ML20205F375

From kanterella
Jump to navigation Jump to search
Forwards Amend 5 to Topical Rept VEP-1-5A, QA Program, Operations Phase, Reflecting Organizational Changes.Changes Do Not Reduce Commitments in Program Description Previously Approved by NRC
ML20205F375
Person / Time
Site: Surry, North Anna, 05000000
Issue date: 03/23/1987
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20205F378 List:
References
87-076, 87-76, NUDOCS 8703310149
Download: ML20205F375 (2)


Text

__

10 CFR 50.54a VINGINIA ELECTRIC AND POWER COMPANY Hicitwonn,VinoxxxA 2006:

W.L.STEWANT ncE.5. o7'."Eo.

M reh 23, 1987 United States Nuclear Regulatory Commission Serial No.87-076 Attention: Document Control Desk N0/RCB:dmk Washington, D.C.

20555 Docket Nos.

50-280 50-281 50-338 50-339 License Nos.

DPR-32 DPR-37 NPF-4 NPF-7 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 NORTH ANNA POWER STATION UNITS 1 AND 2 QUALITY ASSURANCE PROGRAM-OPERATIONS PHASE TOPICAL REPORT VEP 1-5A (UPDATE)

Pursuant to 10CFR 50.54a, changes to the quality assurance program description are submitted. These changes do not reduce the commitments in the program description previously approved by the Nuclear Regulatory Commission. The changes reflect organizational changes and are contained in the attached updated pages of the Topical Report and Synopsis of Changes.

Should there be any questions regarding this matter, please feel free to contact me.

Very truly yours, I

i~6AC

)}

W. L. Stewart l

Attachments i

1.

QA Topical Report 1-5A (Updated Pages) 2.

Synopsis of Changes 8703310149 870323

~

0k DR ADOCK 05000280 0

PDR 4

l

cc:

U. S. Nuclear Regulatory Commission Marietta Street, N.W.

Atlanta, GA' 30323 Mr. W. E. Holland NRC Senior Resident Inspector Surry Power Station Mr.

J..L. Caldwell NRC Senior Resident Inspector North Anna Power Station

__._..