Discusses Facility Dcrdr.Review Performed on Unit 1 & Common Control Room & Emergency Shutdown Panels W/Plan to Extend Rept Coverage to Unit 2 Upon Completion of Control Panel Design
ML20205N338
Person / Time
Site: Limerick Constellation icon.png
Issue date: 10/27/1988
From: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Murley T
Office of Nuclear Reactor Regulation
References
NUDOCS 8811040068
Download: ML20205N338 (2)


Text

_.- _ _ _ _ _ - - _ _ _ - - _ _ _ _.. _ _ - -. _ - - - - _ - _ _ _ _ _ - - _

r o

)

PHILADELPHI A ELECTRIC COM PANY 2301 M ARKET STREET

}

P.O 3OX 8699 I

o PHILADELPHIA, PA.19101 (2151841 4500 JOHN S. MEMPER stMiom VICE PNttlOSNT = NUCLE AR October 27, 1988 i

Dr. T. E. POrley, Director Docket No. 50-353 Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Cmmission Attn: Doctsnent Control Desk Mall Station P1-137 Washington, DC 20555

Subject:

Limerick Generating Station, Unit 92 Lirnerick Centrol Room Design Review

References:

1) Letter, J. S. Kmper to A. Sctwercer Dated dune 25, 1984
2) Letter, J. G. Keeper to A. Schwencer Dated Novenber 2,1984 3} Letter J. S. Kmper to W. R. Butler Dated June 28, 1985
4) Supplement 1 to NuReg - 0737 Dated Decader 17, 1982

Dear Dr. Murley:

In the reference 1, 2 and 3 letters Philadelphia Electric Co.

submitted the strinary and supplemental reports for the Limerick Generating Station Units 1 and 2 Detailed Control Rocm Design Review (DCRDR). This review was performed on Unit 1 and Cormon Control P.com and Emergency Shutdcun Penels with a pian to extend the report coverage to Unit 2 upon ccrpletion of its control panel design.

Since the Unit 2 design was intended to duplicate the Unit 1 des!gn as closely as possible, the plan for Unit 2 was to:

1.

Incorporate the design Inprovermnt s identified for Unit 1, and 2.

Identify, evaluate, and incrove as necessary those areas where the Unit 2 physical design layout differs frem the Unit 13 1 physical design, i

3 D 8811040068 891027 ADOCK 050 g 3 PDR A

2-This plan is being irrolomented.

Item 2 has been ccnoleted and no physical differences were identifled.

The final irrproved design for the Unit 2 control panels will be verifled to be Identical to the Unit 1 pcnols. Consequently, the reports as orig;nally submitted are appilcable for l' nit 2.

F The pelor submittal of the reference 1, 2, and 3 letters with their attached reports satisfles the requirernent of paragraph 5.2.B of reference (4) for Limerick Unit 2.

The HEDs identified in the Reference 1, 2, and 3 letters that were scheduled to be ccrpleted prior to the end of the first refueling outage on Unit I will be corrected prior to fuel load on Unit 2.

Future changes to the Unit 1 Par,als (e.g. currently deferred HEDs or new issues) that do not pass the operator transparency criterla prior to licensing of Unit 2, will be Installed on Unit 2 crlor to IIcensing.

l Sincerely, V. Nf W

TJC/t#1/07078801

(

t Copy to: Addressee l

R. A. Gram, LGS Unit 2 Senior Resident Inspector

[

j W. T. Russell, Region 1 Actninistrator i

R. J. Clark, LGS Project Manager l