Forwards Rev to Estimate of Util Needs for Operating Licensing Exams for Next Four Fys,Per NRC
ML20205J616
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 10/24/1988
From: Marbaugh K
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8810310444
Download: ML20205J616 (3)


Text

- .

- S Consumers power POWERING MKH0GAN'S PROGRESS General Offices: 1945 West Pernell Road, Jock en q. MI 492C1 * (517) 788 0550 October 24, 1988

\

Nuclear Regulatory Commission Document Centrol Desk k'ashington, DC 20555 DOCKET 50-155 - L.' CENSE DPR BIG ROCK POINT PLANT -

REVISION TO OPERATLR LICENSING EXAMINATION NEEDS ESTIMATE Consumers Power Company letter of September 1, 1988 provided an estimate of Big Rock Point's needs for operator licensing examinations ar.d requalifica-tion exan'nationa for the next four fiscal years, as requested by NRC letter dated August 8, 1988 Since that tine, new estimates have been developed. This new information is attached.

Kenneth E Marbaugh Plant Licensing EnFiaeer CC Administrator, Region III NRC NRC Resident Inspector - Big Rock Point Attachment y

OC1088-0175-NLa4 yA 'A8ste---- 3sa8h _ne- l

\

. A Enclosure 1 PROPOSED OPERATOR LICENSING EXAMINATION SCHEDULE FORMAT Big Rock Point NRC Region rir l Faci. ./

FY 1989 FY 1990 FY 1991 FY 1992 (10/1/88-9/30/89) (10/1/89-9/30/00) (10/1/90-9/30/91) (10/1/91-9/30/92)

'r , - , "-- *

1. Date h 7 3 3 2
  1. RO L 9
  1. 5R0 Instant i e

? i e

  1. SRO Upgrade _,
  1. SRO Limited _

l t

2. Date
  1. RO i
  1. SRO Instant 1
  1. SRO Upgrade
  1. SRO Limited _ ,

Please indicate initial cold license examinations by placing an asterisk (*) ,

by the date. Please indicate examinations inteitded to extend an Operator's '

license to a second or subsequent unit with two asterisks (") (e.g., if Unit One is in operation and Unit Two is approaching fuel lond anJ three R0 candidates l with no previous license are to be examined on both Units One and Two and five ,

RO candidates licensed on Unit One are to be examined to extend their licenses to '

Unit Two, then indicate "R0 3,5**.")

Enclosure 2 PROPOSED REQUALIFICATION EXAMINATION SCHEDULE FORMAT Facility Big Rock Point NRC Region III FY 1989 FY 1990 FY 1991 FY 1992 (10/1/88-9/30/89) (10/1/89-9/30/90) (10/1/90-9/30/91) (10/1/91-9/30/92)

1. Date 10/27/88 Date20/3/ea Cate 'n/9/+c Da te io /1/ 01
2. Date ,,/i./A3 Date,neo/a, Date 10/o/90 Da te 20/8 /o1
3. Date 11/11/83 Date11/2/89 Date 10/16/90 Da te10/15/91
4. Date 11/16/88 Date11/7/89 Date 10/23/90 Da te 10/22/91 5 Date 11/23/88 Date11/1L/89 Date 10/30/03 Date10/?Q/01