Forwards SER Accepting Guidance of EPRI Topical Rept BWRVIP-47 for Inspection & Flaw Evaluation of Subject safety-related RPV Internal Components,Except Where Staff Conclusions Differ from BWRVIP as Discussed in Encl SER
ML20205L957
Person / Time
Issue date: 04/07/1999
From: Strosnider J
NRC (Affiliation Not Assigned)
To: Terry C
NIAGARA MOHAWK POWER CORP.
Shared Package
ML20205L961 List:
References
TAC-MA1102, NUDOCS 9904150022
Download: ML20205L957 (6)


Text

~'

urg#

g t UNITED STATES

~

j 2

NUCLEAR REGULATORY COMMISSi WASHINGTON, D.C. 2065th-0001 April 7, 1999

...../

Carl Terry, BWRVIP Chairman Niagara Mohawk Power Company Post Office Box 63 l Lycoming, NY 13093  !

SUBJECT:

SAFETY EVALUATION OF THE "BWRVIP VESSEL AND INTERNALS PROJECT, "BWR VESSEL AND INTERNALS PROJECT, BWR LOWER PLENUM INSPECTION AND FLAW EVALUATION GUIDELINES (BWRVIP-47)," EPRI REPORT TR-108727 (TAC NO. MA1102)

Dear Mr. Terry:

i The NRC staff has completed its review of the Electric Power Research Institute (EPRI) proprietary report TR-108727 "BWR Vessel and internals Project, BWR Lower Plenum inspection and Flaw Evaluation Guideline (BWRVIP-47)." This report was submitted by letter dated December 30,1997, and was supplemented by letter dated March 3,1999. It provides generic guidelines intended to present the appropriate inspection recommendations to ensure safety function integrity of the subject safety-related RPV internal components. It also provides design information on the core plate, geometries, weld locations, and potential failure locations for the several categories of boiling water reactors (BWR/2 through BWR/6).

The staff has reviewed the BWRVIP-47 report and finds, in the enclosed safety evaluation (SE) that the guidance of the BWRVIP-47 report is acceptable for inspection and flaw evaluation of the subject safety-related RPV internal components, except where the staff's conclusions differ from the BWRVIP's, as discussed in the enclosed SE. The staff has concluded that licensee implementation of the guidelines in the BWRVIP-47 report will provide an acceptable level of quality for inspection and flaw evaluation, with modifications to address the staff's conclusions l'

In the enclosed SE, of the safety-related components addressed.

The staff request u" the BWRVIP review and resolve the issues raised in the enclosed SE, and incorporate t' + '.a,f's conclusions into revised BWRVIP-47 report. Please inform the staff within 90 days of ' .a date of this letter of your proposed actions and schedule for revisions.

3

[h gg FRJ CalTER COPY #

17 M

'~

(D c

% q wT l

@9-6'1 9904150022 990407 PDR TOPRP EXIEPRI C EP PDR

i Carl Terry Please contact C. E. (Gene) Carpenter, Jr., of my staff at (301) 415-2169 if you have any further questions regarding this subject.

Sincerely, 1

Jack R. Strosnider, Director Division of Engineering Office of Nuclear Reactor Regulation

Enclosure:

As stated cc: See next page DISTRIBUTION:

EMC9 R/F GHolahan WDLanning, R1 PUBLIC MEMayfield Bruce S. Mallet, R2 File Center TYChang JGrobe, R3 ACRS AHowell, R4 Document Name: G:\BWRVIP\BWRVIP47.LTR 3 INDICATE IN 90X: *C"= COPY W/O A1TACHMENT/ ENCLOSURE, "F"= COP /ATT/ ENCL,"ft"eNO COPY EMCB: LPM lE EMCB:SLS , lE E%:SC _/ lEI CECarpenter gj_ L KRWiC}*fkris RAHermann <f / '

03/03/199 C EMCp:( EQ ( , E DE:DD ) E DE:D E

$ 7$UC RHWesg(/ JRStrosnider

, @//V1999 3 /2D/1999 / /1999 OFFICIAL RECORD COPY T

s\6 gOOO

c Carl Teny Please contact C. E. (Gene) Carpenter, Jr., of my staff at (301) 415-2169 if you have any further questions regarding this subject.

