Insp Repts 50-424/87-22 & 50-425/87-21 on 870305-11.No Violations or Deviations Noted.Major Areas Inspected: Licensee Responses & Corrective Actions Re Remaining Items Noted During 860310-21 Emergency Preparedness Appraisal
ML20205N154
Person / Time
Site: Vogtle  
Issue date: 03/17/1987
From: Cunningham A, Decker T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20205N119 List:
References
50-424-87-22, 50-425-87-21, NUDOCS 8704020607
Download: ML20205N154 (4)


See also: IR 05000424/1987022

Text

_

-.

_

_

- _.

_.-

_

. _ . _ .

.

_.

.

-

/je Retog'o

UNITED STATES

NUCLEAR REGULATORY COMMIS$10N

!

'

f

MEGION 11

[

n

t

j

101 MARIETTA STREET,N.W.

ATL ANTA, GEOMGIA 30323

9.....l

%

,

'

MAR 10 W

'

Report No.: 50-424/87-22,50-425/87-21

I

Licensee: Georgia Power Company

!

P. O. Box 4545

Atlanta, GA 30302

l

'

Docket Nos.: 50-424, 50-425

License Nos.: CPPR-108, CPPR-109

l

Facility Name: Vogtle Electric Generating Plant

Inspection Conducted: March 5-11,1987

l

Inspector; b b ' 7 h

3//7/67

Y'A.L.Cunningham

Date Signed

i

Approved by: MJ/#2h

/i

M// 7/ A'7

IF T. R. Decker, Section Chief

Date Signed

Division of Radiation Safety and Safeguards

j

SUMMARY

Scope:

This special, announced inspection involved the evaluation of the

licensee's responses and corrective actions addressing the remaining items

I

identified during the Radiological Emergency Preparedness Appraisal conducted

March 10-21, 1986.

.

'

Results: No violations or deviations were identified.

l

0704020607 07031'/

.

POR

ADUCK 0D000424

l

0

PDH

1

, - - - . _ , - - . - - . - - . - ,_,,, - - _ ,._ . . - _--. -

- - . - . - _. __ _ - .

, , _ ,

-. __

-

_

.

_.

-

.-._

_

-

-

_.

_

l

.

REPORT DETAILS

!

1.

Persons Contacted

Licensee Employees

'

P. D. Rice Vice President, Vogtle Project Director

G. Bockhold, Jr., General Manager, Nuclear Operations

  • C. E. Belflwer, Quality Assurance Site Manager
  • C. L. Cross, Senior Regulatory Specialist

l

  • Attended exit interview

I

2.

Exit Interview

The inspection scope and findings were sumarized on March 6,1987, with

those persons indicated in Paragraph 1 above.

The allegation listed

herein was also discussed with licensee representatives.

The licensee's

commitment to implement required corrective actions, and the status of

completion of such actions were discussed via telephone on March 9, 1987

and March 11, 1987, respectively.

The licensee did not identify as

'

proprietary any of the materials provided to or reviewed by the inspector

during this inspection.

3.

Licensee Action on Previous Enforcement Matters

This subject was not addressed during the inspection.

No enforcement

items were identified during the radiological emergency preparedness

appraisal.

4.

EmergencyPreparednessItems(255558)

This section addresses the status of corrective actions implemented by the

licensee in response to incomplete items identified during the March 1986

Radiological Emergency Preparedness Appraisal.

a.

(Closed)

Incomplete

Item (50-424/86-12-21, 50-425/86-18-21):

Corrplete installation and testing of Control Room equipment used in

accident detection, mitigation, classification, notification and

protective action recommendations.

Inspection enqfirmed that all

equipment was installed, tested and released for the cited functions.

b.

(Closed)

Incomplete

item (50-424/86-12-23,

50-425/86-18-23):

Completion of the installation and testing of the TSC ventilation

system, and qualification of cognizant aersonnel in operation and

maintenance of same.

Inspection disclosed that the subject

ventilation system was completed, tested, and cognizant personnel

wero trained in operation and maintenance uf the system.

l

-

- - - -

- - - - - - - - - - - -

--

- -

-

.l

'

.

2

.

c.

(Closed)

Incomplete Item (50-424/86-12-24, 50-425/86-18-24):

Complete installation and testing of TSC electrical distribution

system and qualification of personnel to operate and maintain same.

Inspection disclosed that installation of the subject system and

qualification of cognizant personnel to maintain same were completed,

d.

(Closed)

Incomplete Item (50-424/86-12-64,

50-425/86-18-64):

Revision of EPIPs to include reserve emergency supplies and

equipment, the stocking plan for the warehouse, and designation of

primary

locations.

Inspection disclosed that emergency

equipment / instruments were standard plant equipment and HP

departments stocked adequate sup) lies of spare equipment and

instruments to replace those requ' ring repair or calibration.

The

availability of reserve instruments / equipment to supplement those

i

removed for repair or calibration is consistent with guidance

'

promulgated in Section II.H.10 of NUREG-0654.

5.

Allegation

,

a.

Allegation (RII-87-A-0035)

Notification of Unit 2 construction workers of Unit 1 emergency.

Concern

!

A concerned individual stated that there was no equipment (e.g., loud

l

speakers) to alert Unit 2 construction workers in the event of a

nuclear or non-nuclear Unit 1 emergency.

The only method available

to warn the workers was by informally passing the information from

person to person.

Discussion

l

An onsite Region Il inspector informed licensee representatives of

!

the subject concern on March 6,1987, and promptly initiated a

,

detailed review and investigation of the alleged problem.

'

Investigation disclosed that a site warning system, consisting of a

siren / speaker, was in place and operational.

It was also verified

that mandatory training and orientation of Unit 2 construction

workers regarding site emergency conditions, notification signals,

and required responsive actions was completed and documented prior to

site receipt of nuclear fuels.

The subject training is assigned as a

condition of employment.

Investigation also disclosed that the

notification signal was readily audible throughout the site; however,

the signal was inaudible in certain areas of the Unit 2 power block,

namely:

containment, Auxiliary Building, turbine deck, and other

high ambient noise and/or isolated zones.

Verbal discussions were

held with cognizant management who concurred with the findings, and

comitted to promptly determine and implement the most feasible

corrective actions.

1

-

-

-

-

-

-

.

- - -

- -

- -

-

-

.

_.

-

_ _ .

-

. _ _ .

'

.

.

3

Conclusions

The allegation is correct in that the site emergency notification

'

signal cannot be heard in areas of the Unit 2 power block designated

above.

Discussions with cognizant licensee management via telephone

i

on March 9,1987, and March 11, 1987, disclosed that corrective

'

action involving installation of alert sirens in the referenced

designated areas of Unit 2 power block was in progress and scheduled

for completion and operational testing prior to March 12, 1987.

Inspector Followup Item 50-424/87-22-01, 50-425/87-21-01:

Verify

operation and adequacy of the site emergency notification signal

within Unit 2 power block, including system control, procedures, and

required training.

6.

InspectorFollowup(92801)

(Closed) IN-86-98:

Offsite Medical Services.

The Federal Emergency

Management Agency (FEMA) has developed a Guidance Memorandum MS-1

!

" Medical Services" that addresses implementation of the Commission policy

'

on offsite medical services.

Since this guidance is related to

rovisions of medical services for members of the general public

l

p(offsite) this is an area evaluated by FEMA.