ML20205H173

From kanterella
Jump to navigation Jump to search
Mod 3,providing Incremental Funding & Changing Project Officer,To Virginia Regional Seismographic Network
ML20205H173
Person / Time
Issue date: 03/26/1987
From: Wiggins E
NRC OFFICE OF ADMINISTRATION (ADM), VIRGINIA POLYTECHNIC INSTITUTE & STATE UNIV., BLACKSB
To:
Shared Package
ML20205H165 List:
References
CON-FIN-D-1597, CON-NRC-04-85-121, CON-NRC-4-85-121 NUDOCS 8703310644
Download: ML20205H173 (2)


Text

iL i Au.c, coot e*71 P aw

'AMENDMEt(T OF SOUCITATIONMODIFICATION OF CONTRACT 1

g 2

a,Ause.owsNvisoo.r.CAi.o no.

a ursC1 vs oAva

4. nano s.i.o.cs.cr.A.

.a. no.

i. paoar ci no. arr.e.,ar.u,,

MAR 2 6 E RFPA RES-85-121 dtd 3/6/E 7 The A fu

4. 886WLo SV
7. AcessNs61L ato a y <Jf eraer phen Jermi d ;

[

U.S. Nuclear Regulatory Comission Division of Contracts Washington DC 20555 e

a. naut ANo Aoontss or con = Acion vu....n.ac.e ne, sa e.nv ase ce*,

m ea. AutNowtNi or souCn Avion No.

Virginia Polytechnic Institute and State University Office of Sponsored Programs

,s. oAito uts mu ss, 301 Burruss Hall Blacksburg, Virginia 24061 i.A..ooi,,CAvioN or CoNv=AcifOnote.

No.

X NRC-04-85-121 8 8. oA1LD ($EK iT&u la)

CoOE lr ACitif Y Coot 8/12/85

11. THIS ITEM ONLY APPLIES TO AMENDMENTS.0F SOLICITATIONS The above numbered solicitation is emended as set forth in item 14. The hour and date specif sed for re:mipt of Offers is entended.

is not e n-Caded.

Of fera must och nowledge receipt of this amendrrent preor to the hour and date specif.ed in the sol. citation or es amended.by one of the following methods fe) By completing items 8 and 15.end returning copies of the amendment. lb) By e:knoatedg no receipt of this amendment on mech copy of the offe-submitted. or Icl By separate letter or teleg<sm wh ch includes a reference to the sofecitation and amendment numbe's FAILURE OF YOUR ACKNOWLEDG MENT TO BE RECEIVED AT THE PLACE DEslGNATED FOR THE RECEIPT OF OFFE Rs PRIOR TO THE HOUR AND DATE sPECIFIED MAY RESULT IN CEJECTION OF YOUR OFF E R. If by virtue of this amendment you desire to thener en offe' enready submitted.sach change may be made by trieg em e-ttier.ptovided each teteg<sm or letter men es teference to the mat citation and this amendment, and 6: received prior to the opening hour end date specif.ed

32. ACCOUNTING ANo APPAoPAtAllON OAT A isf aveuPed)

B&R:

60-19-02 FIN: D1597 Amount:

$136,000

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS / ORDERS, IT MODIFIES THE CONTRACT / ORDER NO. AS DESCRIBE 0 IN ITEM 14.

^ t ' 'c'1"A*et N !.',4 N'J #R '" "'" ^ " " ' "'""' " *" " "" "^ * "' " " " ' " '" " '" " ^ " ' "" ' ' ' ' "" ~ ~

A

  • ?,",' ^*,Y.'i t.1,"E"/af ?='.7/?v"?J".'.$4P&'AN8 "WU1No"ah^v #,"Tn"Ni.>M"^*""'"' "'"'"""'"""'"

y C.THeb SUPP6EMLNT AL AGMLEMENT 15 ENTEREo INTO PURSUANT TO AV1HoRef v Or s D.01HL k t&reenft espe of modiferehen and eetherssp)

MPORTANT: Contractor is not, b is required to sign this document and return copies to the issuing office.

U Ti'btsC n.Ps son or AutNoutN1tuoose sC As son rora.nues s, ver.ren.n s..s.nur. eneu.s.nu uen.n..utant un..weet m.nar sun. f wswo The purpose of this modification is to provide incremental funding and change the Project Of ficer. Therefore, this contract is revised as follows:

1.

Paragraphs 2 and 3 of Section G. Paragraph G.1, Consideration, Estimated Cost and Obligation, are revised to read as follows:

"2.

Total funds currently available by the Government for payment and allotted to this contract are $496,000.00.

g,e,s,o r..

e....n. en t.,ms ans..nsin.....e,. e u.n.ni r...,.n

.e in n.m...e

... e s...i. e,..n.n......~. ins on n.n..e one in e.n.r..

)$ A. N AML ANo 141LL Or SIGNE se (Type er artato 16A. NAML ANo TaTLL or CONT R ACTsNG or rICLH (Type orannes Elois J. Wiggins lit. CONT R AC T ON/Or r E NOR llc.oAtt SIGNLo 16 8. UNI (t>&1AT S OF A L RIC A 36C. oATL SIGNt; gy L

/44*

O M f

esenature et par.on unkarare so.wns esen.%rr et cinr}repne otterers

/

Nv's$siiNTYN!sh 8703310644 070326 N.#",i,. s i,, 'GU" " ' " ' ** ' ' *

  • c PDR CONTH r An les Cr mi ss.sas NRC-04-05-121 PDR

+..

NRC 54-85-121 Modification No. 3 Page 2 of 2 3.

It is estimated that the amount currently allotted by the Government will cover performance of the required effort herein through November 30, 1987."

2.

The Project Officer named in Section F is revised as follows:

From: Na'me and Mail Code:

Dr. Andrew Murphy.

Office Address:

U.S. Nuclear Regulatory Commission Mail Stop:

1130-55 Washington, DC 20555 Telephone Number:

(301) 427-4078

' r. Richard McMullen To:

Name and Mail Code:

M Office Address:

U.S. Nuclear Regulatory Commission Mail Stop: NL-007 Washington, DC 20555 Telephone Number:

(301) 443-7813 All other terms and conditions, including the ceiling in the amount of

$583,561.00, remain the same.

e l

1

. -. _ - -.. - _ -.. - - - - -. - -. -. -., -,.. _ _, -.,. _ -, -,. _. - - -.. - -,. - -.. -