ML20205H944
| ML20205H944 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 01/15/1986 |
| From: | PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | |
| Shared Package | |
| ML20205H942 | List: |
| References | |
| EP-273-01, EP-273-1, NUDOCS 8601300040 | |
| Download: ML20205H944 (9) | |
Text
_ __
Paga 1 of 5
~,
3862000380 Revision 47 01/02/86
(
LIMERICK GENERATING STATION EMERGENCY PLAN PROCEDURE INDEX PROCEDURE REV.
DATE SIGNED DATE OF LAST NUMBER NO.
TITLE DY SUPER.
PERIODIC REVIEW EP-101 4
Classification of 03/25/85 10/26/84 Emergencies EP-102 9
Unusual Event Response 09/27/85 10/26/84 EP-103 12 Alert Response 09/27/85 10/26/84 EP-104 11 Site Emergency Response 09/27/85 10/26/84 EP-105 11 General Emergency Response 09/27/85 10/26/84 EP-106 4
Written Summary 04/01/85 10/26/84 Notification EP-110 6
Personnel Assembly and 03/14/85 10/26/84 Accountability EP-120 3
Site Emergency Coordinator 04/01/85 10/26/84 EP-201 4
Technical Support Center 03/29/85 03/29/85 (TSC) Activation
(
EP-202 3
Operations Support Center 12/12/84 10/26/84 (OSC) Activation EP-203 5
Emergency Operations 04/01/85 04/01/85 Facility (EOF) Activation EP-208 4
Security Team 12/12/84 _ 10/26/84 EP-210 3
Dose Assessment Team 12/12/84 10/26/84 EP-211 2
Field Survey Group 03/25/85 10/26/84 EP-220 CANCELLED
_ _- AE 1 Ib EP-221 CANCELLED gy }il B a =-
_ n a1I EP-222 CANCELLED EP-230 5
Chemistry Sampling and(3all ] M g/14/85 10/26/84 Analysis Team
)L M
B EP-231 10 Operation of Post-
%s/ N " 0B/09/
10/26/84 Accident Sampling Systems T1 fPASS) ma Lt T OI N hhiI EP-232 CANCELLED
(
yag88818t8%a p
4
P&gs 2 of 5 Revision 47 01/02/86
(
LIMERICK GENERATING STATION EMERGENCY PLAN PROCEDURE INDEX PROCEDURE REV.
DAT,E SIGNED DATE OF LAST NUMBER NO.
TITLE BY SUPER.
PERIODIC REVIEW j
EP-233 6
Retrieving and Changing 12/18/85 10/26/84 Sample Filters and Cartridges from the Containment Leak Detector During Emergencies EP-234 6
Obtaining Containment 12/18/85 10/26/84 Gas Samples from the Containment Leak Detector During Emergencies EP-235 5
Obtaining Reactor Water 03/14/85 10/26/84 Samples from Sample Sinks Following Accident Conditions EP-236 5
Obtaining Cooling Tower 03/14/85 10/26/84 Blowdown Line Water Samples Following Radioactive Liquid Release after Accident
(,
Conditions EP-237 7
Ontaining the Iodine /
03/28/85 10/26/84 Particulate and/or Gas Samples from the North Vent Wide Range Gas Monitor (WRGM)
EP-238 4
Obtaining Liquid Radwaste 12/12/84 10/26/84 Samples from Radwaste Sample Sink Following Accident Conditions EP-240 CANCELLED EP-241 8
Sample Preparation and 03/14/85 10/26/84 Handling of Highly Radioactive Liquid samples EP-242 5
Sample Preparation and 03/28/85 10/26/84 i
Handling of Highly Radioactive Particulate Filters and Iodine Cartridges EP-243 5
Sample Preparation and 12/12/84 10/26/84 Handling of Highly Radioactive Gas Samples EP-244 3
Offsite Analysis of 03/12/85 10/26/84
(
High Activity Samples
.j
Paga 3 of 5 Revision 47 01/02/86
(
LIMERICK GENERATING STATION EMERGENCY PLAN PROCEDURE INDEX PROCEDURE REV.
DATE SIGNED DATE OF LAST NUMBER NO.
TITLE BY SUPER.
PERIODIC REVIEW EP-250 2
Personnel Safety Team 12/12/84 10/26/84 EP-251 2
Plant Survey Group 12/12/84 10/26/84 EP-252 6
Search and Rescue /First 04/22/85 04/01/85 Aid Group EP-253 0
Personnel Dosimetry, 12/12/84 12/12/84 Bioassay, and Respiratory Protection Group EP-254 3
Vehicle and Evacuee 02/04/85 10/26/84 Control Group EP-255 2
Vehicle Decontamination 12/12/84 10/26/84 1
EP-260 2
Fire and Damage 12/12/84 10/26/84 Control Team EP-261 2
Damage Repair Group 12/12/84 10/26/84
('
Company Officials EP-272 4
Philadelphia Electric 02/04/85 10/26/84 Phone List EP-273 6
Limerick Station 01/02/86 01/02/86 Supervision Call List EP-275 CANCELLED EP-276 6
Fire and Damage 04/22/85 04/22/85 Team Phone List EP-277 7
Personnel Safety 04/30/85 04/30/85 Team Phone List EP-278 5
Security Team Phone 03/25/85 10/26/84 List EP-279 6
Emergency Operations 06/27/85 10/26/84 Facility (EOF) Group Phone List EP-280 7
Technical Support 06/27/85 10/26/84 Center Phone List EP-282 5
Government and 04/22/85 04/22/85 Emergency Management Agencies Phone List EP-284 4
Company Consultants 01/22/85 10/26/84 and contractors Phone List EP-287 3
Nearby Public and 02/11/85 10/26/84 Industrial Users of Downstream Water
l l
Page 4 of 5 Revision 47 01/02/86
(.
