ML20205J823

From kanterella
Jump to navigation Jump to search
Discharge Monitoring Rept for Feb 1987
ML20205J823
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 02/28/1987
From: Rivers M
TENNESSEE VALLEY AUTHORITY
To:
References
NUDOCS 8704010430
Download: ML20205J823 (11)


Text

_ _..

w l

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT DISCHARGE MONITORING REPORT Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT DSN 101 - Diffuser Discharge Structure MONTH Februarv liRZ NPDES # ALOO22080 PARAM FLOW pH 9ggg,Rgyer, gpwgyt9ggg, gpggpt9ggg, gpyggt9ggg, Tempfggture AVG 6.0 24hr Av Max 24hr Av Max 6hr Averaae Hourly Max 24hr Av Max MAX 9.0 90.0 92.0 93.0 10.0 UNITS MGD s u.

FREQ.

Cont.

1/wk Continuous Continuous Continuous Continuous Continuous i

1 633.6 44.3 43.8 0.0 44.3

-0.4 2

633.6 44.8 44.2 0.0 44.6

-0.4 3

633.6 45.3 44.8 0.0

- 45.3

-0.4 4

633.6 8.0 45.4 44.9 0.0 45.3

-0.3 5

633.6 45.7 45.3 0.0 45.9

-0.3 6

633.6 7.9 46.1 45.7 0.0 46.0

-0.2 7

633.6 46.0 45.7 0.0 46.3

-0.1 8

633.6 46.4 45.9 0.0

- 46.3

-0.2 9

633.6 46.2 45.7 0.0 45.4 0.4 10 633.6 7.9 44.7 44.8 0.0 45.4 0.5 11 633.6 45.8 45.4 0.0 45.9 0.1 12 633.6 47.3 46.6 0.0 47.7

-0.3 13 633.6 48.1 47.5 0.0 48.8

-0.4 j

J4 633.6 48.6 48.1 0.0 48.1 0.0 15 633.6 49.2 48.3 0.0

'49.4

-0.6 16 633.6 49.6 49.2-0.0 50.1 0.0 17 633.6 7.8 48.0 47.9 0.0 47.9 0.0 1

18 633.6 47.6 47.4 0.0 47.2 0.0 19 316.8 46.4 46.3 0.0 46.5 O.4 20 633.6 46.1 46.2 0.0 46.4 0.4 21 633.6 46.2 46.2 0.0 46.4 0.0 22 633.6 44.9 44.5 0.0 44.7

-0.1 23 633.6 46.7 46.4 0.0 46.8

-0.2 24 633.6 7.6 46.8 46.4 0.0 46.7

-0.2 25 633.6 47.0 46.7 0.0 47.4

-0.2 26 633.6 47.4 47.2 0.0 47.3

-0.1 27 633.6 47.2 47.0 0.0 46.5

-0.1 28 633.6 46.6 46.1 0.0 46.6

-0.2 MAX 633.6 8.0 49.6 49.2 0.0 50.1 0.5 AVG 622.3 46.6 46.2 0.0 46.6

-0.1 MIN 7.6 I certify under penalty of law that this document and all attachments were prepared under the direction or supervision in accordance with a systen designed to assure that qualified personnel properly gather and evaluate the information submitted.

Based on my inquiry of the person or persons who canage the systen, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.

I an aware that there are significant '

l pond 1 ties for subsitting false information, including the possibility of i

fing and imprisonment for knowing violations.

I.

Signature of Responsible Of ficial Dates g

8704010430 B70228 C) yDR ADOCK 05000259

.m;

. i_ _,.

1s PDR

J ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT DISCHARGE MONITORING REPORT i

Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT 1

DSN 102 - Sedimentation Pond i

j MONTH February 199Z NPDES # ALOO22080 PARAM FLOW pH 04:G TSS l

l AVG MIN. 6.O 15 30 MAX 9.0 20 100 COMPENTS UNITS MGD s.u.

ma/1 ma/1 FREQ.

1/RFaF4SE 1/PFIF4SE 1/RFIF4SE 2/RetFASE i

1 NO RFIFASE l

2 FOR THE MONTH 3

j r.

5 6

7 8

9 10

~

11

~1

~

12 l

13 14 1

15 l

16 17 i

18

)

19 20 l

21 22 23 24 25 26 1

27 28 MAX t

AVG MIN TOTAL 0.000000

~

I certify under penaity af Jan that this document and all attacheents were prepared under the direction or supervision in accordance with a systen designed to assure that qualified personnel properly gather and evaluate the inforestion submitted.

