ML20205N398

From kanterella
Jump to navigation Jump to search
Amend 252 to License DPR-59,revising TS Section 6 to Delete Requirements for Plant Operating Review Committee Review of Fire Protection Program
ML20205N398
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 04/12/1999
From: Bajwa S
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20205N401 List:
References
NUDOCS 9904160264
Download: ML20205N398 (5)


Text

.

ys i

- 4 UNITED STATES S

NUCLEAR REGULATORY COMMISSION f

WASHINGTON, D.C. 205554X)01 p

POWER AUTHORnY OF THE STATE OF NEW YORK DOCKET NO. 50-333 JAMES A FITZPATRICK NUCLEAR POWER PLANT AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 252 License No. DPR-59 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Power Authority of the State of New York j

(the licensee) dated May 16,1996, with addi.ional informrdion provided on September 9,1997, complies with the standards and requireme'1ts of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I:

B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; j

C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be in,. ' cal to the common defense and security or to the health and safety of the pub" ind E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-59 is hereby amended to read as follows:

1 9904160264 990412 PDR ADOCK 05000333 P

PDR L

, (2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 232

, and the Environmental Protection Plan contained in Appendix B are incorporated into Facility License No. DPR-59. PASNY shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

2.

This license amendment is effective as of the date of its issuance, to be implemented within 30 days of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION h

S. Singh Bajwa, Chief, Section 1 Project Directorate l Division of Licensing Project Management Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of issuance: April 12,1999 l

j l

1.

ATT.'4CHMENT TO LICENSE AMENDMENT NO. Ps?

FACILITY OPERATING LICENSE NO. DPR 59 DOCKET NO. 50-333 Revisa Appendix A as follows:

Remove Paaes

[nsert Paaes 249 249 258 258 l

JAFNPP 6.5.1.3 Alternates Alternative members shall be appointed in writing by the PORC Chairman to serve on a temporary basis.

j 6.5.1.4 Meeting Frequency Meetings will be called by the Chairman as the occasions for review or investigation arise. Meetings will be no less frequent than once a month.

6.5.1.5 Ouorum A quorum of the PORC shall consist of the Chairman or a Vice-Chairman and five members including designated alternates. Vice-Chairmen may act as members when not acting as Chairman. A quorum shall contain no more than two alternates.

6.5.1.6 Responsibilities The PORC shall be responsible for the:

a.

Review of 10 CFR 50.59 safety and environmentalimpact evaluations associated with procedures and programs required by Specification 6.8, and changes thereto.

b.

Review of proposed tests and experiments that affect nuclear safety.

c.

Review of proposed changes to the Operating License and Technical Specifications, d.

Review of proposed changes or modifications to plant systems or equipment the.t affect nuclear safety.

e.

Investigation of violations of the Technical Specifications. The PORC shall prepare and present a report covering the evaluations and recommendations to prevent recurrence to the Site Executive Officer, who will then forward the report to the Chief Nuclear Officer, the Director Regulatory Affairs and Special Projects, and to the Chairman of the Safety Review Committee.

f.

Review of plant operetions to detect potential safety hazards, g.

Performance of special reviews and/or investigations at the request of the Site Executive Officer.

h.

Review of all reportable events.

i.

Review of the Process Control Program and the Offsite Dose Calculation Manual (ODCM) and changes thereto.

Amendment No. 22, 57, 04,170, 210, 220, 222, 220, 240, 252 249

sAFNPP 6.12 INDUSTRIAL SECURITY PROGRAM An industrial security program shall be maintained throughout the life of the plant in accordance with the provisions of the Plant Security Plan.

6.13 EMERGENCY PLAN THIS SECTION PURPOSELY BLANK 6.14 FIRE PROTECTION PROGRAM THIS SECTION PURPOSELY BLANK l

Amendment No. 37, 01, 220, 252 258