ML20205H143
| ML20205H143 | |
| Person / Time | |
|---|---|
| Site: | Byron, Braidwood, 05000000 |
| Issue date: | 10/24/1988 |
| From: | Chrzanowski R COMMONWEALTH EDISON CO. |
| To: | Murley T Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20205H147 | List: |
| References | |
| 5171K, NUDOCS 8810280400 | |
| Download: ML20205H143 (1) | |
Text
-
'~'N Commonwealth Edison
./
) Oca rsrst Ns'ional FPia Chica;o. In no s
'i 7 Addr:ss R: ply to. Post Oftce B37 767
,/ Chicago, ininois 60690 sv October 24, 1988 Mr. Thomas E. Murley, Director Office of Huclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC. 20555
Subject:
Byron Station Units 1 and 2 Braldwood Station Units 1 and 2 Hotification of Bases Change to Technical Specification N RC_Ro c k e L H o s._502414,_50:455, _50 - 4 56_and_50 - 451 Dear Hr. Murleyt Commonwealth Edison is notifying you of a bases change to the Byron and Braidwood Stations Technical Specifications.
The change to bases page B 3/4 3-3 revises the description of the function of the P-4 Engineered Safety Teatures Actuation System interlock. The revised Technical Speelfication bases page is contained in Attachment A.
The change to the bases has been both onsite and offsite reviewed.
Please direct any questions you may have on this matter to this office.
Very truly yours, v7/.9fjg R. A hrsanowski Nuc1' ear L.icensing Administrator RAC/klj att.
cc Resident Inpector-Byron Resident inspector-Braldwood L.h. Olshan-NRR S. Sands-NRR Region III Office j
4 9
,1 m h"
ren sus!!r P