Responds to NRC Re Violation Noted in Insp 70-1100/85-08.Corrective Actions:Internal Log Sheet for Seals Revised Before Audit Completed.Rev Requires Person Applying Seal to Note Time of Application & Sign Log
LD-89-122, Advises That Bioassay Program Used Since Last Quarter 1988 Includes Semiannual Lung Counting for All Personnel & Fecal & Urinalysis Sampling for Highest 25% of Pellet Shop Personnel,Per Notice of Violation
LD-89-127, Confirms Telcon Re Interpretation of License Requirements for License SNM-1067.Understands That Shipping Containers Covered by Certificates of Compliance & DOT Regulations.Sets of Trailers Will Be Separated by at Least 20 Ft
LD-89-129, Informs of Retirement of Pl Mcgill & Interim Appointment of CR Waterman as Vice President of Nuclear Fuel.All Correspondence to Pl Mcgill Attention Should Be Directed to CR Waterman Effective Immediately
LD-89-146, Forwards Amended Application for Renewal of License SNM-1067,replacing Parts 1 & 2 of License Renewal Application Submitted by Pl Mcgill .Application Describes Facility Intended Configuration & Operation
LD-90-003, Forwards Updated Pages for 881206 & 890727 Requests for Amends to License SNM-1067 Re Specific Criticality Safety Criteria,Liquid Wastes,Internal Exposure,Product Development & External Exposure (Dosimetry Requirements)
LD-90-004, Forwards Amend to Physical Security Plan,Eliminating Position of Vice President Due to Pl Mcgill Retirement.Amend Withheld (Ref 10CFR2.790)
ML20006C091
LD-90-024, Responds to NRC Re Violations Noted in Insp Rept 70-1100/89-03.Corrective Action:Responsibility for Individuals Taking &/Or Evaluating Bioassay Will Be Clarified in Future
ML20042G158
LD-90-027, Responds to NRC Re Violations Noted in Insp Rept 70-1100/89-07.Corrective Actions:Desirable Location for Residue Storage Trailer,Minimizing Trailer Movement, Established & Training Session Conducted
ML20042F146
ML20042G322
LD-90-039, Informs of Organizational Changes Affecting Reporting Chain for Selected Individuals Involved in Implementation of Fnmcp.Licensee Has Determined That Changes Do Not Decrease Effectiveness of Plan & as Such,Changes Implemented
LD-90-042, Forwards Rev 1 to EPIP 3.01, Fire/Explosion, for Info. Meeting W/Town of Windsor Fire Chief Held on 900612 Re Needs of Fire Dept in Response to Emergency Situations at Facility
ML20055F819
LD-90-048, Forwards Certification of Financial Assurance for Decommissioning Under License SNM-1067
LD-90-055, Forwards Request for Withdrawal of 900213 Amend Request to License SNM-1067
LD-90-068, Advises That Planned Work in Redeployed Pellet Shop of Facility Includes Relocating Centrifuge Sys from Present Location
LD-90-067, Advises That Redeployed Pellet Shop in Windsor Fuel Mfg Facility Needs Reconfiguring to Accommodate New Pellet & Rod Handling Equipment.Necessary Walls,Ceilings & Structural Steel Will Be Erected to Permit Installation
LD-90-077, Withdraws 881206 Application for Amend to License SNM-1067 & 890727 & 900117 Submittals of Addl Info
License SNM-1067 Docket 70-1100 il February 5. 1986 l
1 I
J U. S. Nuclear Regulatory Commission
]
Region I
}
631 Park Avenue King of Prussia, Pennsylvania 19406 j
Attention:
Mr. Thomas T. Martin i
+
Reference:
1.etter from Thomas T. Martin, NRC, to 11. V. Lichtenberger CE, l
dated January 27, 1986; Inspection No. 70-1100/85-08 1
Dear Mr. Martins This is in reply to the above referenced letter in which it was reported that as a result of the subject investigation, one of our activities was i
not conducted in full compliance with NRC requirements. Our response to the notice of violation, identified as Appendix A to the referenced letter, is as follows:
l i
i Appendix A Section 7.4, " Tamper-Indicating", of your NRC approved Fundamental Nuclear Material Control Plan, Revision 5, dated February 1983, states in paragraph
]
7.4.7 " Precise records of each and all seals by serial number will be kept i
and, after application, will include data on scaled contents. These records I
j will include the seal number, item being sealed, date and time of appitcation/
disposal of the scal, the signature of the individual responsibic for apply-ing and removing thn seal, and any discrepancy that in observed in the j
i scaled contents."
Contrary to the above, on December 11, 1985, the inspector noted that between j
the period of November 11, 1985 and December 11, 1985, the records of the time of appitcation of seals and the signature of the individual responsible for l
l applying the seals were not kept.
l i
f i
I i
l 1
i
)
i 1
Power Systems 1000 Prottn.t nit Ho.uj (2a))criato11 Comtn. hon Eng neonno. Inc.
Post Ottco Don 500 icion in297 y$
Walwr, Conn,v.tcut OUD5 0500 I
l
m
Response
The internal log sheet for seals was revised before the inspectors had completed their audit. The revised log sheet stipulates that the individual applying the seal notes the time of application on the log and signs the log to attest to the fact that the seal was applied as required.
Very truly yours, COMilUSTION ENGINEERING, INC.
O a k l~ b. +
11. V. Lichtenberger Vice President, Nuclear l'uel DLP:llVL:sas l