Based on ny inquiry of the person or persons who Donage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knanledge and bollef, true, accurate, and complete.

I an aware that there are significant penalties for submitting false information, including the possibility of fin 2 and imprisonment for knowing violations.

l Signature of Responsible Official Dates a

I j

  • ,h, g

^:,

t..,

a s n. s ~ ~. 5 Ebu ~.

>re ',Ah Y

,4 l

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT l

DISCHARGE MONITORING REPORT l

Tennessee Valley Authority i

BROWNS FERRY NUCLEAR PLANT t

DSN 103 - Unit 1,2,3 Turbine Station Sump MONTH February 1f92 NPDES # AL0022000 i

PARAM FLOW 04:S TSS AVE 15 30 MAX 20 100 COMPENTS UNITS MGD ma/1 ma/1 FREQ.

1/ WEEK 1/ WEEK 1/MFFK 1

2 3

I 4

I 5

O.122976 5

9 6

7 8

9 1

10 11

_[

12 0.103464 5

8 13 14 16 17 18 19 O.068064 5

6 j

20 l

I 21 22 1

-l 23 l

24 25 7

i 26 0.094008 5

6 i

27 28 MAX 0.122976 5

9 AVG 0.097128 5

7 l

I certify nder penalty of law that this document and all attachments were propared.under.the direction er supervision in accordance with a systen dasigned -to_. assure that qualified personnel properly gather and evaluate the d

information submitted.

Based on ny inquiry of the person or peiwans who Dancge the systen, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knanledge and belief, true, accurate, and complete.

I an aware that there are significant pensities for submitting falso information, including the possibility of fing and imprisonment for knowing violations.

Signature of Responsible Of ficial Dates al)'

t m

t

~. +

. ~a-

.a

_ _ _ _. _ ~ _ _

I ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT DISCHARGE MONITORING REPORT Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT DSN 104 - Liquid Radwaste

{ MONTH February 1987 NPDES # ALOO22080 j

PARAM FLOW O&G TSS LDT/TSS LDT/O&G Copper Iron AVG 15 30 30 15 l

MAX 20 100 100 20 1.0 1.0 UNITS MGD ma/L ma/L ma/L ma/L ma/L ma/L FREQ.

1/ BATCH 2/wk 2/wk 1/ BATCH 1/ BATCH 1/ BATCH 1/ BATCH 1

0.060284 2

l 3

0.061733 5

2 j

4 0.041804 5

0.048416 5

2 6

0.020390 7

0.058378 8

0.051906 9

1 10 0.033237 5

1 11 0.032451 12 0.032671 13 0.029598 5

1 14 0.033010 15 2

16 17 18 19 0.031722 5

1 1

20 0.032271 5

1 l

21 0.029282 l

22 0.026654 f

23 j

24 0.040494 5

1

)

25 0.064717 l

26 0.032671 5

1 27 0.025381 l

28 0.027596 I

MAX O.064717 5

2 AVG O.038794 5

1 i

I certify under penalty of Jan that this document and all attachments were

)

prepared under the direction or supervision in accordance with a systen

\\

designed to assure that qualified personnel properly gather and evaluate the

{

information submitted.

Based on ny inquiry of the person or persons who canage the systen, or those persant directly responsible for gathering the l

information, the information submitted is, to the best of my knowledge and

}

b211e f, true, accurate, and complete.

I an aware that there are significant ponalties for submitting false information, including the possibility of l

1 fine and imprisonment for knowing violations.

.\\

I

)

Signature of Responsible Official Dates j

5

_..)

= - - _,...

l.

ALA?AMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT DISCHARGE MONITORING REPORT Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT DSN 105 - Residual Heat Removal

~

Service Water l MONTH February

Lig2, NPDES # ALOO22080 PARAM FLOW TEMP AVE MAX COMMENTS i

UNITS MGD v

l FREQ.

1/KFK 1/wFK 1

j 2

j 3

4 2.160 54 5

6 7

l B

9 10 11 12 NO FLOW

~

13 l

14

~

15 l

16 l

17 i

18 NO FLOW 1

~

19

'j 20 21 22 23

^

24

+

25 NO FLOW I

26 i

27 28 MAX 2.160 54 4

l AVG 2.160 54 I certify under penaity af Jan that this document and all attachments were prepared under the direction or supervision in accordance with a.systen dosigned to assure that qualifled personnel properly gather and _ey_aluate the information submitted.

