ML20205L281

From kanterella
Jump to navigation Jump to search
Notification of 990413 Meeting with NEI & Public Stakeholders in Rockville,Md Re Followup to 990317 Commission Meeting.Second Rev to Change Meeting Location
ML20205L281
Person / Time
Issue date: 04/12/1999
From: Dudley R
NRC (Affiliation Not Assigned)
To: Masnik M
NRC (Affiliation Not Assigned)
References
PROJECT-689 NUDOCS 9904140208
Download: ML20205L281 (4)


Text

-

SECOND REVISION TO CHANGE MEETING LOCATION MEMORANDUM TO: Michael T. Misnik, Chi:f necommissioning Section Project Directorate IV & Decommissioning Division of Licensing Project Management Office of Nuckear Reactor Regulation ORIGINAL SIGNED BY:

FROM:

Richard F. Dudley, Senior Project Manager Decommissioning Section Project Directorate IV & Decommissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING MEETING WITH THE NUCLEAR REGULATORY COMMISSION (NRC), THE NUCLEAR ENERGY INSTITUTE (NEl),

AND PUBLIC STAKEHOLDERS REGARDING A RISK-INFORMED APPROACH TO DECOMMISSIONING REGULATIONS DATE AND TIME:

Tuesday, April 13,1999 1:00 p.m. - 4:00 p.m.

LOCATION:

U S. Nuclear Regulatory Commission 11555 Rockville Pike,01-G16 - Commission Hearing Room Rockville, Maryland 20852 PURPOSE:

As followup to the March 17,1999, Commission meeting, the NRC staff is soliciting the industry and public to provide information that could assist the staff in developing a risk-informed approach N decommissioning regulations.

PARTICIPANTS:*

NRC NEl S. Coilins, NRR M. Meisner J. Zwolinski, NRR Lynette Hendricks S. Richards, NRR Alan Nelson, et al.

J. Hannon, NRR M. Masnik, NRR, et al.

Project No. 689 I

D cc: See next page

$03M CONTACT:

R. Dudley, NRR 415-1116

  • Meetings between the NRC technical staff arid applicants or licensees are open for interested members of the public, petitioners, interveners, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meeting Open to the Public," 59 Federal Reaister 48344,9/20/94.

1/ 9' DISTRIBUTION: (See next page) 1 STC\\NEl dM.WPD DOCUMENT NAME: G:\\S

' T+ rece6ve a cop r of trws docu inace en the box:

oopy without 6 es "E" = Cop" with enclosures "N" = No copy OFFICE PDIV-D/lWidV~

PDIV/LA @ l/

PDIN/ sos l l

l l

NAME RDudley V l CJamersol, d~

MMasnik /(V DATE 04(J99 i ~

04Q99 04 @ 99 T

~'

OFF.'CIAL RLT,ORD COPY 9904140208 990412 944g

$kk &f n

,e

e DOCUMENT NAME: G:\\SECY\\MTG_NOTC\\NEIDECOM.WPD Distribution: Mfg. Notice w/NEl Re Decommissioning Hard Coov g g.,

PUBLIC PDIV-D R/F RDudley OGC ACNW SMagruder TWFN Receptionist OWFN Receptionist EMail SCollins/RZimmerman BSheron WKane JZwolinski/SBlack DMatthews SRichards MMasnik SMagruder GTracy, OEDO PMNS OPA JRuthberg WReckley JHannon VOrdaz CJamerson a

RBarrett TJohnson JHickey

. JGreeves s

i i

i

g.

o f>Q QEC%>,t UNITED STATES y-l.

3 8

NUCLEAR REGULATORY COMMISSION f

WASHINGTON, o.C. 20555-0001 April 12, 1999 SECOND REVISION TO CHANGE MEETING LOCATION MEMORANDUM TO: Michael T. M.isnik, Chief Decommissioning Section Project Directorate IV & Deccmmissioning Division of Licensing Project Management

' Office of Nuclear Reactor Regulation n*

)

FROM:

Richard F. Dudley, Senior Project Manag

]

Decommissioning Section Project Directorate IV & Decommissioning '

j Division of Licensing Project Management Office of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING MEETING WITH THE NUCLEAR REGULATORY COMMISSION (NRC), THE NUCLEAR ENERGY INSTITUTE (NEI),

AND PUBLIC STAKEHOLDERS REGARDING A RISK-INFORMED APPROACH TO DECOMMISSIONING REGULATIONS i

i DATE AND TIME:

Tuesday, April 13,1999 1:00 p m - 4:00 p.m.

LOCATION:

U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike,01-G16 - Commission Hearing Room Rockville, Maryland 20852 PURPOSE:

As followup to the March 17,1999, Commission meetirg, the NRC staff is soliciting the industry and public to provide information that could assist the staff in developing a risk-informed approach to decommissioning l

regulations.

l l

PARTICIPANTS:*

NRC NEl S. Collins, NRR M. Meisner J. Zwolinski, NRR Lynette Hendricks S. Richards, NRR Alan Nelson, et al.

J. Hannon, NRR M. Masnik, NRR, et al.

Project No. 689 cc: See next page -

CONTACT:

R. Dudley, NRR I

415-1116 I

  • Meetings between the NRC technical staff and applicar ts or licensees are open for interested members of the public, petitioners, interveners, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meeting Open to the Public," 59 Federal Reaister 48344, 9/20/94.

e

,c

' Nuclear Energy Institute cc:

Mr. Ralph Beedle Ms. Lynnette Hendricks, Director

'snior Vice President Plant Support and Chief Nucleer Officer Nuclear Energy institute Nuclear Energy Institute Suite 400 Suite 400 1776 i Street, NW 1776 i Street, NW Washington, DC 20006-3708 Washington, DC 20006-3708 Mr. Alex Marion, Director Mr. Charles B. Brinkman, Director Programs Washington Operations l

Nuclear Energy Institute ABB-Combustion Engineering, Inc.

Suite 400 12300 Twinbrook Parkway, Suite 330 1776 i Street, NW Rockville, Maryland 20852 Washington, DC 20006-3708 Mr. David Modeen, Director j

Engineering Nuclear Energy Institute Suite 400 1776 i Street, NW Washington, DC 20006-3708 Mr. Anthony Pietrangelo, Director Licensing Nuclear Energy Institute Suite 400 1776 l Street, NW Washington, DC 20006-3708 Mr. Nicholas J. Liparulo, Manager Nuclear Safety and Regulatory Activities

]

Nuclear and Advanced Technology Division I

Westinghouse Electric Corporation P.O. Box 355 Pittsburgh, Pennsylvania 15230 Mr. Jim Davis, Director Operations-Nuclear Energy Institute Suite 400 1776 i Street, NW Washington, DC 20006-3706