ML20205N793
| ML20205N793 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 10/31/1988 |
| From: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| CP-88-29, TXX-88761, NUDOCS 8811040349 | |
| Download: ML20205N793 (1) | |
Text
'
t 3
MEE Log # TXX-88761 Fi1e # 10110
.=
=
910.4 TUELECTR/C Ref. # 10CFR50.55(e)
October 31, 1988
$$ESdN*=
U. S. Nuclear Regulatory Commission Attnt Document Control Desk Washington, D. C.
20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATI(N (CPSES)
DOCKET NOS. 50-445 AND 50-446 FEEDWATER SPLIT-FLOW BYPASS VALVES SDAR: CP-88-29 (SUPPLEMEU;.L REPGRT)
Gentlemen:
On April 22, 1988, TV Electric notified the NRC by a letter logged TXX-88384 of a deficiency involving a feedwater design modification which was not incorporated into the FSAR Chapter 15 accident analysis.
The purpose of this supplemental report is to status the corrective action implemantation.
An evaluation of the feedwater split-flow bypass valve has been performed and the single active failure currently assumed for the main feedline break event remains the most lin.iting case. Review of appropriate NEO & ECE procedures,as discussed in TXX-88384, has resulted in a change to a single ECE procedure.
Qualification of the feedwater split-flow bypass valve is continuing and will be complete by November 30, 1988.
Very truly yours, f
W. G. Counsil JDS/mlh c-Mr. R. D. Martin, Region IV Resident inspectors. CPSES (3)
I sG11o40349 891031 ADOCK 0500 5
gDR 400 Nor<h Ontw Smes LB 81 Denes. Tenas 73201 A