Sincerely, Original Signed By:

Jack R. Strosnider, Director Division of Engineering Office of Nuclear Reactor Regulation

Enclosure:

As stated j cc: See next page DISTRIBUTION:

EMCB R/F GHolahan WDLanning. R1 PUBLIC MEMayfield BSMallet, R2 File Center 7 TYChang JCrobe, R3 i ACRS KRWichman AHewell, R4 Document Name: G:\BWRVIP\BWRVIP47.LTR

  • see previous concurrence INDICATE IN BOX:"C"-COPY W/O ATTACHME24TC;S! CSURE,"E"40PY W/ATT/ ENCL,"N"=NO COPY  ;

EMCB: LPM E EMCB:SLS E EMCB:SC lE j CECarpenter* , $r%g MWed.nr.

03/03/1999 @ Of18/1999 - / /1999 mm-MN 5IRIIII EMCB:(A)BC E DE:DD E DE:D [, / E l

EJSullivan* RHWessman* JRStrosnider () )

03/19/1999 03/20/1999 4 / "f/1999 /[

OFFICIAL RECORD COPY I I

~

~

- , Cari Terry Please contact C. E. (Gene) Carpenter, Jr., of my staff at (301) 415-2169 if you have any further questions regarding this subject.

Sincerely, Original Signed By:

Jack R. Strosnider, Director Divic:on of Engineering Office of Nuclear Reactor Regulation 1

Enclosure:

As stated cc: See next page DISTRIBUTION:

EMCB R/F GHolahan WDLanning, R1 PUBLIC MEMayfield BSMallet, R2 l

File Center TYChang JGrobe, R3 '

ACRS KRWichman AHowell, R4 1

Document Name: G:\BWRVIP\BWRVIP47,LTR

  • see previous concurrence INDICATE IN BOX: *C"= COPY W/O ATTACHMENTENCLOSURE,"E"= COPY W/ATTENCL, *N" NO COPY l EMCB: LPM E EMCB:SLS E EMCB:SC E CECarpenter*

RAHetmann* K ~.*/ ;c T,;, ,

03/0

_.3/s 3.. b _- -03/18/1999 / /1999 EMCu.ga)SC E DE:DD E DE:D [s / E E.'Sullivan* RHWessman*

JRStrosnider ()

03/19/1999 03/20/1999 4 i "f/1999 /[

V OFFICIAL RECORD COPY

a

- Carl Terry Please contact C. E. (Gene) Carpenter, Jr., of my staff at (301) 415-2169 if you have any further questions regarding this subject.

Sincerely,

& bs Jack R. Strosnider, Director Division of Engineering Office of Nuclear Reactor Regulation

Enclosure:

As stated cc: See next page l

1

. }

'. ~ cc:

- o George Jones, Executive Chairman Steve Lewis, Technical Chairman BWRVIP Assessment Task BWRVIP Assessment Task Pennsylvania Power & Light Entergy A6-1 P. O. Box 756 Two North Ninth Street Waterloo Road Allentown, PA 18101 Port Gibson, MS 39150 l

l Joe Hagan, Executive Chairman Carl Larsen, Technical Chairman i BWRVIP inspection Tast: BWRVIP inspection Task l PECO Energy Yankee Atomic  ;

, 965 Chesterbrook Blvd. 580 Main Street '

MC 62C-3 Bolton, MA 01740 Wayne, PA 19087-5691 Lewis Sumner, Executive Chairman John Wilson, Technical Chairman BWRVIP Mitigation Task BWRVIP Mitigation Task Southern Nuclear Operating Co. Clinton Power Station, M/C T-31C 40 invemess Center Parkway P.O. Bnx 678 Birmingham, AL 35201 Clinton,IL 61727 Robert Carter, EPRI BWRVIP Vaughn Wagoner, Technical Chairman Assessment Manager BWRVIP Integration Task Greg Selby, EPRI BWRVIP Carolina Power & Light Company j inspection Manager One Hannover Square 9C1 l EPRI NDE Center P.O. Box 1551 P. O. Box 217097 Raleigh, NC 27612 1300 W. T. Harris Blvd.

Charlotte, NC 28221 Bruce McLeod, Technical Chairman BWRVIP Repair Task Southern Nuclear Operating Co.

Post Office Box 1295 40 Inverness Center Parkway Birmingham, AL 35201 Warren Bilanin, EPRI BWRVIP Integration Manager Raj Pathania, EPRI BWRVIP Mitigation Manager Ken Wolfe, EPRI BWRVIP Repair Manager Electric Power Research Institute P. O. Box 10412 3412 Hillview Ave.

Palo Alto, CA 94303 I

l

...