Enclosure:

J AMES 3. CONKLIN 12 cys of Plan Colonel, USAF, MC Director i i

CY FURN:

Director of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington D.C. 20555 J

l DR ADOCK 05000,70 t )~  !

i PDR L________.________ C *t ..