ML20205H540
| ML20205H540 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 03/25/1987 |
| From: | Mihalcik J BALTIMORE GAS & ELECTRIC CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| FCM-87-072, FCM-87-72, NUDOCS 8704010091 | |
| Download: ML20205H540 (2) | |
Text
o BALTIMORE GASAND ELECTRIC CHARLES CENTER P.O. BOX 1475 BALTIMORE, MARYLAND 21203 NUCLEAR ENGINEERING SERVICES DEPARTMENT
[uYvuS $ o* NE " ~ ~
March 25,1987 FCM 87-072 U. S. Nuclear Regulatory Commission Washington, DC 20535 ATTENTION:
Document Control Desk StJBJECT:
Calvert Cliffs Nuclear Power Plant Unit Nos.1&2: Docket Nos. 50-317 and 50-318 Typographical Error in Response to Request for Additional Inf ormation (Rcference (a))
REFERENCES:
(a) 1.etter from Mr. 3. A. Tiernan (BG&E), to NRC, dated March 17,1987, Response to Request for Additional Information - Moderator Temperature Coeificient Amendment and Unit 2 Cycle 8 Reload Request, February 19,198/
(b)
Telephone conversation between Mr. 3. A. Mihalcik (BG&E),
and Mr. S. A. McNeil (NRC), March 6,1987 Gentlemen:
On page 3 of Reference (a) in the last paragraph, prior to the oath or affirmation statement, BG&E agreed to resporvi to the Feed 1.Inc Break / Design Basis Event issue no later than March 31, 1987. This date should read Maich 31, 1988. This date allows adequate time to respond prior to the Unit I Cycle 10 startup (although our Intention is to respond much before then), as discussed during the telephone conversation on March 6, 1987 (Reference (b)).
Very truly yours, AT 3.A. Mihalcik
) Fuel Cycle Management JAM /Imt 1
ppi 07040100'/1 nyo323
- ,Dit AcacK c500o337 v
'y von
.\\
C1 k
Document Contr:1 Desk March 25,1987 l
Page 2 cc:
D. A. Brune, Esquire
- 3. E. Silberg, Esquire i
A. C. Thadani, NRC
- 5. A. McNeil, NRC T. E. Murley, NRC T. Foley/D. A. Trimble, NRC l
l l
l
[
r l
l l
l
-m
,_