Forwards Response to 850618 Request for Addl Info Re Generic Ltr 83-28,Items 4.2.1 & 4.2.2 Concerning Preventive Maint Program for Reactor Trip Breakers/Maint & Trending.Reactor Monitoring Program Will Trend Listed Parameters
ML20205G552
Person / Time
Site: Beaver Valley
Issue date: 11/04/1985
From: Carey J
DUQUESNE LIGHT CO.
To: Knighton G
Office of Nuclear Reactor Regulation
References
2NRC-5-145, GL-83-28, TAC-62949, NUDOCS 8511130282
Download: ML20205G552 (3)


Text

'

f'

[

'Af (41 7sI-5I41 Nn**dn P azs?Bdi g Suite 210 Telem Pittsburgh. PA 15205 November 4, 1985 United States Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Mr. George W. Knighton, Chief Licensing Branch 3 Office of Nuclear Reactor Regulation

SUBJECT:

Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 Response to Request for Additional Information (RAI) Regarding Preventive Maintenance Program for Reaction Trip Breakers /Mainte-nance and Trending

REFERENCE:

RAI Letter from Mr. George W. Knighton, Chief, Licensing Branch No. 3 to Mr. J. J. Carey, Vice President, Nuclear, dated June 18, 1985 Gentlemen:

Attached is the response to the NRC RAI letter addressed to Mr. J. J.

Carey, dated June 18, 1985. This RAI requested additional information be submitted regarding Generic Letter 83-28, Items 4.2.1 and 4.2.2.

DUQUESNE LIGHT COMPANY By J/. J. Carey /v Vice President SDH/wjs Attachment cc: Mr. B. K. Singh, Project Manager (w/a)

Mr. G. Walton, NRC Resident Inspector (w/a)

SUBSCRIBED AND SWORN TO BEFORE ME-THIS 44/ DAY OF 77eu m/vu , 1985.

n,ik. .u.) / I)L Notary Public B511130282 851104 j PDR ADOCK 05000412 PDR ANITA ELAINE REiTER,tagn4y pygtge !jf A

ROBlflSON TOWNSHfP, L/t .LjTJ.iEff/60VNTY 8

MY COMMISSION EXFfRES OCWE() go,1986

' 1 _ United Stat;s Nucl2ar R:gulatory Commi ssi tn Mr. George W. Knighton, Chief Response-to RAI ...

Page 2 COMONWEALTH OF PENNSYLVANIA )

) SS:

COUNTY OF ALLEGHENY )

On.tnis // day of /)c/7 c , ///'I , before me, a Notary Public in and for said Commonwealth and County, personally appeared E. J. Woolever, who being duly sworn, deposed and said that (1) he is Vice President ofiDuquesne Light, (2) he is duly authorized to execute and file the foregoing Submittal on behalf of 'said Company, and (3) the statenents set forth in the Submittal are true and correct to the best of his knowledge.

Notary Public ANITA CLA;f!E REiTE9, i MARY PUGLIC ROBINSON TOWNssir. ALLEUHENY COUNT /

MY COMMISSION CXFIRES GCToctn 20,1999

<n i, ;"

6:

~

-.BV-2 Response to Request for . Additional Information (RAI) Regarding Preven-

- tive Maintenance Program for Reactor Trip Breakers / Maintenance and Training c

At BV-2,.the preventive maintenance progran will include the Group A _and

' Group B activities described in the Westinghouse Maintenance Manual for

- the' DS-416 Reactor' Trip Circuit Breaker, Rev. 0, dated October 1984.

These activities 'will be performed in accordance with the schedule dis-cussed 'in Section 3.5'of the above Westinghouse Maintenance Manual. In line;. with Sections 1.0. and 3.1 of the above Westinghouse Maintenance Mgnual, a caution will be ' added to appropriate maintenance precedures against undocumented adjustments or modifications to the reactor trip

breakers. The reactor trip breakers monitoring progran will trend, as a minimum, the following 'paraneters as data becomes available from mainte-

' nance, operations, and testing:

- 1. Breaker response time for undervoltage trip

2. Dropout voltage for undervoltage trip

~ 3. ' Breaker insulation resistance

4. Trip force

/

e *

\