- 4. CONTRACT 40 CODE PAGE OF PAGE5
. AMENDMEN.T CF SOLICITATION /MODFICATION CF CONTRACT l
- a. REQUsbeitON/ URCHASE REQ. No.
S. PROJECT NO.fff appi ble)
P
- 2. AMENOMEN f /MOOiF tCAllON NO.
3.EFr
,4VE DATE 9/17/88 RES-87-397 dated 8/22/88 m
g6g,~,isV ~ '
- 7. ADMINISTERED BY (1/ ether thea ltene 4) l U.S. Nucicar Regulatory Commission Division of Contracts and Property Management Washington, D.C. 20555
- 4. N AME AND ADOR ESS OF CON T R ACToH (No., etreet. eematy, siete sad K/P Code)
.A. AMENOMENT OF SOLICs7ATlON No.
PRIME:
U.S. Small Busisess Administration 1020 Main Street, Suite 290
% DATED rum srsu a ss Boise, Idaho 83) 12
' * ^ ' ' " " ' # " ^ ' U* " '"
SUB:
Scientech, Inc.
- 'U."SB-08710203 P.O. Box 1406 04-8 Idaho Falls. ID 83403-1406 X
,g9 6/22/87 CODE lF ACILITY CODE
- 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS The above numtwred sohcitatkx. is amended as set forth in item 14. The nour'and date erecified for receipt of Offers is en tended, is not on.
sen&d.
Offers must acknowled;ie receipt of this amendment prior to the hour and date specif ed in the sol. citation or as amerased, by one of the following methods:
copies of the amendment; (td By acknowledging receipt of this amendment on each copy of the of for (a) By completing items 8 and i5.and retuming sut:mitted, or (c) By separate letter or teferem which includes a reference to the sohcitation and amensment numbers. FAILURE OF YOUR ACKNOWLEDG MENT TO BE RECEIVED AT THE PLACE DE$1GNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DAT iN 6 EJECTION OF YOUR OFFER. If by virtue of this amendment yrw desire to change an offer alreasy submitted,such change may be made by telegram or lett:e. prova 90 exh telegram or letter mak et reference to the sohcitat.on and this amendment, and is received prior to the ogening hour and date specified.
!!. ACCTL N TING AND APPROPRI AfiON DAT A (11 reessred)
APPN. NO. 31X0200.608 B&R No. 60-19-50-01 FIN No. D-1760 Oblicate:
$45.000.00
- 13. THIS ITEM APPLIES ONLY TO MOOlFICATIONS OF CONTRACTS / ORDERS, IT MODIFIES THE CONTRACT / ORDER NO. AS DESCRIBED IN ITEM 14.
"*"'""'"I'#"'""
- M Ci"OROYR N O N N I N A. " "*"^*'
- l S. THE ABOVE NUMBERED CONTR ACT/ ORDER IS MOOtFIED TO REFLECT THE ADMINISTR ATivF CHANGES (seek as thenges te peplag office, appropriefion date, e fe.) SET FOR TH IN ITEM 44, PURSUANT TO THE AUTHOR 4TY OF F AR ej.loJ(D).
C. THet SUPPL (MENT AL AGREEMENI 45 ENT EREO INTO PuhSU ANT T O AUTHORet Y OFa X
Mutual agreement of the parties.
0.01HE R ispeesty espe of medalwetsen end eessentrl E. IMPORTANT: Contractor is not, b is required to sign this document and return 9
copies to the issuing office.
ITOESC RIPT ION OF AMENOMEN1/WoDiFiC AT 60N (Orgeaiard by (JCF ortrien heehaas,includans sehedsetaea/ventreet es hivet saatier sehen (easW The purpose of this modification provides for the following:
. (CONT 1KUED ON THE NEXT PACE) 9 j
88110304S7 880927
'f PDR CONTR e
NRC-04-87-397 PDC
(
.E.<e.en as ereewee me eM. en termi ano ceaestions se ine escum t 1.verencee sa steai sA er ioA. as her ae Hect.
16A. NAME AND T4T6.E OF CONT RACitNG oFF 6CER (Type opprsat) 15A. N AME ANO 16T LE of 56GNER (rype er Mat /
See Signature Page 46C.DATE sicNEu' >
us. con r R AC t oR/Or e E RoR ac. oAi E sacNu, nea.vNiTEO si AT Es OF AME RiCA a.gaetve et cenerset.as ottseers j
asematen etpersea omaerued to signs STANDARD FORM 30 (REY. t483)
NSN FSa041.lSt 80f 0 "
34105
, Prescr60ed DY GSA A
PREVIOUS EOtTION UNUSABLE F AR (a 8 CF R) 53.2a3 f
r Modification No. 7 Contract No. NRC-04-87-397 (Formerly NRC-03-87-027)
Page :. of 5 a.
Modifies the Statement of Work to add tasks as within scope changes.
b.
Corrects the contract amount in the last sentence under Modification No. 6 to read 1183,300.00.
As a result, this Modification No. 7 increases the total amount of the contract from 5183,300 by
$123,835.00 to $307,135.00.
c.
Increases the funding obligated by the Government from 1183,300.00 by 545,000.00 to 1228,300.00.
d.
Revises tha due date for the Final Regulatory Analysis.
e.
Extends the contract Period of Performance.
f.
Adds Indirect Rates to *se contract.
