ML20205E754

From kanterella
Jump to navigation Jump to search
Informs That Util Will Issue Procedure Implementing Vendor Seismic Qualification Documentation Retrieval Plan by 881118,per Integrated Design Insp Item D3.6-1 in Insp Repts 50-327/87-48 & 50-328/87-48
ML20205E754
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 10/20/1988
From: Gridley R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8810270465
Download: ML20205E754 (3)


Text

I TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 37401 5N 1578 Lookout Place 08T 201988 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Hashington, D.C.

20555 Gentlemen:

In the Matter of

)

Docket Nos. 50-327 Tennessee Valley Authority

)

50-328 SEQUOYAH HUCI. EAR PLANT (SQN) - INTEGRATED DESIGN INSPECTION (IDis - NRC INSPECTION REPORT 50-327/87-48 AND 50-328/87-48

Reference:

TVA letter to NRC dated March 2, 1988 TVA provided the revised response to IDI item 03.6-1 in the reference letter and committed to develop a formal retrieval program for vendor seismic qualification documentation within 90 days after restart of unit 2.

TVA developed and issued a program plan on August 11, 1988.

TVA will issae the procedure that implements this plan by November 18, 1988.

Summary statements of commitments contained in this submittal are provided in the enclosure. Please direct questions concerning this issue to J. H. Prcffitt at (615) 870-6847.

Very truly yours, TENNESSEE VALLEY AUTHORITY

}

R. Ge diey, n ger Nuclear Licensing and Regulatory Affairs Enclosure cc: See page 2 go!

I l

8G10270465 881020 1'

POR ADOCK O'J000327 An Equal opportunity Employer

k.'.

U.S. Nuclear Regulatory Commission 0GT 20 M cc (Enclosure):

Ms. S. C. Black, Assistant Director for Projects IVA Projects Division U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 Mr. F. R. McCoy, Assistant Director for Inspection Programs TVA Projects Division U.S. Nuclear Regulatory Commistion Region II 101 Harletta Street, NH, Suite 2900 Atlanta, Georgia 30323

.Sequoyah Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, Tennessee 37379

, 'o '.

ENCLOSURE SQN IDI NRC INSPECTION REPORT 50-327/87-48 AND 50-328/87-48 TVA will issue a procedure to implement the vendor seismic qualification documentation retrieval plan by November 18, 1988.

l I

1

___..__________m._

. _ _ _.