ML20205J478
| ML20205J478 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 01/29/1986 |
| From: | Varga S Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20205J482 | List: |
| References | |
| NUDOCS 8602260026 | |
| Download: ML20205J478 (8) | |
Text
.
/
~%,
UNITED STATES
[
g NUCLEAR REGULATORY COMMISSION D
E _
WASHINGTON, D. C. 20555 s.,*sa*j PUBLIC SERVICE ELECTRIC AND GAS COMPANY PHILADELPHIA ELEGIRIC COMPANY DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELEGIRIC COMPANY
~
DOCKET NO. 50-272 SALEM NUCLEAR GENERATING STATION, '.' NIT N0.1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.70 License No. DPR-70 3
The Nuclear. Regulatory Comission (the Comission) has found that:
1.
A.
The application for amendment by Public Service Electric and Gas Company, Philadelphia Electric Company, Delmarva Power and Light Company and Atlantic City Electric Company (the licensees) dated August 6, 1985, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the ^
Comission; C.
There is reasonable assurance (i) that the activities authorized 9
by this amendment can be conducted without endangering the health-and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-70 is hereby amended to read as follows:
8602260026 860129 DR ADOCK 05000272 p
PDR l
[
e
" (2) Technical Specifications The Technical Specifications contained in Appendicis A and B, as revised through Amendnent No. 7u, are t:
hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
{
Q w 's Steven A. Var
. Director l(,pPWRProjectDirectorate#3
(
Division of PWR Licensing-A
Attachment:
Changes to the Technical Specifications Date of Issuance: January 29, 1986
~
~
1 i
e i
k ATTACHMENT TO LICENSE AMENDMENT NO. 70 FACILITY OPERATING LICENSE N0. DPR-70 DOCKET NO. 50-272 Revise Appendix A as follows:
Remove Page Insert Page 3/4 8-9 3/4 8 9 G
C e
i
s
~
ELECTRICAL-POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) 2.
The pilot cell specific gravity, corrected to 77'F and full electrolyte level, is greater than or equal to 1.200.
3.
The pilot cell voltage is greater than or equal to 2.08 volts.
4 The overall battery voltage is greater than or equal to 125 vol ts.
At least once per 92 days by verifying that:
b.
1.
The voltage of each connected cell is greater than or equal to 2.13 volts under float charge and has not decreased more than 0.27 volts from the value observed during the original accept
?-
ance test.
2.
The specific gravity, corrected to 77"F and full electrolyte level, of each connected cell is greater than or equal to 1.200 and has not decreased more than 0.02 from the value ob-served during the previous test.
3.
The electrolyte level of each connected cell is between the minimum and maximum level indication marks.
c.
At least once per 18 months by verifying that:
1.
The cells, cell plates and battery racks show no visual indi-
~
cation of physical damage or abnornal deterioration.
~
2.
The cell-to-cell and terminal connections are clean, tight, and coated with anti-corrosion material.
3.
T,he resistance of each cell-to-cell and terminal connection is less than or equal to 0.01 ohms.
4 The battery charger will supply at least 200 amperes at 125 volts for at least 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, d.
At least once per 18 months, during shutdown, by verifying that the battery capacity is adequate to supply and maintain in OPERABLE status all of the actual emergency loads for 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> when the battery is subjected to a battery service test.
e.
At least once per 60 months, during shutdown, by verifying that the battery capacity is at least 80% of the manufacturer's rating when subjected to a performance discharge test. Satisfac6ory completion of this performance discharge test shall also satisfy the requirements of Specification 4.8.2.3.2.d if the performance discharge test is conducted during a shutdown where that test and l
the battery service test would both be required.
SALEM - UNIT 1 3/4 8-9 Amendment No. 70
/
o,,
UNITED STATES
.[
g NUCLEAR REGULATORY COMMISSION L
E WASHINGTON, D. C. 20555 PUBLIC SERVICE ELECTRIC AND GAS COMPANY PHILADELPHIA ELECTRIC COMPANY DELMA9.VA POWER AND LIGHT COMPANY AILANTIC CITY ELLLINIC COMPANY DOCKET NO. 50-311 SALEM NUCLEAR GENERATING STATION, UNIT NO. 2 AMENCHENT TO FACILITY OPERATING LICENSE Amendment No.45 License No. DPR-75 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by Public Service Electric and Gas Company, Philadelphia Electric Company, Delmarva Power and Light Company and Atlantic City Electric Company (the licensees) dated August 6,1985, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Comission's rules and regulations set forth in 10 CFR Chapter I; 8.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (1) that the activities authorized
~
by this amendment can be conducted without endangering the health-and safety 'of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-75 is hereby amended to read as follows:
4 (2)' Technical Specifications The Technical Specifications contained in Appendice's A and B, as revised through Amendment No.45, a re hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION tlw?,
fleven A. Varga, Director
~-
[4# TWR Project Directorate #3 Division of PWR Licensing-A
Attachment:
Changes to the Technical Specifications Date of Issuance: January 29, 1986
?
~
f O
ATTACHMENT TO LICENSE AMENDMENT NO. 45 FACILITY OPERATING LICENSE NO. DPR-75 DOCKET N0. 50-311 Revise Appendix A as follows:
Remove Page Insert Page 3/4 8-11 3/4 8-11 9*
r e
^
l
e.
l ELECTRICAL POWER SYSTEMS i
SURVEILLANCE REQUIREMENTS (Continued) 2.
The pilot cell specific gravity, corrected to 77'F and full electrolyte level, is greater than or equal to 1.200.
- 3..The pilot cell voltage is greater than or equal to 2.08 volts.
4 The overall battery voltage is greater than or equal to 125 vol ts.
b.
At least once per 92 days by verifying that:
1.
The voltage of each connected cell is greater than or equal to 2.13 volts under float charge and has not decreased more than 0.27 ' volts from the value observed during the original accept-r ance test.
2.
The specific gravity, corrected to 77'F and full electrolyte level, of each connected cell is greater than or equal to 1.200 and nas not decreased more than 0.02 from the value ob-served during the previous test.
3.
The electrolyte level of each connected cell is between the minimum and maxinum level indication narks.
c.
At least once per 18 months by verifying that:
1-The cells, cell plates and battery racks show no visual indi,
cation of physical damage or abnormal deterioration.
2.
The cell-to-cell and terminal connections are clean, tight, and coated with anti-corrpsion material.
3.
The res'istance of each cell-to-cell and terminal connection is j
less than or equal to 0.01 ohms.
4 The battery charger will supply at least 200 amperes at 125 volts for at least 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
d.
At least once per 18 months, during shutdown, by verifying that the battery capacity is adequate to supply and reintain in OPERABLE status all of the actual emergency loads for 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> when the battery is subjected to a battery service test.
4 e.
At least once per 60 months, during shutdown, by verifying that the battery capacity is at least 80% of the manufacturer's rating when subjected to a performance discharge test. Satisf actory completion of this performance discharge test shall also satisfy the requirements of Specification 4.8.2.3.2.d if the performance discharge test is conducted during a shutdown where that test and the battery service test would both be required..
SALEM - UNIT 2 3/4 8-11 Amendment No. 45
.