1.
Section C.1, Description / Specifications / Work Statement is modified to include the additional tasks identified
)
in Attachment 1,
hereto.
The work shall be performed in accordance with Attachment 1 and the contractor's technical proposal dated September 2, 1988, as revised September 27, 1988, incorporated herein by reference.
2.
Section D.1 Consid'eration and Obligation is revised by increasing the total ceiling amtant of the contract by
$123,035.00 from $183,300.00 to 1307,135.00. A breakdown of the total contract ceiling amount is as follows:
M Fixed Price for basic contract effort Cost ceiling for Additional Support Tash 8 specified in Section C M
Cost ceiling for Travel associated M
with Additional Support - Task 8 Cost-Plus-Fixed-Fee for performence of Tasks 1 through 5 added to the contract under Modification No. 3 (240,170.00 represents reimbursable cost and $3,615.00 represents fixed f ee)
- M
NRC-04-07-397 (Formerly NRC-03-07-027)
Modification No. 7 Page 3 of 5 Cost-Plus-Fixed-Fee for performance of Tasks added to the contract under Modification No. 5 6 represents reimburnable M
cost and M epresents fixed fee)
Cost-Plus-Fixed-Fee for performance of Tasks added to the contract under this Modi fication No. 7 represents reimbursable 6
cost and represents fixed f oo) 3.
Section B.1, Consideration and Obligation is revised by changing the due date for the "Final Regulatory Analysis Report" to March 31, 1989.
4.
Section D.1 Consideration and Obligation is revised by adding the following paragraph:
"The amount presently obligated by the Government with resprut to this contract is $228,300.00."
W 5.
Section F.
4 Duration of Contract Period, is revised by extending the expiration date of the contract to December 31, 1989.
6.
Section G.6 Indirect Rates is added to read as follows:
"a.
Pending the establishment of final indirect rates which shall be negotiated based on audit of actual costs, the contractor shall be reimbursed for allowable indirect costs as follows:
Gateggg2 Batg J31 Gggt Dase Ogniigablg EECigd Overhead lllll Direct Labor O/25/07 - 9/2b/80 GLA REEEER Total Direct O/25/07 - 9/25/00 Cost & Overhead Overhead SEEEEE5 Direct Labor 9/26/00 - 12/31/09 G&A llEEEll Total Direct 9/26/00 - 12/31/09" Cost & Overhead
NRC-04-87-397 (Formerly NRC-03-87-027)
Modification No. 7 Page 4 of 5 b.
The Contracting Officer may adjust the above rates as appropriate during the term of the contract upon acceptance of any revisions proposed by the Contractor.
It is the Contractor's responsibility to notify the Contracting Officer in acr.ordance with 52.232 Limitation of Cost ( A?f( 3704) or 52.232 Limitation of Funds (APR 1984), as applicable, if such change (s) affect (s) periormancs.
.s'. wark within the established cost or funding limit..' ions.
All other terms and conditions of the contract remain unchanged.
9
(
e I
t N,
'v.
Modification No. 7 Contract No. NRC-04-07-397 (Formerly NRC-03-87-027)
Pago 5 of 5 IB1E0BIIIE 00BEEdENI 0 1 CONTRACTOR:
Scientech, Inc.
___ I_ 1 _.lb ttde_E M _________
___T 9_? U _
Datei ovi
____l___i
_ _L L $ $ _k _Q } }_ D _ Q _
Namet Titte:
____f_d.f.S_J_@_E_9_I_________
PRIME CONTRACTOR 7uns dyminis rat, ion U.
S. Small Bs
..&.h__
Dys l_
$p[_t_D_.
(f Datos l
_.LaDonna
-Ba ker--------
Nama.
__FohR*_c!L u.sar____________
Titie 4
}
PROCURING CFFICE
)
(
U.S. Nuclear Regulatory Coemiusion By:
s e
gt, Date:
[d__
hu_L__b h_(hfe f[,I__k_______,,___
f Names istn contM.cDdre_ _atacr&________
x t
I
,m
ATTACllMENT I ftRC-04-87-397 ft0DIFICAT10ft fio. 7 STATUtEllT OF WORK The following tasks are to be included in modificatioa 7 to the existing contract:
Geview the SRP and propose changes to specific sections as required for implementation of the proposed resolution for GI 23. Transmit marked up sections of the SRP to the NRC for review and comment.
Resolve / incorporate NRC review comments.
Instead of submitting the existing draft regulatory analysis report in its current form, exiract the cost / benefit portions from it and prepare a final Scientech cost / benefit report. Also, develop a proposed NRC staff regulatory analysis report (draft NUREG) based on technical information in the existing draft regutatory analysis report. Transmit these two reports to the fJRC for review and comment (in lieu of the existing report) and reso!vehncorporate NRC review comments.
Review Byron-Jackson seat testing results and provide technical evaluation on apphcability to the proposed resolution for GI-23, including preparation of presentation and sfides.
Continue (through December '89) on cati" assistance to the NRC 'or presentations and resolution of comments / questions from the NRC, pump vendors, owners groups, and the public on an as needed basis.
The cost ceiling of $44,626.00 is established for perfornance of
'on call" assistance as described above. This ceiling is part of the total cost of $123,835.00 for this Modification No. 7.
l "On-call" assistance, as required under this Statement of Work, shall be issued through the Contracting Officer (CO).