Based on ny inquiry of the person or persons who canage the systen, or those persons directly responsible for gathering the 1

information, the information submitted is, to the best of my knanledge and l

b211ef, true, accurate, and complete.

I an aware that there are significant i

p2noities for subaitiing iaise infornation, Ancluding the possibility af I

fino and imprisonnent for knowing violations.

l i

j Signature af Responsible Official Dates

]'

a l

't

>%h

' A 3*t w a 4

ow < -

6 gl ngs,,, n o_ g

,mw=,,4 t

ALAEAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT DISCHARGE MONITORING REPORT Tcnn:3acos Vallcy Authority BROWNS FERRY NUCLEAR PLANT i

DSN 106 - Condenser Cooling Water Station Sump l MONTH February 1TgZ NPDES # ALOO22080

{

PARAM FLOW D&G TSS AVG 15 30 MAX 20 100 COMMENTS UNITS MSD ma/1 ma/1 FREQ.

1/ WEEK 1/WFFK 1/WFFK 1

NO DISCHARGE. inriPORARILY 2

ROUTED TO DSN 102 3

4 5 NO DISCHARGE l

6 i

7 8

9 10 11

"~

12 13 NO DISCHARGE 14

~

l 15 16 17 18 19 20 NO DISCHARGE 21 22 23 24 25 26 27 NO DISCHARGE 28 MAX AVG NO DISCHARGE I certify under penalty of law that this document and all attachments were prepared under the direction or supervision in accordance with a system d3 signed to assure that qualified personnel properly gather and evaluate the information submitted.

Based on my inquiry of the person or per.go2s who canage the systen, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knanledge and belief, true, accurate, and complete.

I an aware that there are significant p2nalties for submitting false information, including the possibility of fin 2 and imprisonment for knowing violations.

i Signature of Responsible Official Dates 3

fj I

m

. -.. _ A : _ i. _.

_,_. i l

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT DISCHARGE MONITORING REPORT Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT DSN 107 - Unit 3 Control Bldg.

Drain MONTH February 1.TSZ NPDES # ALOO22080 PARAM FLOW O&G TSS AVG 15 30 MAX 20 100 COMMENTS UNITS MGD ma/1 ma/1 FREQ.

1/ WEEK 1/ WEEK 1/WFFK 1

2 3

4 0.001543 5

1 5

~

l 6

7 8

10 0.001350 5

3 11

~~

12 l

13 14 15 16 17 0.001350 5

1 18 19 20 21 22 23 24 0.005400 5

1 25 26 27 28 MAX O.005400 5

3 AVG O.002411 5

2 I certify under penalty of law that this document and all attachments were prepared under the direction or supervision in accordance with a system d2 signed to assure that qualified personnel properly gather and evaluate the information submitted.

Based on my inquiry of the person or persons who OGntge the systen, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knanledge and b211ef, true, accurate, and complete.

I an aware that there are significant p2nalties for submitting false information, including the possibility of h

fin 2 and imprisonnent for knowing violations.

Signature of Responsible Official Dates

,, s, ;,,

a.. 4. w..

.s

[

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT DISCHARGE MONITORING REPORT Tcnnocacc Valley Authority BROWNS FERRY NUCLEAR PLANT l

DSN 108 - Diesel Bldg. Sump Units 1 & 2 MONTH February 1.?.E.7 NPDES # ALOO22080 PARAM FLOW O&G TSS AVG 15 30 MAX 20 100 COMMENTS LNITS MGD ma/1 ma/1 FREQ.

1/wrK 1/wEK 1/wrK 1

NO DISCHARGE FOR THE MONTH 2

3 4

NO RELEASE 5

i 6

l 7

8 9

10 NO RELEASE 11 12 14 15

}

16

~

17 NO RELEASE 18 4

19 20 21 22 l

23 24 NO RELEASE 25 26 27 28 MAX AVG NO RELEASE I certif y under penalty of law that this document and all attachments were prepared under the direction or supervision in accordance with a systen d2 signed to assure that qLalified personnel properly gather and evaluate the information submitted.

Based on ny inquiry of the person or persons who canage the systen, or those persons directly responsible for gathering the l

information, the information submitted is, to the best of my knanledge and b211ef, true, accurate, and complete.

