Forwards Draft Outline for Technical Evaluation Rept Re Review of Proposed Lakeview Remedial Action.Outline Provides General Guidance Re Specific Issues to Be Covered within Each Technical Area
ML20205F698
Person / Time
Issue date: 11/04/1985
From: Garcia P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Hawkins E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
REF-WM-64 NUDOCS 8511120446
Download: ML20205F698 (2)


Text

,

P w  !

, a me UNITED STATES

['

o y ';

1 o NUCLEAR REGULATORY COMMISSION REGION IV O [

,/ URANIUM RECOVERY FIELD OFFICE

      • DENVER,C L DO 90225 NOV 0 41985 _ Dn= do.

PDR_ -

LPDR URF0:PJG Distribution:

Docket No. WM-181 ISal/# n A egye.e_

0400181301E .d. All Asut&AGMN _13 MEMORANDUM FOR:

Edward F. Hawkins, Chief (Return to WM,623 SS)

~

~ ~

Licensing Branch 1 Uranium Recovery Field Office, Region IV FROM: Pete J. Garcia, Jr., Project Manager Licensing Branch 1 Uranium Recovery Field Office, Region IV

SUBJECT:

TECHNICAL EVALUATION REPORT (TER) FOR LAKEVIEW TITLE I SITE Attached is a draft outline for preparation of the TER documenting URF0 review of the proposed remedial action at the Lakeview site. The outline basically corresponds to that transmitted to URF0 by memorandum from L. Higginbotham to R. D. Smith dated September 16, 1985, but does contain minor changes to account for URF0 staff review responsibilities. The draft outline provides general guidance regarding the specific issues to be covered within each technical area. Detailed information regarding the technical content of the various review area chapters is provided in the memorandum referenced above and in the Standard Review Plan prepared by the Division of Waste Management.

'- t hn_. ' 'l. .

Pete Garcia, Jr., Project Manager Licensing Branch 1 Uranium Recovery Field Office Region IV

Attachment:

As stated , ,

co r

" o cc: T. Johnson R. Brich :e n8 S. Wastler W gM T. Olsen 4 g;;

-L. Higginbotham' mo o 5 R. D. Smith m m esgiig%estio4 p wet-64

i

- ~~  ;

e Attachment LAKEVIEW TECHNICAL EV LUATION REPORT I. Introduction / Description of Proposed Remedial Action - Sandy II. Surface Water and Erosion Protection - Ted/Pete

- A. Hydrologic characterization B. Flood determinations C. Erosion protection

. D. Conclusions i 'III. Geology / Seismology - Sandy A. Geologic site characterization

B. Seismotectonic site characterization Determinatica of design acceleration C.

'D. Conclusions IV. Geotechnical Stability - Pete A. Geotechnical site characterization

! B. Soil properties

C. Technical analyses i D. Construction considerations

, E. Conclusions i V. Water Resources - Tom A. Hydrogeologic site characterization (processing and disposal sites)

B. Ground water impacts and restoration measures (processing site)

C. Ground water impacts and preventative measures (disposal site)

D. Conclusions l

VI. Radon Attenuation / Site Cleanup - Randy /Pete A. -Characterization of tailings _ and cover material B.- Radon attenuation C. Site cleanup (off-pile and underlying soils)

D. Conclusions l

' VII. Summary / Outstanding Issues - Sandy

- -- . - , , - . . -- - --, . . - - - . . . . - - , - .. .