ML20205N105

From kanterella
Jump to navigation Jump to search
Requests Assistance in Review of Fuel Handling,Health Physics,Accidents & Environ Areas Per Encl Schedule of Decommissioning Actions
ML20205N105
Person / Time
Site: Peach Bottom, Indian Point, Fermi, Humboldt Bay, 05000000
Issue date: 04/24/1986
From: Berkow H
Office of Nuclear Reactor Regulation
To: Benaroya V, Parr O
Office of Nuclear Reactor Regulation
References
NUDOCS 8605010433
Download: ML20205N105 (4)


Text

April 24, 1986 54 -3 So-133 3@"34[

MEMORANDUM FOR: Victor Benaroya, Chief Facility Operations Branch Division of PWR Licensing-A Olan D. Parr, Chief Plant, Electrical Instrumentation and Control Systems Branch Division of PWR Licensing-B FROM: Herbert N. Berkow, Director Standardization and Special Projects Directorate Division of PWR Licensing-B

SUBJECT:

. REACTOR DECOMMISSIONING REVIEW ASSISTANCE As Ollie Lynch and Pete Erickson of my staff discussed with you, recently, we will need the assistance of PEICSB, PWR Licensing-8,in the review of fuel hand-ling, health physics and accidents; and of F0B, PWR Licensing-A, in the area of environmental review as shown in the enclosed table. TAC numbers are indicated for Indian Point-1, Fermi 1 and Humboldt Bay, Unit 3. TAC numbers will be obtained for Dresden 1 when we receive its decommissioning plan and for Peach Bottom 1 when we receive a request to extend its possession-only license.

It is my understanding that you have agreed to provide the technical review support effort in the time frame indicated in the table. Copies of the Indian Point-1 decommissioning plan have been provided for your staff to initiate their review. Should you have any questions, please contact Ollie Lynch (X28209) or Pete Erickson (X28194). Your assistance is appreciated, original signed by 0.D.T. Lynch for Herbert N. Berkow, Director Standardization and Special Projects Directorate Division'of PWR Licensing-B

Enclosures:

As stated DISTRIBUTION:

$ Centra 1J11e; NRC PDR Local PDR SSPD Reading 8605010433 860424 ADOCK 05000003 PErickson 0 Lynch PDR P PDR - h PNoonan HBerkow h y M SPD DPW _-8:SSPD DP L-B:SSPD DP L-B:SSPD

,in PErickson:cw 0 Lynch pHBerkow 86 04 /86 04/d /86 04/f/86

F s

'^ UNITED STATES y

s n NUCLEAR REGULATORY COMMISSION 3

w I i WASHINGTON, D. C. 20555 g

%, April 24, 1986 MEMORANDUM FOR: Victor Benaroya, Chief Facility Operations Branch Division of PWR Licensing-A Olan D. Parr, Chief Plant, Electrical Instrumentation and Control Systems Branch ,

Division of PWR Licensing-B '

ROM
Herbert N. Berkow, Director Standardization and Special Projects Directorate Division of PWR Licensing-B

SUBJECT:

REACTOR DECOMMISSIONING REVIEW ASSISTANCE As Ollie Lynch and Pete Erickson of my staff discussed with you, recently, we j will need the assistance of PEICSB, PWR Licensing-B,in the review of fuel hand-  !

ling, health physics and accidents; and of F08, PWR Licensing-A, in the area of i

' environmental review as shown in the enclosed table. TAC numbers are indicated for Indian Point-1, Fermi 1 and Humboldt Bay, Unit 3. TAC numbers will be obtained for Dresden 1 when we receive its decomissioning plan and for Peach Bottom I when we receive a request to extend its possession-only license.

It is my understanding that you have agreed to provide the technical review support effort in the time frame indicated in the table. Copies of the Indian Point-1 decomissioning plan have been provided for your staff to initiate l their review. Should you have any questions, please contact Ollie Lynch s (X28209) or Pete Erickson (X28194). Your assistance is appreciated. '

l

, , yI -

erbert N. Berkow, Director Standardization and Special  !

Projects Directorate l Division of PWR Licensing-B  ;

Enclosures:

As stated

)

i Work Effort Requirements and Schedule for Decommissioning Actions P. B. Erickson, Phone 28194 Date Effort Plant Item Final Assigned Needed Sched.

