Informs of Rev to Commitment Re Emergency Operating Procedure Training for Plant Licensed Operators
ML20205M693
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 10/25/1988
From: Gallagher W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Butler W
Office of Nuclear Reactor Regulation
References
NUDOCS 8811030228
Download: ML20205M693 (2)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

  • ,**r=

i:

~

PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 PHILADELPHI A, PA 19101 (215) 84I 5001 JOS EPH W. G A L t.. A GH E R w%"al."'/.75"/.. October 25, 1988 Docket Nos. 50-277 50-278 Mr. W. .R. Butler, Director Project Directorate 1-2 Division of Reactor Projects I/II Office of NRR U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

SUBJECT:

Emergency Operating Procedure Training of Licensed Peach Bottom Atomic Power Station Operators

REFERENCES:

(1) January 15, 1988 letter from J. W. Gallagher (PECo) to W. R. Butler (NRC)

(2) September 9, 1986 letter from G. E. Gears (NRC) to E. G. Bauer (PECo)

Dear Mr. Butler:

Thiu letter informs you of a revision to a commitment regarding Emergency Operating Procedure training for Peach Bottom Licensed Operators. The procedures involved are titled "Transient Response Implementation Plan" (TRIP) procedures.

The referenced (1) letter committed to walk-throughs on all TRIP procedures by all licensed operators prior to restart of Peach Dottom on either the upgraded Unit 2 Control Room or the plant specific simulator after its panels had been upgraded to reflect the Unit 2 Control Room panels. The panels have been upgraded on Unit 2 to incorporate NUREG-0737 Control Room Design Review improvements. The improvements are currently being installed on Unit 3 and are planned for the plant-specific ,

simulator.

The commitment was made in response to an NRC observation in the attachment to the referenced (2) letter that operator training on the TRIP procedures was performed on a (0$

8811o30229 es1025 ffe fDR ADOCK 05000277 i PDC

l

. a.. ,

l Mr. W. R. Butler OctobDr 25, 1988 Page 2 generic simulator. Prior to 1988 such training was performed on the Limerick Generating Station simulator. Currently, training of Peach Bottom operators is performed on a Peach Bottom specific simulator.

TRIP training has been conducted for all licensed operators on the Peach Bottom simulator; however, the simulator has not yet been modified to incorporate the NUREG-0737 control panel upgrades. After installation of tne panel upgrades in the Unit 2 Control Room, all licensed operators and Shift Technical Advisors were administered panel walk-throughs with specific emphasis on use of the enhanced instrumentation and labeling durJng implementation of the TRIP procedures. The operations crews are aware of the differences between the simulator and the upgraded control room panels. The panel upgrades primarily consist of improved instrument and switch labeling for human factors considerations. Only a few instruments are moved as part of the upgrades. They are moved to more logical locations within close proximity to their former locations. Considering the nearly identical control panel designs at the Peach Bottom simulator and actual control Room, we believe that the NRC concern regarding the previous use of a generic simulator has been addressed, and that the use of the Peach Bottom simulator as currently designed provides an effective facility for training operators on the use of TRIP procedures. The NUREC-0737 amprovements to the Control Room panels provide additional confidence that the operators can use the TRIP procedures proficiently in response to actual transients.

If you have any quescions or require additional information, please do not hesitate to contact us.

Very truly yours, b

cc Addrennee W. T. Russell, Administrator, Region I, USNRC R. E. Martin, USNRC PB Project Manager T. P. Johnson, USNRC Senior Resident Inspector T. E. Magette, State of Maryland J. Urban, Delmarva Power J. T. Iloettger, Public Service Electric & Gas II . C. Schwemm, Atlantig Electric