I an aware that there are significant p2nsities for submitting false information, including the possibility of fins and imprisonment for knowing violations.

Signature of Responsible Official Dates

.w L

-. _ ~

~

l ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEPENT DISCHARGE MONITORINS REPORT Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT DSN 109 - Diesel Bldg. Sump Unit 3

MONTH February 129Z NPDES # ALOO22080 PARAM FLOW 08:5 TSS AVG 15 30 MAX 20 100 COMMENTS

l. NITS MGD ma/1 ma/1 i

FREQ.

1/wrK 1/tdFEK 1/wrK 1

NO DISCHARGE FOR THE MONTH 2

3 4

NO RELEASE 5

6 7

8 9

~~~~

10 11 NO RFIF4SE

~

12 13

~~

14 i

15 16 17 NO RELEASE 18 19 20 21 22 23 24 NO RELEASE 25 26 2*/

28 MAX AVG NO RELEASE m ~w,..

I certify under penalty of law that this document and all attachments were prepared under the direction or supervision in accordance with a.systen designed to assure that qualified personnel properly gather and evaluate the

.information submitted.

Based on ny inquiry of the person or persons who canage the systen, or thnse persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and

~

b211e f, true, accurate, and complete.

I an aware that there are significant penalties for submitting falso information, including the possibility of y._

i fin 2 and imprisonment for knowing violations.

,W Signature of Responsible Official Dates T

y

..m, O

M.[

s.

t 4%;hn

.e m mmw A t

- -~

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT DISCHARGE MONITORING REPORT Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT l

DSN 110 - Unit 1 8: 2 Office Bldg. Drain i

MONTH February 1987 NPDES # ALOO22000 i;

PARAM FLOW 04:6 TSS 3

AVG 15 30 MAX 20 100

~

COMMENTS UNITS MED ma/1 ma/1 FRFQ.

1/KFK 1/ WEEK 1/wrK 1

2 3

4 O.000196 7

12 5

6 7

8 9

i 10 0.000196 5

6 11 4

j 12 13 14 j

15 16

)

17 0.000180 5

15 18 j

19

{

20 21 22 23 24 0.000360 7

31 25 26 27 28 MAX O.000360 7

31 AVG O.000233 6

16 I certify under penalty of law that this document and all attachments were

. g:

prepared under the direction or supervision in accordance with le-systen l

dasigned to assure that qualifled personnel properly gather and evaluate the

-information submitted.

Based on my inquiry of the person or persons who canage the system, or those persons directly responsible for gathering the l

information, the information submitted is, to the best of my knowledge and l

b211e f, true, accurate, and complete.

I an aware that there are significant

.p2nalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.

l Signature of Responsible Official Date

_9 4i.

? '

I

.(a i

w*

QL -

.a n-.i~ +.- $0l.Yn.u w :.

.www-Al n,

-n

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT DISCHARf;E MONITORING REPORT Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT j

DSN 111 - Sewage Treatment Lagoon

! MONTH February 129Z NPDES # ALOO22000 PARAM FLOW TSS BOD 5 AVG 90 30 MAX 45 COMMENTS UNITS MED ma/1 ma/1 FRFQ.

5/MFFK 2/ MONTH 2/ MONTH 1

2 O.039600 41 22 3

0.039600 4

O.039600

~ ^

'S~

5 0.031248 6

0.039600 7

8 9

O.017856

. - ~ l 10 0.017856 56 27 11 0.017856 12 O.024048 13 0.024048 14 15 16 0.049248 17 0.039600 31 26 18 0.039600 i

19 0.031248 29.

O.031248 l

2D 22) 23 I

O.039600 24 0.039600 52 34 I

20 0.039600 26 O.049248 27 O.117072 28 MAX O.117072 56 34 AVG O.03G369 45 27 I

I certify under penaity af law that this document and all attachments were prepared under the direction or supervision in accordance with k-eysten j

designed to assure that qualified personnel properly gather and evaluate the information submitted.

Based on my inquiry of the person or persons who canage the systen, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and I

belief, true, accurate, and complete.

I an aNare that there are significant p2nalties for submitting false information, including the possibility of fins and imprisonment for knowing violations.

Signature of Responsible Official Dates

, +

?

4gm-eamm.,.

e5 N'

dM'.

aW# 'b d=M gd a

Y s.

  • 4-

-. - -