LIMERICK GENERATING STATION EMERGENCY PLAN PROCEDURE INDEX PROCEDURE REV.
DATE SIGNED DATE OF LAST NUMBER NO.
TITLE BY SUPER.
PERIODIC REVIEW EP-291 6
Staffing Augmentation 04/18/85 10/26/84 EP-292 9
Chemistry Sampling and 12/18/85 04/22/85 Analysis Team Phone List EP-294 6
Dose Assessment Team 04/22/85 04/22/85 Phene List EP-301 1
Operating the Evacuation 12/12/84 10/26/84 Alarm and River Warning System EP-303 3
Local Evacuation 12/12/84 12/12/84 EP-304 3
Partial Plant Evacuation 12/12/84 10/26/84 EP-305 5
Site Evacuation 03/25/85 10/26/84 EP-306 2
Evacuation of the 04/18/85 10/26/84 Information Center
{'
EP-307 2
Reception and Orientation 12/12/84 10/26/84 of Support Personnel EP-312 4
Radioactive Liquid 04/18/85 10/26/84 Release EP-313 2
Distribution of Thyroid 12/12/84 10/26/84 Blocking Tablets EP-314 1
Emergency Radiation 03/29/85 12/06/84 Exposure Guidelines and Controls EP-315 5
Calculation of Offsite 04/01/85 10/26/84 Doses During a (Potential)
Radiological Emergency Using RMMS in the l
Manual Mode EP-316 3
Cumulative Population 04/01/85 10/26/84 and Near Real-Time Emergency Dose Calculations for Airborne Releases Manual Method EP-317 3
Determination of 03/25/85 10/26/84 Protective Action Recommendations EP-318 2
Liquid Release Dose 04/01/85 04/01/85 Calculations hethod for Drinking Water
~
Paga 5 of 5 Revision 47 01/02/86
(
LIMERICK GENERATING STATION EMERGENCY PLAN PROCEDURE INDEX PROCEDURE REV.
DATE SIGNED DATE OF LAST NUMBER NO.
TITLE BY SUPER.
PERIODIC REVIEW EP-319 2
Fish Ingestion Pathway 03/29/85 03/29/85 Dose Calculation EP-325 3
Use of Containment 02/27/85 10/26/84 Dose Rates to Estimate Release Source Term EP-330 4
Emergency Response 03/14/85 10/26/84 Facility Haoitability FP-333 1
Adjustment of Wide 05/08/85 05/08/85 Range Gas Monitor Conversion Factors EP-401 2
Entry for Emergency 12/12/84 10/26/84 Repair and Operations EP-410 3
Recovery Phase 03/29/85 10/26/84 Implementation EP-500 2
Review and Revision 12/12/84 10/26/84 of Emergency Plan i
~.
(.
l*.
EP-273 Rev. 6 i.',
3862000390
""'*
- N1a
~
M i
PHILADELPHIA ELECTRIC COMPANY
[
LIMERICK GENERATING STATION 4
EMERGENCY PLAN IMPLEMENTING PROCEDURE l
1 i
EP-273 LIMERICK STATION SUPERVISION CALL LIST 1.0 PARTICIPANTS 1.1 Communicator contacts Station Supervision.
l 2.0 ACTIONS - IMMEDIATE i
2.1 Communicator shall contact people fron the
)
following list as required:
^
v.N
~
l 2.1.1 PLANT MANAGER:
,.e)
Heine Work l
l 2.1.2
.SUPERINTEN OP"ERATI,0NSW NO{hbEhy-SERVICES:
l 2.1.3 I
2.1.4 O
GE MANAGER:
I 2.1'.5 TECHNICAL ENGINEER:
2.1.6 ENGINEER - MAINTENAN 2.1.7 ENGINEER - OPERATIONS:
2.1.8 SENIOR HEALTH PHYSICIST:
)
- c 1
. ~... - - -..
. - - ~
m l-EP-273 Rev. 6 Page 2 of 4 I
MJR/mla I
2.1.9 SENIOR. CHEMIST:
Home Work !
2.1.10 ADMINISTRATIVE ENGINEER:
l 2.1.11 PERFORMANCE ENGINEER:
l 2.1.12 NUCLEAR SECURITY SPECIALIST:
I 2.1.13 SECURITY ADMINISTRATIVE ASSISTANT:
2.1.14 INSTRUMENTATION & CONTROL ENGINEER 2.1.15 REACTOR ENGINEER:
~
2.1.16 APPLIED HEALTH PHYSICIST:
l l
{
2.1.17 HEALTH PHYSICIST - TECHNICAL SUPPdRT
,;?
2.1.18 ASSISTANT ENGINEER - MAINTENANCEf l
M
,A ld l
l
'l.
EP-273 Rev. 6 Pa9e 3 of 4 I
MJR/mya
,f' 2.2 SHIFT SUPERINTENDENT:
Home Work-2.2.1
\\\\'
2.2.2 2.2.3 2.2.4 2.2.5 2.2.6 l
{ 2,3 SHIFT SUPERVISORS 2.3.1 k,2.3.2 f
l 2.3.3 1
2.3.4 2.3.5 2.3.6 2.3.7 2.3.8 3
i
- 2.3.9
!2.3.10 l
2.3.11 7
3.0 ACTIONS-FOLLOWUP None required.
l
{
4.0 APPENDICES None.
,- ; 'l EP-273 Rev. 6 Page 4 of 4
,.l.
MJR/mla 5.0 SUPPORTING INFORMATION 5.1 Purpose The purpose of this procedure is to provide information for contacting Station Supervision.
5.2 Criteria for Use This procedure may be used when it is necessary to contact members of Station Supervision.
5.3 Special Equipment None.
5.4 References None.
h
.:.= _
.