Provides Alternate Wording for Proposed Tech Spec Change 88-13,per 880923 Telcon Between TVA & NRC
ML20205F310
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 10/20/1988
From: Gridley R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8810280040
Download: ML20205F310 (3)


Text

.... - - -

I o

f TENNESSEE VALLEY AUTHORITY CH ATTANOOG A. TENNESSEE 37401 SN 1578 Lookout Place OST to W U.S. Nuclear Regulatory Commission I

ATTN: Document Control Desk Washington, D.C.

20555 i

s i

Gentlemen:

In the Matter of

)

Docket Nos. 50-327 i

Tennessee Valley Authority

)

50-328 1

SEQUOYAH NUCLEAR PLANT (SQN) - TECHNICAL SPECIFICATION CHANGE 88-13 I

Reference:

TVA letter to NRC dated July 27, 1988 I

In response to the September 23, 1988 telephone conference call between 1

TVA and NRC on technical specification change 88-13, TVA is providing

l alternate wording for the proposed change.

The alternate wording.

included in the enclosure, does not change the intent of the original

]

wording.

This change provides clarity in ensuring proper interpretation I

of the proposed specification change to avoid any future misunderstandings.

i i

]

Please direct questions concerning this issue to J. W. Proffitt at (615) 870-7461.

.I Very truly yours, TENNESSEE VALLEY AUTHORITY j

4 9_

R. Gridley, Manag

{

i Nuclear Licensing and Regulatory Affairs Enclosure cc:

See page 2 1

1 f

I l

1 4

l 0@

l t

I\\

i 8810280040 8S1070 POR ADOCK 0500C327 An Equal opportunity Employer P

poc

ai.

. i U.S. Nuclear Regulatory Commission OST 20 E88 i

l cc (Enclosure):

Ms. S. C. Black, Assistant Olrector forProjects i

TVA Projects Olvision l

4 I

U.S. Nuclear Regulatory Commission One White Flint, North i

11555 Rockville Pike j

Rockville, Maryland 20852 I

Mr. F.-R. McCoy, Assistant Director

[

for Inspection Programs t

l TVA Projects Olvision

(

U.S. Nuclear Regulatory Commission

~

Region II 101 Marietta StJut, NH, Suite 2900 Atlanta, Georgia 30323 i

Sequoyah Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road j

3 Soddy Daisy, Tennessee 37379 j

1 American Nuclear Insurors

[

l Attention:

Librarian j

The Exchange, Suite 245 270 Farmington Avenue f

1

)

Farmington, Connecticut 06032

?

t 1

i j

l I

l l.

t u

i i

e e

i i

t I

l 7

t

_.__ _... _ _ _ _ _ _. _... _ _ _ _ _ _ _ _, _ _. _.. _ _. _ _ _.. _,, _ _ _ _. ~ _ _ _ _ _ _. _,

~.

I l

ENCLOSL'RE SQN TECHNICAL SPECIFICATION CHANGE 88-13 INSERT A 3.

Verifying, by visual inspection of a representative random sample of at l

least 54 flow passages (33 percent) per ice condenser bay, that the j

accumulation of frost or ice on flow passages between ice baskets, past lattice frames, through the intermediate and top deck floor grating, or a

i j

past the lower inlet plenum support structures and turning vanes is less i

than or equal to 15-percent blockage of the total flow area in each bay, j

with a 95-percent level of confidence.

]i If the summation of blockage from the sample falls to meet the acceptance criteria, then 100 percent of the passages of that bay snall be j

inspected.

If the 100-percent inspection falls to meet the acceptance criteria, then the flow passages shall be cleaned to meet the acceptance i

i criteria.

Each flow passage that is cleaned will be reinspected. Any

[

i inaccessible flow passage that is not inspected will be considered blocked.