Type of Action Needed Action Reviewer or by Reviewer Comp.

Sched. Discipline and PM Dates o Humboldt Bay 3 SER 8/30/86T F. Witt 1 Man Week 7/30/86T o Decommissioning TAC 55484 P. Erickson 1 Man Week 8/30/86T o Fuel on-site FES 8/30/86T F. Witt 1 Man Week 7/30/86T TAC 55484 P. Erickson 1 Man Week 8/30/86T R. Samworth 2 Man Days 7/30/86T o Fermi-12 ) DES 2/10/87T P. Erickson1 ) 3 Man Weeks 2/10/87T o 40 year Extension FES 6/10/87T P. EricksonI ) 3 Man Weeks 6/10/87T o Possession Only License SER 6/10/87T P. Erickson1 ) 3 Man Weeks 6/10/87T l o No Fuel On-site TAC 57716 l o Indian Point ) DES 12/1/86 R. Samworth 2 Man Weeks 10/1/86T Unit 1 TAC 59664 Fuel Handling 3 Man Weeks 10/1/86T o Dacommissioning H.P. Review 2 Man Weeks 10/1/86T  !

Accident Analy. 2 Man Weeks 10/1/86T P. Erickson 3 Man Weeks 12/1/86T o Fuel On-site FES 5/15/87T Fuel Handling 2 Man Weeks 3/01/87T TAC 59664 H.P. Review 1 Man Week 3/01/87T Accident Analy. 1 Man Week 3/01/87T

h. Samworth 1 Man Week 3/01/87T P. Erickson 2 Man Weeks 5/15/87T SER 5/15/87T Fuel Handling 3 Man Weeks 3/01/87T l H.P. Review 2 Man Weeks 3/01/87T l TAC 59664 P. Erickson 3 Man Weeks 5/15/67T
1) PM would complete review on Fermi 1 and ask R. Samworth to review Final DES and FES. Total time of 4 Man Days for Samworth.
2) The licensee has not been informed that an Environmental j Impact Statement must be prepared by the NRC and that they must submit necessary information.

i

.Q

,b jt Work Effort Requirements

and Schedule for l Decommissioning Actions P. B. Erickson, Phone 28194 Date Effort Final Assigned Needed Sched.

Plant Item Action Reviewer or by Reviewers Comp.

Type of Action Needed Sched. Discipline and PM Dates o Dresden 1 DES 10/30/87T Fuel Handling 3 Man Weeks 7/30/87T o Decommissioning R. Samworth 2 Man Weeks 7/30/87T o Fuel Remains On-site H.P. Review 2 Man Weeks 7/30/87T o Application Sched. Accident Analysis 2 Man Weeks 7/30/87T about 8/31/86T P. Erickson 4 Man Weeks 10/30/87T o Licensee informed FES 2/28/88T Fuel Handling 2 Man Weeks 12/30/87T by phone that R. Samworth 1 Man Week 12/30/87T an Environmental H.P. Review 1 Man Week 12/30/87T Impact Statement Accident Analysis 1 Man Week 12/30/87T will be prepared P. Erickson 1 Man Week 12/30/88T and that they SER 2/28/88T Fuel Handling 2 Man Weeks 12/30/87T must submit Approve H.P. Review 2 Man Weeks 12/30/87T an Environmental SAFSTOR Report in Accord- Plan P. Erickson 3 Man Weeks 2/28/88T ance with 10 CFR Part 51 2

o Peach Bottom ) NRC Reg. 5/15/86 P. Erickson 1 Man Week 5/15/86T Unit 1 for Env. Request t o Application to Report to Licensee Extend license (Possession Only License) o Licensee not yet DES 7/1/87T informed that H.P. Review 1 Man Week 4/1/87T DES and FES R. Samworth 1 Man Week 4/1/87T are needed and P. Erickson 3 Man Weeks 7/1/87T that they will FES 12/1/87T _R. Samworth 1 Man Week 10/1/87T need to submit P. Erickson 2 Man Weeks 12/1/87T Environmental SER 12/1/87T and Safety Extension H.P. Review 1 Man Week 10/1/87T Information of license P. Erickson 2 Man Weeks 12/1/87T *

, . ,