1 April 12, 1999 MEMORANDUM TO: Cynthia A. Carpenter, Chief Generic issues. Environmental. Financial and Rulemaking Branch Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation FROM:
Stewart L. Magruder, Project Manager Original Signed By:
Generic issuer. Environmental. Financial and Rulemaking Branch Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation
SUBJECT:
SUMMARY
OF FEBRUARY 24,1999, MEETING WITH ABB COMBUSTION ENGINEERING NUCLEAR POWER REGARDING IMPROVED ABB PRESSUrRIZED WATER REACTOR FUEL On February 24,1999, ABB Combustion Engineering Nuclear Power (ABB CENP) met with Nuclear Regulatory Commission (NRC) staff at the NRC headquarters in Rockville, MD. provides a list of meeting attendees.
The purpose of the meeting was to discuss ongoing and future licensing plans and interactions by the ABB CENP Fuel Operations group with various NRC organizations. The majority of the presentation material and the discussion involved proprietary material. The non-proprietary version of the slides used by ABB CENP is included as Attachment 2.
Representatives from ABB CENP described the new pressurized water reactor (PWR) fuel design features and the expected benefits of these features. They also diccussed the testing that has been done and the lead fuel assemblies installed at various plants. They noted that they will be submitting a topical report with a new correlation for determining departure from nucleate boiling (DNB) in the near future.
Attachments: As stated cc w/att: See next page 9904160097 990412 PDR TOPRP EPfVC-E C
PDR DISTRIBUTION: See attached page Document Name: g:\\SLM1\\msum224a.wpd OFFICE PM:RGEB (A)SC:RGEB l
NAME SMagruder:$@ TB M DATE 4/' /99 4 ff)S9 b'
N 3
g6DLL 99-9 o
- (
V g g g ggy
-ru
I d
y3
-,t UNITED STATES j
j NUCLEAR REGU;.ATORY COMMISSION WASHINGTON, D.C. 205$5-0001
.o April 12,1999 l
MEMORANDUM TO: Cynthia A. Carpenter, Chief Generic issues. Environmental. Financial and Rulemaking Branch Division of Regulatory improvement Programs Office of Nuclear Reactor Regulation FROM:
Stewart L. Magruder, Project Manager
.6w.&,1 r#
A Generic issues. Environmental. Financial and i
Rulemaking Branch Division of Regulatory improvement Programs Office of Nuclear Reactor Regulation
SUBJECT:
SUMMARY
OF FEBRUARY 24,1999, MEETING WITH ABB COMBUSTION ENGINEERING NUCLEAR POWER REGARDING IMPROVED ABB PRESSURIZED WATER REACTOR FUEL On February 24,1999, ABB Combustion Engineering Nuclear Power (ABB CENP) met with Nuclear Regulatory Commission (NRC) staff at the NRC headquarters in Rockville, MD. provides a list of meeting attendees.
The purpose of the rneeting was to discuss ongoing and future licensing plans and interactions by the ABB CENP Fuel Operations group with various NRC organizations. The majority of the presentation material and the discussion involved proprietary matenal. The non-proprietary version of the slides used by ABB CENP is included as Attachment 2.
Representatives from ABB CENP deecribed the new pressurized water reactor (PWR) fuel design features and the expected benefits of these features. They also discussed the testing that has been done and the lead fuel assemblies installed at various plants. They noted that they will be submitting a topical report with a new correlation for determining departure from i
nucleate boiling (DNB) in the near future.
Attachments: As stated I
cc w/att: See next page i
i
rq 8
Distribution: Mtg. Summary w/ ABB CENP re Improved PWR fuel Dated Aoril 12. 1999 Hard Cooy Central Files PUBLIC RGEB R/F OGC l
ACRS SMagruder EMail SCollins/RZimmerman BSheron WKane DMatthews SNewberry CCarpenter TBergman GTr' ;y, EDO j
GHolahan TCollins JWermiel MChatterton EKendrick SWu RCaruso l
I l
1
m.
