f TENNESSEE VALLEY AUTHORITY CH ATTANOOG A. TENNESSEE 37401 SN 1578 Lookout Place OST to W U.S. Nuclear Regulatory Commission I
ATTN: Document Control Desk Washington, D.C.
20555 i
s i
Gentlemen:
In the Matter of
)
Docket Nos. 50-327 i
Tennessee Valley Authority
)
50-328 1
SEQUOYAH NUCLEAR PLANT (SQN) - TECHNICAL SPECIFICATION CHANGE 88-13 I
Reference:
TVA letter to NRC dated July 27, 1988 I
In response to the September 23, 1988 telephone conference call between 1
TVA and NRC on technical specification change 88-13, TVA is providing
- l alternate wording for the proposed change.
The alternate wording.
included in the enclosure, does not change the intent of the original
]
wording.
This change provides clarity in ensuring proper interpretation I
of the proposed specification change to avoid any future misunderstandings.
i i
]
Please direct questions concerning this issue to J. W. Proffitt at (615) 870-7461.
.I Very truly yours, TENNESSEE VALLEY AUTHORITY j
4 9_
R. Gridley, Manag
{
i Nuclear Licensing and Regulatory Affairs Enclosure cc:
See page 2 1
1 f
I l
1 4
l 0@
l t
I\\
i 8810280040 8S1070 POR ADOCK 0500C327 An Equal opportunity Employer P
poc
ai.
. i U.S. Nuclear Regulatory Commission OST 20 E88 i
l cc (Enclosure):
Ms. S. C. Black, Assistant Olrector forProjects i
TVA Projects Olvision l
4 I
U.S. Nuclear Regulatory Commission One White Flint, North i
11555 Rockville Pike j
Rockville, Maryland 20852 I
Mr. F.-R. McCoy, Assistant Director
[
for Inspection Programs t
l TVA Projects Olvision
(
U.S. Nuclear Regulatory Commission
~
Region II 101 Marietta StJut, NH, Suite 2900 Atlanta, Georgia 30323 i
Sequoyah Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road j
3 Soddy Daisy, Tennessee 37379 j
1 American Nuclear Insurors
[
l Attention:
Librarian j
The Exchange, Suite 245 270 Farmington Avenue f
1
)
Farmington, Connecticut 06032
?
t 1
i j
l I
l l.
t u
i i
e e
i i
t I
l 7
t
_.__ _... _ _ _ _ _ _. _... _ _ _ _ _ _ _ _, _ _. _.. _ _. _ _ _.. _,, _ _ _ _. ~ _ _ _ _ _ _. _,
~.
I l
ENCLOSL'RE SQN TECHNICAL SPECIFICATION CHANGE 88-13 INSERT A 3.
Verifying, by visual inspection of a representative random sample of at l
least 54 flow passages (33 percent) per ice condenser bay, that the j
accumulation of frost or ice on flow passages between ice baskets, past lattice frames, through the intermediate and top deck floor grating, or a
i j
past the lower inlet plenum support structures and turning vanes is less i
than or equal to 15-percent blockage of the total flow area in each bay, j
with a 95-percent level of confidence.
]i If the summation of blockage from the sample falls to meet the acceptance criteria, then 100 percent of the passages of that bay snall be j
inspected.
If the 100-percent inspection falls to meet the acceptance criteria, then the flow passages shall be cleaned to meet the acceptance i
i criteria.
Each flow passage that is cleaned will be reinspected. Any
[
i inaccessible flow passage that is not inspected will be considered blocked.