,.3 NRCIABB CENP Fuel Meeting LIST OF ATTENDEES I
February 24,1999 i
NAME ORGANIZATION Thomas Rodack ABB CENP l
John Baum ABB CENP Bill Harris ABB CENP Virgil Paggen ABB CENP Zeses Karoutas ABB CENP Matt Kattic BGE Mark Finley BGE Donna Moeller BGE i
Shih-Liang Wu NRC/NRR l
Ralph Caruso NRC/NRR Edward Kendrick NRC/NRR Jim Lyons NRC/NRR Stu Magruder NRC/NRR l
Muffet Chatterton NRC/NRR i
l l
3
=
Licensing Plan for Full Batch implementation of improved ABB PWR Fuel Meeting at USNRC February 24,1999 A!!!!
Agenda
- Introductions
- Objectives of Meeting
- Description of Fuel Improvements
- Verification Tests Completed
- Description of LFAs
- Site and Hot Cell Exams
- Licensing Plan for Improved Fuel
- DNB Correlation Topical
_j: Summary ggggg
p.
I.Q.
l Objectives of Meeting Ann
=
Description of Fuelimprovements Ann
=
r.
r o
L Customer Driven Needs 4
kr
- Improved fuel reliabliity
- Improved fuel cycle economics
- Higher burnup capability
- Improved thermal performance Alin
=
i Design Response l
All
=
- 7.,
,h I
P Improved Fuel Description ABB Improved Grids - Mixir.g Vanes
)
4 e
m Ann OIMe
~'
i f
i
[-
6 n
?
3 Improved Grids "I" Spring ABB
=
Verification Tests Completed
- Out-of-pile flow tests at reactor conditions
- DNB tests Columbia University HTRF
- Mechanical tests Ann
=
A g.! Out-of-pile Flow Tests
- Single and Dual Bundle Flow Tests at reactor conditions to demonstrate fretting performance and hydraulic compatibility
-Pressure drop
- Assembly vibration
-Rod Wear
-Crossflow
)
Alll1
,=
Long-Term Dual Bundle Flow Test f
e A!!!!
,=
r a
h
- DNB Tests at Columbia University HTRF 4
~
w Air.
~"
i Cosine DNB Test Results 6
M ID ID M ODED
- 3 Mechanical Tests
- Grid strength Grid-to-rod support characteristics
- Cage lateral load deflection i
- Assembly pluck impact and free vibration I
tests
- Axial and torsional load tests for guide tube weld connection No changes made to guide tubes I
Description of LFAs at Calvert Cliffs I
1 Site and Hot Cell Exams c :.
ABB Licensing Plan for Fuel improvements l
l I
t I
t
Licensing Plan for Fuel Improvements Ann
,=
Licensing Plan for Fue! Improvements
- Implementation in reload via 10CFR50.59
- Address criteria
- Address transition core issues due to changes in ABB CE fuel for:
- Mechanical
- T-H
+ Structural
- LOCA Non-LOCA
- Nuclear Design NNN
e s
I DNB Correlation Topical
{
A!!B
~
4 DNB Correlation Topical r
~
c
.w
.g CE-1 Correlation fit to Uniform Data t
,=
r CE-1 Correlation with Tong-F Factor
- Applied to Non-uniform data O
m f
J
m
.i t
.:5 DNB Correlation Topical w,,,
2-l l_
=
- Summary
.an M
4 09 ABB
,=
4 o
i
m a
s ABB-Combustion Engineering, Inc.
- cc:
Mr. Charles B. Brinkman, Director Washington Operations l
- ABB-Combustion Engineering, Inc.
l 12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 Mr. Ian C. Rickard, Director Nuclear Licensing ABB-Combustion Engineering, Inc.
Post Office Box 500 2000 Day Hill Road Windsor, Connecticut 06095-0500 1
I
.